ATN99 International ConferencePage - 122-23 September 1999 London ATN99 INTERNATIONAL CONFERENCE 22-23 September 1999 London Paul Hennig, United Airlines.

Slides:



Advertisements
Similar presentations
ATN-2000 AOC Migration Strategy Presented by Frank OConnor.
Advertisements

GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
ICAO Seminar on the Implementation of Datalink and SATCOM Communications Bangkok, November 2003 Satellite AIRCOM Infrastructure Reinforcement.
FANS (Future Air Navigation System) Flight Crew Procedures
GLOBALink/HF Data Link
ACARS & VDL Mode AVICOM Japan
ICAO Seminar on the Implementation of Datalink and SATCOM Communications Bangkok, November 2003 VHF ACARS to ATN Akhil Sharma.
GLOBALink/VHF Digital Link Mode 2
NEXCOM by Bruce Eckstein FAA. NEXCOM The program to address NAS domestic A/G communications for voice and data The FAA established the NEXCOM Program.
© 2010 The MITRE Corporation. All rights reserved. AERONAUTICAL COMMUNICATIONS PANEL (ACP) SEVENTEENTH MEETING OF THE WORKING GROUP M Bangkok, Thailand.
A GLOBALink ARINC VDL Mode 2 AOA and ATN Program Status & Deployment Activities November, 2000 AMCPWGM1 WP23.
1 LINK European Organisation for the Safety of Air Navigation ICAO WG N Brussels July 3 rd -6 th Presented by Eurocontrol – Martin Adnams.
ATN2002 IEE, London Providing Communications Services to Support ATC Applications Akhil Sharma Senior Manager AIRCOM Service Development.
Rob Mead PETAL-II Trials Manager Eurocontrol, DIS/ATD
ACI/GM/3011/1.0 ACI's Portable ATN Software Products & Services Technology for next-generation aviation data communication… Presented by Forrest Colliver.
The Future of PETAL Technology
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
Page 1STNApresentation of data-link activities DATA-LINK IMPLEMENTATION IN FRANCE Initial data-link services with ACARS - Departure Clearance, ATIS - CPDLC.
VHF Digital Link Mode 2 Deployment Strategy Vic Nagowski
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
Workshop on preparations for ANConf/12 − ASBU methodology
Airport Collaborative Decision Making (A-CDM) Saulo Da Silva
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
Air-Ground Data Link - DFS Strategy
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
18-19 September 2001ATN2001 (London)1 A Commitment to ATN Implementing Aeronautical Data Link Today Presented by Kevin Wohlers ACI Program Manager.
24/25 September 2002ATN2002 (London)1 Delivering CNS/ATM Services to the Aircraft Presented by Forrest Colliver A discussion of the FANS/ATN accommodation.
24 Sept '02Page 1 FANS-1/A Accommodation in an ATN Environment.
Integrated information and telecommunications solutions AIRCOM Implementation VHF Digital Link Presented by Philip Clinch to ATN 2001 Conference 19 September.
ATN 2002 London September 2002 Presented by Aloke Roy Authors: Christophe Hamel Tom Judd Ketan Nguyen Bryan Rowe Kevin Wohlers ATN AIRBORNE IMPLEMENTATION.
FAA Controller Pilot Data Link Communications Program ATN ‘99 London, England James H. Williams September 22, 1999.
Data Link & CNS/ATM: A Business Perspective
The ATN Avionics Vendors View. ATN2001 Sept 2001; p.2 PETAL-II Avionics.
ATN/VDL Mode 2 Implementation Status
How the PETAL Trial Relates to the FAA’s CPLDC Program ATN 2001 Focus on the Reality of Data Link IEE London, England 18 September 2001 Gregg Anderson.
ATN Subnetwork Implementation:
ATN2001 Rev New Kent Fisher, Program Manager Boeing Air Traffic Management Kent Fisher, Program Manager Boeing Air Traffic Management.
ARINC PETAL IIe VDL Mode 2, ATN …and beyond
Next Generation Air/Ground Communications (NEXCOM) Presented to ATN 2002 London, England 25 September 2002 James H. Williams Communications Integrated.
Federal Aviation Administration – Oceanic & Offshore Program 1 Nancy Graham International Technical Representative - Europe, Africa and Middle East ATN2002.
20 FLIGHT OPERATIONS TECHNOLOGY Innovations in flight FANS-1/A involvement and future Captain Joe Burns Director – Flight Operations Technology.
Data Link Communications
FANS-1/A and ATN Data Link: An Avionics Perspective Bob Kerr
NORTH ATLANTIC ADS WAYPOINT REPORTING TRIALS. John Coulson NATS Infrastructure Services.
DCIT / Media Management Session FAA DataComm – OTA FANS Validation Airbus FANS comm media management 17 Nov 2011Airbus FANS comm media management Presented.
Presented by Philip Clinch on 27 September 2000 at ATN 2000 Aeronautical Telecommunications Services.
Page 1 FAA Future Air/Ground Communications System Architecture James Williams Integrated Product Team Lead Communications Systems ATN September.
Making VDL Mode 4 a Reality Bengt Moberg C.N.S. Systems AB ATN 2002 September 25th, 2002.
ATN2003 IEE, London CNS Infrastructure Partnerships Akhil Sharma Senior Manager AIRCOM Service Development.
FAA NextGen Data Comm Tower Service: CPDLC DCL New Operator Introduction.
Datalink & Polar Operations ATN 2003 London, September 2003 Presentation to.
Air Traffic Control Communication
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
GOLD GOLD Introduction Presented to: SOCM/2 Seminar
Presented by Thales Avionics ATN 2003 London, UK September 2003
AERONAUTICAL COMMUNICATIONS PANEL (ACP)   SEVENTEENTH MEETING OF THE WORKING GROUP M   Bangkok, Thailand 31 January – 1 February 2011 INFORMATION PAPER.
GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
ATN/VDL Mode 2 Implementation Status
FANS (Future Air Navigation System) Flight Crew Procedures
9/17/2018 Boeing ATN/IPS (Aeronautical Telecommunications Network/Internet Protocol Suite) Activities Title Option 1: Environment, Health & Safety Standard.
AIRCRAFT(ARINC) COMMUNICATION, ADDRESSING AND REPORTING SYSTEM
DATA LINK IMPLEMENTATION IN EUROPE
ATN Subnetwork Implementation:
An Airline Perspective
Presentation transcript:

ATN99 International ConferencePage September 1999 London ATN99 INTERNATIONAL CONFERENCE September 1999 London Paul Hennig, United Airlines

ATN99 International ConferencePage September 1999 London PRESENTATION OUTLINE United Airlines Datalink System, Present and Future Existing Capabilities, and Implementation Options Company Policy, Approach Philosophy and Aircraft Equipage Plans ATN Integration and Implementation with Legacy Host Systems

ATN99 International ConferencePage September 1999 London PRESENT AND FUTURE VDL Mode 2 Msg DSP ATN Network UAL ATN Router and GACS ASE SatData3 COMSAT Msg UAL Legacy Host ATN VM2/SD3 Aircraft DSP Gateway DSP Legacy System ACARS/AOA Aircraft Message Switching Over Land ACARS Environment VM2 Environment LEGEND Over Water

ATN99 International ConferencePage September 1999 London EXISTING CAPABILITIES Fleet Wide ACARS (about 600 aircraft) SATCOM on Oceanic 747,767 & and 777 FANS-1 Operational in Asia/Pacific Region Pre-Operational in North Atlantic Region PETAL II Participant

ATN99 International ConferencePage September 1999 London IMPLEMENTATION OPTIONS Fleet Wide Implementation of ATN and VM2/SD3 for AOC & ATC Applications Possible Implementation Phases: ACARS (VMA, SD2, HF/DLS) VM2/AOA ATN for AOC with Ground System Upgrade CM/CPDLC ADS and FIS/ATIS Other Bit Oriented Applications TBD

ATN99 International ConferencePage September 1999 London ATN & VM2 ENDORSEMENT United Airlines strongly supports the migration of Aeronautical Operational Control (AOC) from current ACARS directly to the ATN over VM2/SD3. This position is supported independently from our endorsement of ATN for Controller Pilot Data Link Communications (CPDLC). When United Airlines makes an investment decision for company data link operations, our decision will be to invest in ATN and VM2/SD3 avionics - Any interim step, such as ACARS over AVLC (AOA), will only be considered when ATN pricing and/or scheduling information is not available at the time of that decision.

ATN99 International ConferencePage September 1999 London APPROACH PHILOSOPHY UAL Cross Functional Datalink Team Led by Flight Operations (User Requirements) Avionics Engineering Dispatch and System Operations Control Finance Division Information Services (IS) Division Flight Standards, Procedures and Training

ATN99 International ConferencePage September 1999 London AIRBUS PROGRAM Program for 52 New A319 and A320 Aircraft with Deliveries from November 1999 through November 2001 ATSU Starting November 1999 DCDU Upgrade Starting June 2000 VM2/AOA Upgrade Starting June 2001

ATN99 International ConferencePage September 1999 London FOLLOW ON STEPS Pursue VM2/AOA Option on New 777 Aircraft Deliveries based on Boeing Offer expected September B777 New Aircraft Deliveries Implement ATN Router w/Comm Code, and GACS End-System as Gateway to United Airlines Legacy Host Systems GACS Validation Program Flight Plan Filing and Receipt of NOTAMs Collaborative Decision Making (CDM)

ATN99 International ConferencePage September 1999 London UAL ROUTER/GACS DETAIL GACS/AOC Gateway Comm Router PPHGate Channel Port code from supplier and test (3 man-months) Documentation (8 man-months) Develop code and unit/integrated test (8 man-months) United Airlines Legacy Host System

ATN99 International ConferencePage September 1999 London UAL PROGRAM OBJECTIVES Develop Multi-Phased Implementation Program for Full Air & Ground Datalink Capability (i.e., ATN & VM2/SD3 for AOC & ATC) on all Glass Aircraft Follow Schedule and Justification Guidelines in C/AFT Report (where applicable) Accomplish before Advent of Critical ACARS Saturation, and Major Airport/Hub Congestion Projections Assure Fair Share Investments by All

ATN99 International ConferencePage September 1999 London QUESTIONS?