تخمین مخازن در چاههای اکتشافی

Slides:



Advertisements
Similar presentations
The.
Advertisements

FORM 1027 – BOTTOM HOLE PRESSURE TEST. This presentation will assist you in the completion of the Form The bottom hole pressure test. Date of Last.
DANGER! Abandon This Area ! COUNTDOWN FOR NEXT EXPLOSION STARTS NOW!
Aquifer Storage & Recovery Projects Utah Water Users Workshop March 18, 2014 Kurt Vest, P.E. Region Engineer.
OIL SHALE – contains Kerogen Tar sands – contain bitumen.
High-Frequency Sight Words
1. Fundamentals of Global Energy Business Michael J. Orlando University of Colorado - Denver week 2: Supply of Energy video 4: Where are Primary Energy.
Reserve Evaluation for Enhance Oil Recovery Purposes Using Dynamic Reserve Evaluation Model Woodside Research Facility GPO Box U 1987 Perth West Australia.
Reservoir Simulation Study
World Resources Institute World Commercial Energy Supply (1998)
The.
Fossil Fuels (N) Subject: Science (Grade 5) Prepared by: Faculty Member of PGS.
Robert Bryce.  George Mitchell: Texas energy baron  1997 discovered hydraulic fracturing ▪ Hydraulic fracturing, or “fracking,” (a drilling process.
Res A Performed By Gemini Solutions, Inc. May 2001.
Time Remaining 20:00.
Chapter 14 The Behavior of Gases. Section 14.4 Gases: Mixtures & Movement l\
Earth’s Changing Environment Lecture 8 Global and US Fossil Fuel Resources: Coal.
Four Ways To Speed Up The Rate Of Dissolving:. 1-Stirring.
Date of download: 11/12/2016 Copyright © ASME. All rights reserved. From: Characterization and Prediction of Gas Breakthrough With Cyclic Steam and Gas.
Lecture 9 Liquid Properties 10/10/2014.
5.7A.
Date of download: 10/13/2017 Copyright © ASME. All rights reserved.
From: Boilers Optimal Control for Maximum Load Change Rate
Figure 1. Rate of Return Systems.
The membrane keeps the chlorine gas away
World Commercial Energy Supply (1998)
Date of download: 11/6/2017 Copyright © ASME. All rights reserved.
Date of download: 12/20/2017 Copyright © ASME. All rights reserved.
Date of download: 12/24/2017 Copyright © ASME. All rights reserved.
Solubility -the ability of one substance to dissolve in another
Gas Condensate PVT A worked example to estimate
Formation of Oil.
GDP.
Solubility CN What is solubility?
Gas Condensate PVT A worked example to estimate
9.1 Major Energy Sources Nonrenewable energy sources- resources that are being used faster than they can be replenished. Coal, oil, and natural gas Renewable.
Soil Vocabulary.
Carbon FAQ’s.
The rise of BRICs and resource implications of superpower growth
Phase Diagrams: Solid, Liquid & Gas Roadmaps
Fall 2016 Exam 1. d 9. a 16. a. (i.) 2. e 10. b or 3. c 11. c
Modeling Natural Fracture Networks in the Context of Flow Simulations: Teapot Dome, Wy Thomas H. Wilson, Department of Geology and Geography, West Virginia.
CCE and CVD results The usual PVT measurements on gas condensates are
CO2 Capture and Storage Potential for Reducing CO2 Emissions
Introduction to the Gulltopp Satellite Field
Use of GIS in the USGS World Petroleum Assessment 2000 Debra K
Chapter 13 States of Matter 13.2 The Nature of Liquids
Introduction To Boilers And Hot Water Heaters
Carbon FAQ’s.
Seismic Line Across ‘Alpha’
8.5 The Combined Gas Law Under water, the pressure on a diver is greater than the atmospheric pressure. The combined gas law comes from the pressure–volume–temperature.
Natural resources A natural resource is a material that is found in nature that is essential or useful to people.
CCE and CVD results The usual PVT measurements on gas condensates are
Name the 3 elements necessary for a fire to exist.
60 MINUTES REMAINING.
Evaluation of reserve growth for oil
Energy Stats Analysis 2014 Corporate Energy Desk
Coal By: Jakob, CJ, and David.
Busch Vacuum Technology
Fracking in Culver City
ME Consultancy Services
Gases Charles’ Law.
Warm Up: Solve for x 1. 28=4x =5x 3. (50)(5) = (10)(5)x.
Sun 4th Grade Science.
Gas Condensate PVT A worked example to estimate
Water inputs for hydraulic fracturing.
Fig. 3 Oil, gas, and FP water variations with time.
Collecting a gas over water
Natural Resources.
INTRODCTION OF OIL AND GAS INDUSTRY :.
Presentation transcript:

تخمین مخازن در چاههای اکتشافی تخمین مخازن در چاههای اکتشافی (بخش سوم) محمد امین غلامزاده

تعاریف اولیه مهندسی مخازن

1) نفت درجای اولیه (Initial Oil In Place) به حجم کل نفت درون فضاهای خالی مخزن در شرایط استاندارد و هنگامی که هنوز برداشت از آن مخزن شروع نشده است ، نفت درجای اولیه گفته می شود که دارای واحد (STB) است .

2) نفت درجا (Oil In Place) به کل حجم نفت درون فضاهای خالی مخزن در شرایط استاندارد و در هر لحظه پس از تولید از آن مخزن ، نفت درجا گفته می شود که دارای واحد (STB) است .

3) نفت باقی مانده درون مخزن (Remaining Oil In Place) به مقدار نفت باقی مانده درون مخزن پس از برداشت نهایی از آن مخزن ، نفت باقی مانده درون مخزن گفته می شود .

چاه را برای همیشه بسته ایم. به طور مثال بعد از 2 روز بعد از 5 روز 10 STB 8 STB 3 STB نفت درجای اولیه نفت درجا نفت باقی مانده بعد از 7 روز تولید ، چاه را برای همیشه بسته ایم.

4) گاز درجای اولیه (Initial Gas In Place) به حجم کل گاز درون فضاهای خالی مخزن در شرایط استاندارد و هنگامی که هنوز برداشت از آن مخزن شروع نشده است ، گاز درجای اولیه گفته می شود که دارای واحد (SCF) است .

5) گاز درجا (Gas In Place) به کل حجم گاز درون فضاهای خالی مخزن در شرایط استاندارد و در هر لحظه پس از تولید از آن مخزن ، گاز درجا گفته می شود که دارای واحد (SCF) است .

6) گاز باقی مانده درون مخزن (Remaining Gas In Place) به مقدار گاز باقی مانده درون مخزن پس از برداشت نهایی از آن مخزن ، گاز باقی مانده درون مخزن گفته می شود .

مقدار برداشت نفت و یا گاز از ابتدای شروع برداشت از یک مخزن تا یک 7) بازیافت (Recovery) بازیافت ؛ مقدار برداشت نفت و یا گاز از ابتدای شروع برداشت از یک مخزن تا یک تاریخ مشخص است . . .

8) فشار ترک مخزن (Abandonment Pressure) حداقل فشار لازم برای برداشت و تولید از یک مخزن هیدروکربوری است به طوری که در فشار های کمتر از آن ، برداشت از مخزن مقرون به صرفه نخواهد بود .

10) بخش قابل استحصال مخزن (Recoverable Part of Oil / Gas In Place) Water به حجمی از نفت یا گاز درون یک مخزن که قابل برداشت و استحصال باشد ، گفته می شود . . .

11) ذخیره اولیه (Initial Reserve) پیش از شروع برداشت از یک مخزن ، مقدار سیال ( نفت یا گاز ) پیش بینی شده برای تولید تا زمان ترک مخزن را ذخیره اولیه می نامند.

11) ذخیره باقی مانده (Remaining Reserve) مقدار سیالی که از زمان مشخص به بعد از شروع برداشت تا زمان ترک مخزن می توان برداشت کرد ، ذخیره باقی مانده نامیده می شود .

در تمامی تعاریف مطرح شده ، مکانیزم برداشت از مخزن به صورت جریان طبیعی است . . .