Www.SaveKapiti.co.nz Sandhills Expressway Four to six lane motorway Crossover or Interchange June 2010.

Slides:



Advertisements
Similar presentations
The Millau Viaduct Paris - Barcelona.
Advertisements

March 1, Why an interchange at this location? TH 15 Corridor Study 2007 Nine Signalized intersections Six in Top 50 High Crash Cost Study outcome.
Grade Separation Alternative
Delmar Boulevard bridge replacement over Interstate 170.
Go to for the facts 1 Two lane WLR $120m Four lane Expressway $500m.
NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT Environmental Impact Statement and Preliminary Engineering Public Scoping Meeting Tuesday, November 15, 2011,
 Provide a safe crossing and maintain mobility › The bridge is identified as structurally deficient.  Meet regional traffic demands and improve mobility.
Route 29 Western Bypass: Background and Timeline May 13, 2014 John Lynch, P.E. Culpeper District Administrator.
A86 Project 2 33 year-old private motorway concessionaire company (financing, construction, operation) $800 million (U.S.) per year revenue 550 mile network.
Learning Targets “I Can…” -Define “ecological footprint.” -Determine your ecological footprint based on your current lifestyle. -Explore options to reduce.
TYPES OF INTERSECTIONS OF ROAD AND DESIGN PARAMETERS OF INTERSECTION
Module 5 Displaced Left Turn (DLT) Intersections
The Millau viaduct is part of the new E11 expressway connecting Paris and Barcelona and features the highest bridge piers ever constructed. The tallest.
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
Route 109 Bridge Reconstruction at Wood Road The Missouri Department of Transportation.
 Life in communities has changed over the years.  One of those changes is in transportation. Transportation is a way of moving people or things from.
Chapter 2 Signs, Signals, and Roadway Markings
STH 29 and CTH O Construction Project Manager: Richard Simon Project Leader: Dave Julson.
NEW GOVERNMENT CENTER WEST DEVELOPMENT OPTIONS January 14, 2015.
Chapter 10. Rural Driving What is the difference between posted speeds and safe speeds? Posted are the maximum allowed under ideal conditions, while safe.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Highway Location Study CE 453 Lecture 4 See also lab 2 and lab 4 instructions, and EIS lecture notes See also 04 DOT development process.doc Refs:
Go to for the facts 1 No way Expressway.
Proportions Round One 2) x + 3 = 15 Answers 2.) x + 3 = 15 X=12 21.
Highway Location I. * Principles of Highway Location 1. allowing convenient, continuous, free-flowing traffic operation, and 2. best meeting the major.
Board of County Commissioners September 25, 2012.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
1 Napa River/Napa Creek Flood Protection Project and Consolidated Remedial Action Area Consolidated Remedial Action Area SF Bay Downtown Napa Hwy 29 Bridge.
Public Hearing PROPOSED HIGHWAY IMPROVEMENTS I-95 DEFENSE ACCESS ROADS RAMPS TO THE ENGINEER PROVING GROUND Fort Belvoir, Virginia AUGUST 20, 2008.
Ambulance Operations. Emergency Vehicle Laws The driver of an authorized emergency vehicle may: Park or stand irrespective of the provisions of this chapter;
Revisions to Chapter 2D – Guide Signs for Conventional Roads.
Virginia Department of Education
Benjamin Davis Michael Kazalis.  Streams and Road Intersections  Soil Drainage Class  Land Cover  Predicated Precipitation Change  Flood Zones 
AND TRAFFIC SETTINGS ENVIRONMENTS. RESIDENTIAL STREETS FACTORS???? DRIVING PATTERNS SPEED PEDESTRIANS PARKED CARS TRAFFIC LAWS.
Traffic Signs Warning Signs Construction Signs. Warning Signs Warning Signs tell you what to expect on or near the road. They warn you about possible.
Stormwater control and management road map to 2055 Sustainable Development and Natural Resources.
Context Sensitive Solutions Focus Group Session Lynn Purnell Parsons Brinckerhoff Prosperity Church Road Corridor December 8, 2005.
FETTUCCINI BRIDGE PROJECT Directions for building a bridge.
Review The point of case studies. Case Study 4 The case of the flooded basements.
Unit 4 Public transport. Word power Do you know what we call these roads in English? lane / path.
Test Site Spirio Rd Left Turn #1 Scored Right Turn #1 Scored Right Turn #2 Scored Right Turn #3 at Stop Light, Scored.
Brookeville Bypass Final Design Presentation Initech May 6, 2004.
Physical Properties of Matter Grade 7.
Physical Properties of Matter Grade 7. 
ΜΕΤΑΣΥΛΛΕΚΤΙΚΗ ΦΥΣΙΟΛΟΓΙΑ ΕΡΓΑΣΤΗΡΙΟ 3. Μετασυλλεκτική Εργ3-Λιοσάτου Γ.2 ΒΙΟΛΟΓΙΚΟΙ ΠΑΡΑΓΟΝΤΕΣ ΠΟΥ ΕΠΗΡΕΑΖΟΥΝ ΤΗ ΦΘΟΡΑ ΤΩΝ ΟΠΩΡΟΚΗΠΕΥΤΙΚΩΝ Αναπνοή Η λειτουργία.
Fig. 6-CO, p p. 185a p. 185b p. 185c p. 185d.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Know When you need a pool repair?
Fordham at Columbia as a Grade-Separated Intersection
Highway 169 Bridge Replacement & Pavement Resurfacing
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Road-Stream Interface:
Double Crossover Diamond Interchange
CONSTRUCTION TECHNOLOGY & maintenance
اثرات گرمايش جهاني تغييرات آب و هوا، تأثيرات عميق و شديدي بر بسياري از عوامل اساسي موثر بر سلامت از جمله : آب، غذا، هوا و محيط زيست دارد كه اين مورد خود.
ARTERIAL INTERCHANGE Four exit ramp, split level (SPUI)
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Kapiti Coast District Council
Is it possible to plan a route which crosses each one of the seven bridges of Köningsberg once and only once?
This is a prototype of a road that will be built in survival world
Fig. 6-CO, p. 211.
07CO, p. 190.
Design Standards.
Chapter 5 Select Figures from MN MUTCD
The Millau Viaduct Paris - Barcelona.
Fordham at Columbia as a Grade-Separated Intersection
Dzidzernavank Village Map & PSD Site
Are You Ready for This. .. The future of NC-191.
The Millau Viaduct Paris - Barcelona.
Presentation transcript:

Sandhills Expressway Four to six lane motorway Crossover or Interchange June 2010

Cross-over or Interchange Ground level round-about (at grade) – Like Otaki -> Not an option – Open interchange –> high number of affected properties Underpass (tunnel) – Expressway at ground level – Local Road underpass – Not an option –> water table (eg Wiamea stream) Bridge - Crossover or Interchange ? – Local Road over Expressway – Expressway over Local Road

TWO lane WLR built in stages Bridge over the Waikanae Ground level interchanges

Four lane Sandhills Expressway Bridge over the Waikanae Bridge - Crossover

Local Road - now

Crossover - Alternatives Crossover No access Interchange Minimal Footprint At grade Interchange Local Road over Expressway

Local Road – Crossover Local Road over Expressway Expressway Local Road 14 m 9 m 8 m 5 m 0 m

Local Road – Crossover Local Road over Expressway Expressway Local Road

Local Road – Crossover 5`+ meters of bunding Local Road over Expressway 8 meters at crossover Expressway Local Road

Expressway – Crossover Expressway over Local Road 14 m 9 m 8 m 5 m 0 m

Expressway – Crossover Expressway over Local Road 14 m 9 m 8 m 5 m 0 m Expressway Local Road

Local Road – Intersection Expressway Local Road Expressway over Local Road

Expressway – Intersection Expressway over Local Road

Construction noise and pollution Seven years of blight

The wetlands A lifestyle change for the worse

Big box development A future of construction noise and disruption

HELP ! Save Kapiti Sign the petition