Rail Safety Worker Engineering and Design Competency

Slides:



Advertisements
Similar presentations
Transition from Q1- 8th to Q1- 9th edition
Advertisements

Contractor Safety Management
Laboratory Personnel Dr/Ehsan Moahmen Rizk.
Secure System Administration & Certification DITSCAP Manual (Chapter 6) Phase 4 Post Accreditation Stephen I. Khan Ted Chapman University of Tulsa Department.
© The Association of Independent Schools of NSW Preparing for the ASQA Audit.
DITSCAP Phase 2 - Verification Pramod Jampala Christopher Swenson.
Quality Manual for Interoperability Testing Morten Bruun-Rasmussen Presented by Jos Devlies, Eurorec.
AUDITS AND INSPECTIONS
ISO 9000 Certification ISO 9001 and ISO
SELECT Scheme Provider Certification of Construction (Electrical Installations to BS 7671)
Risk Assessment – An Essential Standard
Internal Auditing and Outsourcing
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
Fire Department Accreditation and Self Assessment Overview
IN FOCUS LEGAL AND OTHER REQUIREMENTS RECYCLER QUALIFICATION OFFICE MARCH 2014.
Introduction to ISO New and modified requirements.
Accreditation & Certification in Forensic Science Understanding the Difference Phil T. Pulaski, Esq. Retired Chief of Detectives, NYPD.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Staffing and Training.
ISO 9001:2000 QUALITY MANAGEMENT SYSTEM REQUIREMENTS
Health and Safety Executive Health and Safety Executive Construction (Design and Management) Regulations 2007 July 2010.
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
2008 New York - Member Forum Council for Responsible Jewellery Practices, Ltd. Overview of CRJP.
Cross-cutting Issues And other things your project document must include.
Successfully recording Continuing Professional Development.
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
Neighbourhood Planning. What is neighbourhood planning? Neighbourhood planning gives communities direct power to develop a shared vision for their neighbourhood.
QUALITY MANAGEMENT STATEMENT
Staffing and training. Objectives To understand approaches to the development of strategies and policies for staffing of a Regulatory Authority including.
Hull Survey for New Construction Z23 (July 2006) John Finch Chairman IACS expert group on the Hull survey for New Construction September 2006.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Webinar FSSC audit report 7th september 2015
Revised AQTF Standards for Registered Training Organisations Strengthening our commitment to quality - COAG February August 2006.
It was found in 1946 in Geneva, Switzerland. its main purpose is to promote the development of international standards to facilitate the exchange of goods.
The quality assurance of tertiary education in New Zealand
1 Verification Overview What is Verification?  Independent, third-party review of reported emissions Why is it Important?  Ensures that an inventory.
HEaTED’s Competency Assessment Toolkit for Technical Staff (CATTS)
Pertemuan 14 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Workshop on Accreditation of Bodies Certifying Medical Devices Kiev, November 2014.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
Harmonised use of accreditation for assessing the competence of various Conformity Assessment Bodies Dr Andreas Steinhorst, EA ERA workshop 13 April 2016,
Slide 1 POA Seminar 02 March 2016 Personnel Competence Including Certifying Staff and Release to Service Andy Swift / Michael Greer.
2016/06/211 Provision of Civil Works at Simmerpan Substation PS(PDP)2015/FM/15 Date : 10 July 2015.
ISO Certification For Laboratory Accreditation ISO Certification For Laboratory Accreditation.
Continuing Competence is coming
MODULE 8: GOVERNANCE AUDIT EVIDENCE AND REVIEW
ISO/IEC
ACCREDITATION PROCESS
Technical Program Delivery Group
Competence Pack Guide to Assessment.
Safety Accountabilities
Session II: System authority for ERTMS 4RP Trackside approval
Michel BRENON IEC ExTAG Secretary
Competence Can Do or Have Done!. Competence Can Do or Have Done!
Temporary Works Co-ordination
Presentation Title: View > Header & Footer
Quality Management Systems – Requirements
Principal Contractor Licensing Scheme Standard
Achieving ISO Compliance
Engineering Waiver Management
Competence Pack Guide to Assessment.
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
Operationalizing Export Certification and Regionalization Programmes
How to conduct Effective Stage-1 Audit
PSS verification and validation
Overview of the recommendations on software updates
Radiopharmaceutical Production
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
CEng progression through the IOM3
Presentation transcript:

Rail Safety Worker Engineering and Design Competency 30/08/17

Background MTM has regulatory obligations and accreditation requirements to ensure that Rail Safety Workers (RSW) are competent for the tasks they are completing. Currently, RSW performing ‘Engineering & Design’ rail safety work must comply with the ‘Business Rules Manual for the Contracting Rail Safety Worker’ (L0-HMRMAN-001). Signalling has a mature process for management of Engineering and Design RSW using a Statement of Competence to provide transparency of individuals competence. Other disciplines have a “high level” system that was appropriate at the time, but no longer provides sufficient clarity around individuals level of railway specific competency, especially with the influx of new RSW. Metro | Rail Safety Worker Competence

Identifying and of Competency MTM are introducing a “Statement of Competency” for the following disciplines: Electrical Networks (Power Engineering and Overhead) Track and Civil Structures Building Services Architectural Rolling Stock (Electrical, Mechanical, Communictations) These will provide additional clarity to MTM and help fulfill its regulatory and accreditation requirements. Metro | Rail Safety Worker Competence

Assessment of Competence (Existing) Evidence of Tertiary Qualifications Qualifications depend on role. Overseas qualifications recognised (Washington Accord or Sydney Accord) Current Resume Record of relevant experience Compulsory minimum years of relevant experience required Reviewed every 4 years (most are due now due to RRL) Don’t have adequate transparency. For example, can’t tell difference between OHW and Substation Designer, or Track Designer and Drainage Designer, etc. Metro | Rail Safety Worker Competence

Assessment of Competence (Proposed) Evidence of Tertiary Qualifications and CV same as existing Statement of Competence now required Demonstrate relevant experience in line with discipline specific role descriptions “Element of confidence” based on ARTC assessment (a.k.a. skills) Metro | Rail Safety Worker Competence

Assessment of Competence (Proposed) Technical and Leadership Competencies Element of Competence Description Designer Level Checker level Approver Level Interpret and scope design requirements including design drawings. Undertstands requirements of discipline specific standards and project Funtional Requirements and can apply to the design process. Evaluates and reviews discipline specific design scope requirements and identifies any gaps, or recommends changes to Standards/Functional Requirements if appropriate. Provide consultation, direction and leadership in the design process and capable of approving design scope. Ensures staff have appropriate experience to undertake detailed scoping tasks, defines systems to ensure requirements are addressed. Understanding the drafting requirements to satisfy the CAD Standard Follows processes to review the acceptability of submitted DMS drawings in accordance with MTM and PTV Standards. Evaluates and reviews discipline specific drawings for approval and recommends any dispensations that would be acceptable in accordance with PTV CAD Standards. Identifies existing DMS drawings that need to be revised or superseded. Provide consultation, direction and leadership in the preparation of Drawing Management Plans, CAD systems, CAD drawings with the capability to approve discipline specific drawings. Undertake site investigations/ inspections and surveys to ensure base design data is verified. Identifies requirements for site investigations and surveys, follows processes to capture site investigation information suitable for inclusion on drawings. Evaluates and reviews discipline specific site investigation information on drawings and arranges approval as the competent employee in the drawing title block. Provide consultation, direction and leadership in the capture of information for site investigation/surveys. Ensure designs are compliant with Standards and Functional Requirements. Completes self check of work, follows defined processes to have work checked/verified, incorporates review comments. Evaluates and reviews discipline specific design documentation for compliance to standards and Functional Requirements. Provide consultation, direction and leadership in the preparation of Design Management Plans with appropriate system for ensuring design documentation meets requirements. Investigate the acceptability of non-conformances and prepare standard waiver submissions Prepares information pertaining to non-conformances to assess acceptability. Evaluates and reviews non-conformances against Standards and provides MTM with recommendations for controls. Provide consultation, direction and leadership in the presentation of standard waivers. Ensure integration of engineering systems with other professional input Follows processes to review the integration of railway systems during the design process and within the submitted drawings, identifies where design is dependant on specialist advice/reports (eg geotechnical, bonding). Identifies and manages interfaces between railway disciplines, evaluates requirements from specialist advice, evaluates and reviews integration of design documentation for acceptance. Provide consultation, direction and leadership in the integration of railway systems, defines and applies process to ensure interfaces are managed. Undertake the validation of designs (design checking and independent reviews) Evaluates and reviews discipline specific design documentation for compliance to standards and Functional Requirements, ensures non-conformances are addressed, recommends controls for non-conformances that can't be resolved. Ensures staff have appropriate experience to undertake checking verification tasks, defines systems for checking/verification of design documentation, documents process in Design Management Plan. Preparing and maintaining documentation during the design process Ability to prepare and maintain documentation during the design process in accordance with prescribed quality processes. Provides direction and leadership to management of design documentation including management of discipline specifc design items (eg computations, design models, specialist reports). Provide consultation, direction and leadership developing systems for maintaining documentation, developed document process in Design Management Plans with appropriate systems to ensure quality control is effectively managed during the design process. Metro | Rail Safety Worker Competence

Assessment of Competence (Proposed) Benefits for industry include: Compulsory minimum years experience now “Recommended,” providing adequate competency levels are demonstrated. More flexibility to demonstrate higher level competency (eg a designer with 4 years of relevant experience designing pedestrian crossings may achieve a Checker competency for that area but Designer for other areas) Easier for Designers/Checkers who are not “railway” designers to achieve competency in a specific area (eg a Fire Protection Engineer with only building industry experience). Metro | Rail Safety Worker Competence

Timeline New SOC and “Engineering and Design” matrix to go live on Onsite Website and Metro Academy in September 2017. MTM will issue notification to all Designers, Checkers and Approvers with a MTM Competency. Designers will have 9 months to provide relevant evidence and get assessed to the new SOC. Most MTM Competencies were issued for Regional Rail Link Project (4 years ago). This re-assessment aligns closely with the timeframe requirements to be re- assessed. Metro | Rail Safety Worker Competence