Jaret Matthews AAE 450 Team A

Slides:



Advertisements
Similar presentations
Intro to Risk Management One Morning Session: Friday, April 22, 2005, 8:30am – 12:30pm SAIC, Science Drive, Orlando, Florida Registration/Sign-In.
Advertisements

HRA INCOSE Chapter February 2008 Meeting: Presentation: Using Fault Trees for System Safety and Risk Management Applications Presented by: Melissa Jones,
Emergency Medical Response You Are the Emergency Medical Responder You are an EMR and a member of a rural volunteer rescue squad. There has been a motor-vehicle.
Rapid Action Team Summary Report
NHTSA Research update EVS-GTR National Highway Traffic Safety Administration April 16-18, /15/2013 EVS
Response Operations During and After a Space Weather Event Response Operations During and After a Space Weather Event 3 March 2011.
Mission Success Starts with Safety The Similarities and Differences of Reliability Engineering and Probabilistic Risk Assessment RAMS VII Workshop November.
Project Management Gaafar 2007 / 1 This Presentation is uses information from PMBOK Guide 2000 Project Management Risk Management* Dr. Lotfi Gaafar.
Daylight Savings Time Transition Planning. The Daylight Savings Operational Risks Affect on transaction cash flow? Affect on service delivery? Affect.
TRANSGENIC TECHNOLOGY:ETHICS AND CONTROVERSY Using transgenic technology issues to develop critical thinking skills in the classroom.
Risk Management in the USCG Auxiliary. 2 Participant Objectives At the end of this program, you will be able to:  Identify the baseline of operational.
Why need probabilistic approach? Rain probability How does that affect our behaviour? ?
Adapted Physical Education 6 Service Delivery Options Available in Physical Education and the Role of the Adapted Physical Education Specialist.
Solar Cell Applications
Annex I: Methods & Tools prepared by some members of the ICH Q9 EWG for example only; not an official policy/guidance July 2006, slide 1 ICH Q9 QUALITY.
Challenges Faced in Developing Audit Plans and Programs 21 st March, 2013.
© 2014 The Aerospace Corporation Responsive Environmental Assessment, Commercial Hosting Demonstration (REACH) Theme #3 Contribution: Particle Precipitation.
CREATING GOALS AND OBJECTIVES. Goals Goals are broad statements of what the students will be able to do when they have completed the lesson Goals can.
Power Outages and Emergency Communications November 13, 2012.
Real World Applications of USGS EQ Science: Stacy Bartoletti Degenkolb Engineers Structural Engineers Association of Washington Cascadia Region Earthquake.
Bits and Pieces. Spacecraft Systems Propulsion –Already discussed Communications Science instruments Power.
Alternative Energy Cell Phone Charger Team #6: Jack Boylan Jake Kapoosuzian Rahul George Pennsylvania State University EDSGN 100.
Emergency Medical Response You Are the Emergency Medical Responder You are an EMR and a member of a rural volunteer rescue squad. There has been a motor-vehicle.
N O T E “CLICK” TO CONTINUE… If the slide show is not launched, click on View  Slide Show in the menu bar at the top of the Power Point window. When the.
RELATIONSHIPS OF RELIABILITY, AVAILABILITY & MAINTAINABILITY (RAM) TO OPERATIONAL READINESS & SUPPORTABILITY Bernard Price Certified Professional Logistician.
GE 116 Lecture 1 ENGR. MARVIN JAY T. SERRANO Lecturer.
MANAGING PROJECTS WITH GLOBALLY DIVERSE PROJECT TEAMS FRANK GORMAN CS MAG Professional Awards MAG PMI Leadership Institute Graduate Past Chair PMI-DVC.
3P OR NOT TO 3P, THAT IS THE QUESTION. CRM CASE STUDY.
ME 4054W: Design Projects RISK MANAGEMENT. 2 Lecture Topics What is risk? Types of risk Risk assessment and management techniques.
Center for Reliability Engineering Integrating Software into PRA B. Li, M. Li, A. Sinha, Y. Wei, C. Smidts Presented by Bin Li Center for Reliability Engineering.
Final Design Team 6 December 2 nd, UAV Team Specializations David Neira – Power & Propulsion Josiah Shearon – Materials Selection & Fabrication.
Probabilistic Risk Assessment (PRA) Mathew Samuel NASA/GSFC/MEI (301)
Conference on Quality in Space & Defense Industries CQSDI ‘08 Probabilistic Technology Panel: What Is Probabilistic Technology? Mohammad Khalessi, Ph.D.
National Response Department 2010 TCT Refresher Session.
Writing an Emergency Operations Plan Why do we need to plan? Spring 2008.
A&AE 450 – Senior Design Team ERV Science and communication January 23, 2000 Christopher Burnside.
Fault Tree Analysis for the BLEDP Student meeting Vegard Joa Moseng.
Using In-class Activities to Develop and Assess Core EML Competencies Andy Gerhart Don Carpenter Lawrence Technological University, Southfield, Michigan.
FOR MORE INFORMATION CONTACT:.
Snowfensive At Snowfensive.com, we provide specialized cyber security risk assessments for organizations. We also give security awareness training for.
Chapter 10 Module  Insurance that pays for the costs of a crash that you caused is called liability insurance  The financial responsibility law requires.
Second Grade Mr. Madurzak
PRA: Validation versus Participation in Risk Analysis PRA as a Risk Informed Decision Making Tool Richard T. Banke– SAIC
The Changing Workplace
Critical systems design
CHAPTER11 Project Risk Management
Strategy Review Sessions September 11 and 12, 2017
Safety and Risk.
U.S.D.A. FOREST SERVICE REGION 6
Fire Risk Assessments Bedfordshire - Pat-testing-bedford.co.uk
Team 1: 32 responses Team 2: 55 responses Team 3: 29 responses
Organization Name Presenter’s Name.
Presented By: Daniel J. Brown, CQA
सोलर पॅनेलचा उपयोग करुन रीचर्जेबल टॉर्च बनवणे.
© [2012] Orbital Sciences Corporation. All Rights Reserved.
Planetary Protection Category V Restricted Earth Return
דיני חברות ד"ר ויקטור ח. בוגנים
Team B, Power Group Wiyan Wong 1/23/01.
Risk Assessment Matrix
Mohammad Khalessi, Ph.D. CEO/President PredictionProbe, Inc.
How Trustworthy are your Systems?
Probable Impact on Corporation Probability of Occurrence
Risk Management Prior to the scheduling, announcement, or contracting for facilities & services, is it recommended that the Event Coordinator ensure review.
Hurricane Irma Emergency Support Plan
Team A, Power Group Presentation
Probabilistic Volatility in the Western Interconnection
INCIDENT On 26 November 2010 at about 0910H, a 1,500 gal. cap. fuel tanker belonging to BIS (IECC subcontractor) was approaching a curve section of Fahud.
Team A Propulsion 1/16/01.
Critical Design Review
Presentation transcript:

Jaret Matthews AAE 450 Team A Cost & Risk Assessment Jaret Matthews AAE 450 Team A

Project Goals & Redundancy Minimize Cost 95% Probability of safe return of the crew 80% Probability of mission success Life critical = 3 levels of redundancy Mission critical = 2 levels of redundancy

Cost Analysis Spacecraft/Vehicle Level Cost Model Top level model derived from NAFCOM Contacting Science Applications International Corporation – NAFCOM 96 Development, production, and operations cost modeling of aerospace projects

Risk Assessment Probabilistic Risk Assessment (PRA) Comprehensive systems analysis that quantitatively expresses risk of failure Can be recalculated throughout development and influence design

Probabilistic Risk Assessment Solar panels function normally Batteries are charged Fuel cells are OK End States S= Success F=Failure Micro- meteorite impacts solar panels S=.80 .80 S=.12 .20 S= 95% .60 S=.028 .40 .35 F= 5% F=.052 .65

Probabilistic Risk Assessment End States S= Success F=Failure Tire stays inflated Spare is OK Jack is OK Tires roll over road hazard S=.05 .05 S= 51% S=.456 .95 .80 .60 .40 F=.304 F= 49% .20 F=.19

Special skills AAE590K AAE590C AutoCAD Bryce 3D

Bryce 3D