Planning and Scheduling a SIMPLIFIED Construction Project Construction Planning and Scheduling Planning and Scheduling a SIMPLIFIED Construction Project
Table of Contents Introduction Activities and description Plans Rendering Rough Logic Diagram Gantt Chart Pert Diagram Summary References
Introduction The purpose of this project is to show the various planning and scheduling techniques for the last few stages of a construction project.
Activities and Descriptions Cabinets RSMeans Code: 12 32 23.10 Description: Hardwood Casework Unit of Measure: 4 Hrs/LF Quantity: 20 Ft. Activity Durations: 2 Days
Activities and Descriptions Finish HVAC RSMeans Code: 23 09 33.10 Description: Electric Control System for HVAC Unit of Measure: 80 LF/Day Quantity: 100 lbs. Activity Durations: 2 Days
Activities and Descriptions Finish Electrical RSMeans Code: 26 05 90.10 Description: Hang lights, switch covers, etc. Unit of Measure: 2Hrs/Unit Quantity: 65 Units Activity Durations: 13 Hrs.
Activities and Descriptions Interior Finish Carpentry RSMeans Code: 06 22 13.45 Description: Installing crown moldings, windows, door trims, etc. Unit of Measure: .033Hrs/LF Quantity: 326 Ft. Activity Durations: 6 Days
Activities and Descriptions Finish Plumbing RSMeans Code: 22 41 16.30 Description: Set lavatories, sinks, drains, etc. Unit of Measure: 2.857Hrs/Unit Quantity: 2 Units Activity Durations: 6 Days
Activities and Descriptions Interior Paint RSMeans Code: 09 91 23.72 Description: Painting the interior of the home, walls and ceilings Unit of Measure: 0.05Hrs/Sq. Ft. Quantity: 2500 Sq. Ft. Activity Durations: 4 Days
Activities and Descriptions Flooring RSMeans Code: 09 68 10.10 Description: Hardwood and Carpet Unit of Measure: .006Hrs/SF Quantity: 740.16 Units Activity Durations: 2 Days
Activities and Descriptions Landscaping RSMeans Code: 32 93 33 10 Description: Planting, Sodding, Bedding, Shrubs, and Trees Unit of Measure: .004Hrs/Sy Quantity: 455Sy Activity Durations: 6 Days
Activities and Descriptions Punch List RSMeans Code: N/A Description: N/A Unit of Measure: N/A Quantity: N/A Activity Durations: N/A
Renderings Floor Plan
Right and Front Elevations Renderings Right and Front Elevations
Rear and Left Elevation Renderings Rear and Left Elevation
Renderings Foundation Plan
Renderings Roof Framing Plan
Renderings Electrical Plan
Renderings Plumbing Plan
Renderings HVAC Plan
Rough Logic Diagram
Rough Logic Diagram
Rough Logic Diagram
Rough Logic Diagram
Gantt Chart
Gantt Chart
Pert Diagram
Pert Diagram
Pert Diagram
Pert Diagram
Summary . Through this assignment, we have worked as a planner would have done. First, we have made a list of the activities thanks to the WBS and using the specifications, we have estimated the activities duration with the help of the quantities and the RS Means Productivity. Then, we have built the Gantt Chart, the PERT Diagram and the Rough Logic Diagram on SureTrack 3.0 Project Manager.
References Waier, Phillip R. (2009). RSMeans Construction Cost Data. 67th Annual Edition. Reed Construction Data, Inc. Pictures: Google