The EPPI Leadership-Core-Support Areas of Performance Framework

Slides:



Advertisements
Similar presentations
What is an M and E Plan?. Organizing the Work of M and E An M and E System -- the 12 components as a whole – Sets out broad vision at national level An.
Advertisements

Project Purpose and Background
Plateau Competency Management and Assessment Overview v 5.8.
Strategy 2022: A Holistic View Tony Hayes International President ISACA © 2012, ISACA. All rights reserved.
Transportation leadership you can trust. presented to NCHRP Project Panel presented by Cambridge Systematics, Inc. with PB Consult Inc. Texas Transportation.
Vocabulary’s CODE. The next core six strategy discussed in The Core Six: Essential Strategies for Achieving Excellence with the Common Core is……. ……..
Strategic, Annual Performance & Operational Planning Process
Engineering, Operations & Technology | Information TechnologyAPEX | 1 Copyright © 2009 Boeing. All rights reserved. Architecture Concept UG D- DOC UG D-
1 Capacity Building: Strategy and Action Plan GEF-UNDP Strategic Partnership Capacity Development Initiative.
1 ©Copyright Dr G Sieff | IC Growth Group | | ph Strategy Mastery Programmes October 2012.
This series of five presentations has the following goals: Presentation III A Discussion with School Boards: Raising the Graduation Rate, High School Improvement,
Creating a Powerful Development Model for the U.S. Government The German Marshall Fund of the United States June 2010.
Communication System Coherent Instructional Program Academic Behavior Support System Strategic FocusBuilding Capacity.
Firm Resources and Sustained Competitive Advantage
Ready to Raise PowerPoint Resource The Work of Early Years Community Developers Please feel free to adapt these PowerPoint slides to your needs. Credit.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
Data Analysis Processes: Cause and Effect Linking Data Analysis Processes to Teacher Evaluation Name of School.
Economic, Social and Environmental Benefits Better Planning and Operational Decisions in Water Management Decision Making Capacity and Institutions; Stakeholder.
Kathy Corbiere Service Delivery and Performance Commission
School Improvement Partnership Programme: From principles to practice Chris Chapman.
Advisory Team for Large Applications Viability and delivery: Applying good practice.
STRATEGIC IMPLEMENTATION Requirements for Strategic Implementation 20/02/1438 Strategic Management Prof. Dr. Majed El-Farra
Michael J. Novak ASQ Section 0511 Meeting, February 8, 2017
DH STANTON ELEMENTARY.
Service Management World Class Operations - Impact Workshop.
Theme: Air Pollution and Health (Working Group Report)
Select an EA Tool Based on Business and User Need
Management Areas of Performance
Analysis for EPPI Enterprise Process Performance Improvementsm
Enterprise Process Performance Improvement
ASTD Charlotte - Day of Learning – December Guy W
Our Knowledge Management System Performance Competence Requirements
Executive Leadership Series
Organizing Instructional & Informational Content
Modeling Mastery Performance and Systematically Deriving the Enablers
The 7 Steps of Lesson Mapping
PM 582 RANK Education Your Life / pm582rank.com
PM 582 RANK Lessons in Excellence-- pm582rank.com.
PM 582 RANK Education for Service-- pm582rank.com.
MICRO TRAINING SERIES - for T&D Professionals
Guy W. Wallace Pursuing Performance EPPIC Inc.
Developing L&D Content for Performance Impact
From Macro to Micro and Back
All Learning Started As Informal
National Board Certified Teacher Mentor Training
National Board Certified Teacher Mentor Training
Jean Scott & Logan Searcy July 22, MEGA
The Performance Ecosystem Requirements
Developing a Community Leadership Corps:
Performance Analysis for Improvement
What it does OS Step Leads to Focus PRE-PLANNING VISION SCOPE TARGETS
Linking Strategic Planning and Budgeting
Worry About Your Invalid Practices
The PACT Processes for ISD – Phase By Phase Review
All Learning Started As Informal
Sometimes the Root Cause -- Isn’t a K/S Issue At All
Automating Profitable Growth™
Best ISD Practice: Benchmark Your Master Performers
A 5-Day PACT Analysis & Design Workshop
Implementing Budget Reforms
Mandatory T&D Highly Recommended T&D Elective T&D
The Many Instructional Roles Before & After the ID Role
My Performance Improvement Methods: EPPI
Quarterly Newsletter From 20 Years Ago
Our Knowledge Management System Performance Competence Requirements
Organizational Vitality
Consulting – SubContracting – Freelancing
KEY INITIATIVE Financial Data and Analytics
KEY INITIATIVE Financial Data and Analytics
Information Governance
Presentation transcript:

The EPPI Leadership-Core-Support Areas of Performance Framework Process Design/ re-design S2 Human Assets Management S3 Environmental Assets Management S4 Special Assignments L4 Results Measurement Planning & Management L1 Stakeholder Relationship Management/ System Governance L2 Strategic Planning & Management L3 Operations Planning & Management L5 Process Improvement Planning & Management C1 Planning Work of ICs and self C2 Assigning C3 Monitoring C4 Troubleshooting L6 Communications Planning & Management IC1 AoP A AoP B AoP C AoP D Individual Contributor/Team AoPs Management AoPs ©2007/2017 EPPIC Inc. and Guy W. Wallace Performance Improvement- Beyond Instruction When Looking Beyond Individual Performance and the Enablers and the Gaps Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Leadership - Areas of Performance The EPPI Leadership-Core-Support Areas of Performance Framework Leadership - Areas of Performance L1 Stakeholder Relationship Management/ System Governance Being in sync with all of your Stakeholders and driving your Organization by their Requirements L2 Strategic Planning & Management Being in sync with all of your Stakeholders’ Strategic Plans and reflecting all of that in your Strategic Plans L3 Operations Planning & Management Being in sync with your own Strategic Plan as reflected by your Operations Plans and Budgets Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Leadership - Areas of Performance The EPPI Leadership-Core-Support Areas of Performance Framework Leadership - Areas of Performance L4 Results Measurement Planning & Management Having your Targeted Results Metrics/ Measurements in sync with all of your Strategic and Operational Plans L5 Process Improvement Planning & Management Addressing priority shortcomings in your Measured Results L6 Communications Planning & Management Communicating to all Stakeholders effectively Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Core - Areas of Performance The EPPI Leadership-Core-Support Areas of Performance Framework Core - Areas of Performance C1 Planning Work of ICs and self Planning Work – of the Organization’s owned Processes and those Processes owned by others that the Organization Supports C2 Assigning Work of ICs and self Assigning Work – of the Organization’s owned Processes and those Processes owned by others that the Organization Supports IC1 AoP A AoP B AoP C AoP D Supported Processes Owned Processes What Work? Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Core - Areas of Performance The EPPI Leadership-Core-Support Areas of Performance Framework Core - Areas of Performance C3 Monitoring Work of ICs and self Monitoring Work – of the Organization’s owned Processes and those Processes owned by others that the Organization Supports C4 Troubleshooting Work of ICs and self Trouble Shooting Work – of the Organization’s owned Processes and those Processes owned by others that the Organization Supports IC1 AoP A AoP B AoP C AoP D Supported Processes Owned Processes What Work? Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Support - Areas of Performance The EPPI Leadership-Core-Support Areas of Performance Framework Support - Areas of Performance S1 Process Design/ re-design Designing new or Redesigning existing Processes that the Organization owns S2 Human Assets Management Addressing the needs of specific Human Assets’ capabilities and capacity to support the owned Processes and those Processes owned by others Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Support - Areas of Performance The EPPI Leadership-Core-Support Areas of Performance Framework Support - Areas of Performance S3 Environmental Assets Management Addressing the needs of specific Environmental Assets’ capabilities and capacity to support the owned Processes and those Processes owned by others S4 Special Assignments Supporting all Special Assignments as requested Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

The EPPI Leadership-Core-Support Areas of Performance Framework Core AoPs include managing or supporting those Processes that are Owned by the Organization or Supported by the Organization Individual Contributor/Team AoPs Planning – Assigning – Monitoring – Troubleshooting Work A Process Workstream A Process Workstream A Process Workstream A Process Workstream A Process Workstream IC1 AoP A IC1 AoP B IC1 AoP C IC1 AoP D A Process Workstream Owned Processes Supported Processes ©2007/2017 EPPIC Inc. and Guy W. Wallace Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Systematically Deriving the Enablers of Process Performance The EPPI Leadership-Core-Support Areas of Performance Framework Systematically Deriving the Enablers of Process Performance Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

Systematically Deriving the Enablers of Process Performance The EPPI Leadership-Core-Support Areas of Performance Framework Systematically Deriving the Enablers of Process Performance Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

The EPPI Leadership-Core-Support Areas of Performance Framework Example of HA Enablers Capture Format via Systematic Derivation AoP Link Identifies the segment of the job where the attribute or value enables performance A/V Item discrete value item Extent The level of organizational effort required to institute the attribute or value Volatility Ranks how often and significantly the attribute or value will change Difficulty Ranks how difficult it is to accommodate Criticality Ranks the relationship between having value and mastery Select/ Accommodate Denotes whether the item is a selection criteria/condition or will be accommodated by organization G F E D C B A H/M/L S/A Link to Area of Performance Attribute/Value Category: <Company/Client Name> <Audience> Attribute/Value A = B = = Criticality/Difficulty/Volatility/Extent H High M Medium L Low Codes: Form Design ©2002 EPPIC, Inc. Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

The EPPI Leadership-Core-Support Areas of Performance Framework Example of EA Enablers Capture Format via Systematic Derivation Difficulty Ranks how difficult the data or information item is to use AoP Link Identifies the segment of the job where the data or information enables performance D/I Item discrete data item Extent The level of organizational effort required to install/create information item Volatility Ranks how often and significantly information will change Criticality Ranks the relationship between having information and mastery Present/Address Denotes whether supports performance 100 percent as is or must be addressed G F E D C B A H/M/L Present/ Address P/A Link to Area of Performance Data/Information Category: <Company/Client Name> <Audience> Data/Information Matrix A = B = = Criticality/Difficulty/Volatility/Extent H High M Medium L Low Codes: Form Design ©2002 EPPIC, Inc. Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz

The EPPI Leadership-Core-Support Areas of Performance Framework Guy W. Wallace Pursuing Performance EPPIC Inc. www.eppic.biz