CIFE welcome.

Slides:



Advertisements
Similar presentations
© 2012 IBM Corporation Smarter Cities Big Data – Media Hype of Industry Game Changer? Ed Bryan, Vice President, Industry Solutions IBM Software Group July.
Advertisements

Virtual Design and Construction Case Study Martin Fischer Cristina Garcia Calvin Kam John Kunz Kathleen Liston Marcus Schreyer Vibha Singhal.
Your Career Starts Here! APPLY ONLINE: campus.canadiantire.ca SUMMER 2009 CO-OP OPPORTUNITY COMPANY SUMMARY: Recently ranked as one of Canada’s 10 Most.
Multi-objective building envelope optimization for life-cycle cost and global warming potential ECPPM 2012Forest Flager, John Basbagill, Michael Lepech,
STEPPING STONE PROJECT STEPPING STONE PROJECT designing a new engineering discipline presented by team 1.
Discover how to improve productivity by going DevOps and SAFe.
Certified Business Process Professional (CBPP®)
 For the implementation of the EPBD and the targets optimal design strategy is needed for energy efficient buildings by applying an integrated.
Industry Mentors News A/E/C Projects Research Projects Industry Projects Contact Home Staff Faculty Mentors PEOPLE Industry Universities Gov. Agencies.
Strategic Integration and Automation of Conceptual Design Haymaker, Law, Gane, Flager, Shkolnik April 26, 2007 CIFE Research Proposal ArchitectureEngineeringComputer.
In today’s society we find, an ever-increasing global population that continues to shift to urban areas will require widespread adoption of sustainability.
CEFPI is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion of this.
IBM Academic Initiative Skills for a Smarter Planet Cloud Computing John Schilt Lead, IBM Academic Initiative Australia / New Zealand
Copyright  2013 Using MDO to Support Sequential Design Decisions CIFE TAC Using MDO to Support Sequential Design Decisions Michael Lepech (PI)
Promoting Research in a College of Architecture Steven P. French, Ph.D., FAICP Dean and Professor College of Architecture Georgia Institute of Technology.
Benjamin Welle Stanford University Grant Soremekun Phoenix Integration
WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Presentation for Panelized Systems UCSF Medical Center at Mission.
Glen Fields - Final Project Presentation. What Sets CSI Apart... GBA 573 Consultants Company Background Located in San Diego, CA 5 Engineering Consultants.
Copyright  2009 Improving MDO in AEC CIFE TAC 2009 Improving Multidisciplinary Optimizaton Methods in AEC 1 Principal Investigators John Haymaker, Assistant.
Marv Adams Chief Information Officer November 29, 2001.
To lead or to follow… innovation & collaboration in manufacturing Stuart Thomson CEO – Rail Manufacturing CRC
Theories of Agile, Fails of Security Daniel Liber CyberArk.
© 2006 Bentley Systems, Inc. Bentley Building Solutions multidisciplinary, integrated design and analysis.
I © 2015 Bentley Systems, Incorporated Andrew Smith, Feb 2016 How BIM can positively influence rail O&M.
Design Visualization Visualize building early in the process to support and accelerate the decision making process. Schedule Visualization Visualize construction.
Offshore Europe September 8-11, 2015 ABS Group Offshore Drilling.
Talent Acquisition, Staffing, Recruitment, Executive Search.
Preparing Mechanical Engineering Students for Collaborations Across Distance and Disciplines (CADD) Nina Robson California State University, Fullerton.
1 TSWG Cloud Update Harry House October 21, 2014.
Introduction to Project Management Project management.
Successfully Implementing Your Student Success Plans
Society for Maintenance and Reliability Professionals (SMRP)
A Productive Partnership
Continuous Improvement Project (A Guideline For Sponsors)
4D Simulation Impacts on Construction Management
Fort Stanwix National Monument Energy Audit Contract
Penn State Center for e-Design Site Vision and Capabilities
DESIGN TOOLS UPDATE.
2017/18 SIP Request Process September 2016.
Mechanical & Manufacturing Engineering Program
GOVERNANCE COUNCILS AND HARTNELL’S GOVERNANCE MODEL
Beck Technology Innovation in all Dimensions.
Efficacity R&D institute for urban energy transition May 2017.
CIFE welcome.
Владимир Гусаров Директор R&D, Dell Visual Studio ALM MVP ALM Ranger
Systems Analysis – ITEC 3155 Evaluating Alternatives for Requirements, Environment, and Implementation.
DEPARTMENT OF MINERAL RESOURCES
The origins, status and promise of Virtual Design and Construction
Achieving Operational Excellence and Customer Intimacy:Enterprise Applications Chapter 9 (10E)
Army Engineer Association Engineering & Energy Track 16 June 2015
Critical Factors in Managing Technology
MEP CoordinationMEP Coordination and Clash Detection is Extremely Significant for BIM-Know Why.
© LEAN CONSTRUCTION INSTITUTE
Cañada College Sustainability Plan Past… Process/Structure…Goals..
EB74: Market and Policy Developments
Scenario Project „Yamal Oil and Gas 2040“
By Jeff Burklo, Director
CIFE welcome.
ASSESS Initiative Update
Your Facility Your Information
National Institute of Building Technology is the first institute that creates awareness comprehensively in the field of construction and project management.
WIS Strategy – WIS 2.0 Submitted by: Matteo Dell’Acqua(CBS) (Doc 5b)
Systems Engineering for Mission-Driven Modeling
Best Practices Consortium
Adoption of Building Information Modeling Top Benefits of BIM data for Facilities Managers.
Dominant Improvements of BIM Modeling Services and Building Information Modeling Firms BIM Modeling Services Building Information Modeling Firms.
Founded in 1920, the Society of American Military Engineers leads collaborative efforts to identify and resolve national security infrastructure-related.
What will engineering design practice be like in 2040
Presentation transcript:

CIFE welcome

CIFE Overview 100% funded by industry 1988-2000 2000-2010 2010+ Building owners Design and construction companies Software and hardware vendors 1988-2000 Building Information Modeling (BIM) 2000-2010 Virtual Design and Construction (VDC) – project focus 2010+ Optimize Facility Performance Enterprise focus 2

Current success stories: Reports from 2012 CIFE Summer Program Designers/engineers: 30% reduction in project schedule (GPLA) 33% cost reduction (Sera) 328x increase in number of design versions (Arup) 99.99% reduction in design cycle time (Beck) Design-Builders: 48% reduction in man hours (Beck) 30% reduction in cost (NCC) >99% reduction in design batch size (GT) 85% reduction in effort to track supply chains (Optima)  Builders: 95% reduction in field rework (DPR) 20% improvement in field productivity (DPR) 0% reduction in scope (DPR)

Professional VDC Certificate CIFE Current success Evidence-based management: metrics on organization and process performance Multidisciplinary design optimization (MDO): Automated rapid generation of (thousands of) design alternatives “Big data” Professional VDC Certificate Program

Plus-Delta of Civil Engineering Provides fixed physical assets and wealth High global demand for infrastructure and housing Opportunity to impact global climate challenge significantly Low productivity  compete with other ways to spend $ High energy use and rising energy costs Structural reliability << societal need (Chile) US Department of Commerce, compiled by P. Teicholz Persson, Sustainable City of Tomorrow: B01—Experiences of a Swedish Housing exposition Guilllermo Gomez, PUChile

The CIFE mission to be the world's premier academic research center for Virtual Design and Construction of Architecture - Engineering - Construction (AEC) industry projects. Virtual Design and Construction (VDC) is the use of multi-disciplinary performance models of design-construction projects, including the Product (i.e., facilities), Organization of the design - construction - operation team and Work Processes in order to support business objectives … … to support exceptionally reliable engineering and management processes to plan, design, construct and operate sustainable facilities

CIFE methods Entirely industry-funded Needs to simultaneously serve diverse constituents: (Industrial) sponsors (Academic) stakeholders: dean, faculty Students CIFE has a 25 year history Practice Research Education

Summary of CIFE role CIFE translational research gives practitioners the opportunity to identify, explore, develop and apply new methods that have great potential value … with low risk and (relatively) low cost Practice Research Education

4D+: 4D with analytics Enables: Multi-disciplinary teams to visualize construction of large (or small) projects and View multi-disciplinary predictions of value and costs Over time

Current success story: Multi-disciplinary design Optimization for AEC Flager: MDO Current success story: Multi-disciplinary design Optimization for AEC

Cloud-based multi-disciplinary design optimization Basbagill, Flager: MDO Cloud-based multi-disciplinary design optimization

Morkos: Space Constraint MDO Method Current success story: Schedule by exploring many “or” schedule options SCM schedule durations average 47% shorter than LOB

Big data example: data can be readily available; making sense can be hard Multi-Purpose Room Supply Air Temp., Cooling Coil Valve Position vs. OAT Multi-Purpose Room Supply Air Temp., Cooling Coil Valve Position vs. Time Constant value agrees with Building EQ pattern… but no data in warm weather Cooling coil and supply air temperature work together as expected (11/212009 from 7:15 PM to 8:15 PM) Cooling coil valve position open during cold weather Cooling coil valve position positively correlates with OAT Basbagill, Russell-Smith, Wise

VDC Certificate Program Big ideas: The VDC certificate program is the single most effective CIFE initiative in helping member organizations to get high value from adoption of VDC methods. It provides professional education to enable participants to: Understand basic theory and practice of VDC; Develop awareness of trends, potential results and issues in using VDC; Develop specific skills in collaborative use of VDC methods. Photo courtesy DPR

Good practice uses multiple VDC methods: DPR Process Metrics Target Costing Stuart Project Setup Need to go further than just the conceptual definition of an “integrated process” Need tangible references of a completely redefined process Prequalification process Define project organization Define deliverables by discipline Process to create a virtual organization Commitment from all parties to virtual organization Recognition that SD, DD, CD and CA are redefined Owner’s commitment from the very top Design Assist Process Virtual Building Tools Design the “Big Room” Virtual Company Big Room Collaborative Planning