LSG Capabilities LSG nomenclature: WV - Work Volume AL - Air Lock

Slides:



Advertisements
Similar presentations
RavensNest 60 Channel Intelligent Video Solution The RavensNest is an enhanced video command and control platform that transforms any centralized analog.
Advertisements

Electrical wiring for piezo movers piezo power supply strain gauges readout temperature probes 1 Frédéric BOGARD – LAL/IN2P3/CNRS – Jan 25, 2013 Electrical.
Broadband Satellite Terminal (BST)
TM Revision 0.2 Hilmi Ortadeveci Custom Engineering January 31, 2000 MTD Project.
Veilux Fiber Optic Transceiver
Excel Environ Racks Simon Robinson. Ranges Sizes Features Environ v. formal surround; enclose.
SGI Confidential Copan 400 Installation. SGI Confidential Installation Overview The approximate minimum time to complete this procedure is.
3U ATCA Shelf October Proprietary and Confidential-
Trevor Thompson Senior Project II Vermont Technical College Spring 2011.
C2V2 Technical Requirements and Constraints
3/5/2007(c) 2007 UEI Inc.1 Design Review United Electronic Industries DNR-12 -3U 12 DNA Rack With CPU/NIC Enclosure.
Camera Electronics Systems September 2008 Rick Van Berg.
June 2008 R&D Center / BCS HW Team Introduction to iPECS P5 Hardware.
A* candidate for the power supply Wiener MPOD-LV crate w/ remote control only (except for local on/off switch) Type “EC LV” Front or rear connections (reverse.
System Elements HighPoint Broadband Delivery System Sector 1 Sector 3
DKTCOMEGA EDFA Product Line Jesper Broszka, Product Manager.
Training Purposes Only JEM FPEF OV JMU (Ver. 1.3) 1 JEM FPEF OV Fluid Physics Experiment Facility (FPEF) Overview Notice : This technical.
Maximizing ISS Utilization for Small Satellite Deployments and External Hardware/Sensor Testing Photo credit: NASA.
Embedded Sales Meeting COM Express Carrier. COM Express Carrier Card What is it? –Two PMC slot or two XMC slot on the top side of the board and one COM.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
Air / Sound Lock Iso-Booth Mix Tape EFX Step Up ~18” Raised floor in CR Glass GLASSGLASS Bulkhead Plate with inputs to board below glass EFX rack also.
Coming soon! hd-sct.com Coming soon Full specifications & application data for SCT HD camera support.
PHENIX UPGRADE Stony Brook Project Hadron Blind Detector Glove Box 31Aug05.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.1 Grid Box Design 1 GLAST Large Area Telescope:
CLM Maintenance. Covers : 1 - Side cover, 2 - Back cover, 3 Top cover, 4 - Lamp door, 5 - Side cover input and communication side, 6 - HEPA dust filter,
Launch Chameleon Plus P - More Preventive features and safety L - More Longer Lasting and robust U - More User friendly operation S - More Service friendly.
Invensys Controls Europe An Invensys Company EWCM 41x0 family New 32x74.
ATCA cooling tests Claudio Bortolin (PH-ADO) Damian Dyngosz (PH-DT) George Glonti (PH-UAT) Julian Maxim Mendez (PH-ESE) Lukasz Zwalinski (PH-DT) xTCA IG.
MSG Research Support Capabilities Lee Jordan MSG Project Manager MSFC FP10 (256)
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
ATCA COOLING PROJECT INTERSHIP FINAL PRESENTATION Piotr Koziol.
Multiple Module Vacuum Oven Productivity Enhancement System.
Microgravity Science Glovebox Video Overview. Course: MSG05 Version: May 2014 For Training Purposes Only Course Description  Detailed presentation of.
1 MINUS EIGHTY DEGREE LABORATORY FREEZER FOR ISS (MELFI) MSFC Briefing February 2005 John Cornwell
Inc 23/24 Integrated Team Review Intravenous Fluid Generation (IV Gen)
MSFC Payload Training bs/kh/ExpPldsTST#1/ 3/18/2016 Page 1 Astroculture-8 (ADVASC) TST #1 April 27, 1998 DTM/Beth Skidmore NASA/MSFC Training Branch Voice.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama TIR Overview Charts August.
Note: Glacier is launched unpowered and hardmounted in EXPRESS Rack 6 on Flight ULF2. For the following three weeks after activation or transfer, two 2-hour.
MSG Seal Replacement Mission Scenario Pre-Pack List (SOC OCR – ULF 1.1) MSG Front Window Exchange MSG Glove Rings & Feed- through Install MSG.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory EXPRESS Logisitics Carrier (ELC) Operations Overview POIWG #26, August.
September 2009 Intravenous Fluid Generation (IV Gen) EXPERIMENT OVERVIEW.
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Robonaut Live Video.
© 2014 Airbus Defence and Space – All rights reserved. The reproduction, distribution and utilization of this document as well as the communication of.
Frankie Jernigan/ Kathy Roeske FD36/Operations Development Group /
Introduction to IP Cameras Over Coax. Replacing Analog Cameras With IP Cameras Over Coax Analog Camera RG59U Coaxial Cable 18/2 Power Cable Low Voltage.
November 29, Frankie Jernigan MSG Integration Investigation Operations Lead EO
POIWG#38 ARTE - Thermal Exchange Presenter: Valerio Di Tana (Argotec)
PCs ENVIRONMENT and PERIPHERALS Lecture 4. An expansion cards: - An expansion card (expansion board) is an electronic circuit board that adds more functionality.
FLATPACK Rev.5 September 2002 Updated versions may be available.
National Aeronautics and Space Administration Microgravity Science Glovebox (MSG) Seal Exchange Overview February 2, 2006.
CPCG-HM Overview POIWG July 26, 2012 Brittney Macon 1.
CBSE Cold Stowage Hardware Overview William Crysel UAB/CBSE
Smart, web enabled fridge Marty Lewis. Basic I/O INPUTS Weight/size Sensor Barcode Reader Touch Pad / Touchscreen LCD OUTPUTS SVGA LCD INPUT AND OUTPUT.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Delta Training Strategy.
Delta’s Contribution for OCP Solution 2014
FlashBack-4 Development
NEW RMC Rack Multi Control.
Avaya VA Line-interactive UPS
Brooks Expert Support Tool (BEST) Software
Hardware, Installation & maintenance
I-Station Hardware, Installation & maintenance
ComCam Utilities Travis Lange Scott Newbry Camera I&T Mar. 6, 2017
Performance of an Automated Water Based Cooling System for CBM MuCh
SCT/Pixel Draft Rack Layout rcj
HDMI HDBaseT Extender with POH
AQT90 FLEX Service Training
High-Power GPU Rack: Hybrid Cooling
Door Heat Exchanger: Specification
TM-T88IV Epson Australia. TM-T88IV Epson Australia.
ATST Instrument Interface Overview
Presentation transcript:

LSG Capabilities LSG nomenclature: WV - Work Volume AL - Air Lock Capability LSG WV volume 450 L or 16 ft3 (660 mm high x 910 mm wide x 610 mm deep) Extendable/Retractable Main Door – 660 mm high x 660 mm wide Two levels of containment Negative pressure from airflow Physical barrier of structure General illumination 1000 lux @200mm above WV floor LSG Spotlight or MagLight (1000 lux at 140 mm spot dia) Filtration 3 HEPA/charcoal/catalyst filter stacks (Replaceable on orbit) WV Air flow 3000 l/m max (1200 l/m to 2250 l/m based on setting) 120Vdc for payloads None 28 Vdc for payloads 5 connectors on WV rear wall 110 Vac for payloads 1 connector on WV rear wall Payload attachment M6 threaded fasteners or Ferrous plates (To be decided) Max payload heat dissipation Less than 350W total (At max fan condition) Data handling connections ISS provided Z-Book 2 Ethernet, 1 RS422, 1 RS232, 1 2” USB Feedthrough Video Via cable to VUE drawer in EXPRESS rack (420 MB/s) 4 GigE inputs, 4 LSG provided cameras, 1 LSG feedthrough Airlock Optional, removable side-mounted 30 L (1.06 ft3) Allows items 180 mm x 410 mm x 410 mm to be transferred Vacuum Nitrogen Glove Ports 2 10” glove ports 2 8” glove ports 2 6” glove ports (1 in AAD) FDS Rack - Parameter Monitoring (Temp) WV – Parameter Monitoring (Temp) PFE Port – Avionics and WV LSG nomenclature: WV - Work Volume AL - Air Lock AB - Avionics Box CMP - Command & Monitoring Panel LUP- LSG Utility Panel ZSR - Zero-G Stowage Rack MTL - Moderate Temperature Loop SS - Secondary Structure VUE - Video Upgrade Equipment

LSG Flight Unit

LSG C&DH

LSG/MSG Payload Requirements   SSP 57000 Pressurized Payload SSP 52050 Software ICD Part 1, ISPR to ISS SSP 57211 MSG ICD MSFC-RQMT-2888 MSG-IIRD MSG-RIBRE-SPE-0001 MSG System Specification MSG-RIBRE-RP-0002 MSG Design Definition MSG-RIBRE-RQ-0001 MSG Payload Accommodation Handbook (PAH) Investigation ICD or UM Unique Verification Matrix SSP 57311 MSG SW ICD MSFC-RQMT-3098 MLC Requirements Doc MSG-ORIGIN-IC-0001, ICD MSG DHS SSP 57214 LSG ICD LSG-IDD-024 LSG Software Interface Definition Document LSG-SPEC-001 LSG System Specification   SSP 51700 Payload Safety Requirements for ISS