CF CE plan for 2017 2017-04-20
Contents CF CE achievement for 2016 CF CE plan for 2017 Support needed Implemented CE lane in VPI projects Kicked off ESI project with DBU for off-highway Supported CFSW for ISG application improvement CF CE plan for 2017 Execute ESI project with DBU for off-highway Support EBU NS VI project from CE lane Improve DAQ capability Support needed Need CCI support to build CF DAQ for field test Insert Data Classification
CF CE achievement for 2016 Implemented CE lane for CF VPI projects TPL take the role for VPI and VPC E&D TPL completed CE lane 101 and 201 training Global CE review transferred to local Review Insert Data Classification
CF CE achievement for 2016 Kicked off ESI project with DBU for off-highway Pingsuo mining Nanoforce air filter 500hr to 3000hr Excavator with QSB 7 Nanonet fuel filter 500hr to 1000hr Insert Data Classification
CF CE achievement for 2016 Supported CFSW for ISG application improvement Release new fuel filter for ISG coal mining region More robust fuel water separation More water sump Three stages Insert Data Classification
CF CE plan for 2017 Execute current ESI project with DBU Extend ESI to more application and more product line Insert Data Classification
CF CE plan for 2017 Support TPL for EBU NS VI projects from CE lane Build connection with OEMs CE lane review Insert Data Classification
CF CE plan for 2017 Improve DAQ capability Support filtration field test Improve RPS through date driving Build DAQ capability for filtration system with Pressure,Temperature,Flow Rate etc. Insert Data Classification
Support needed Need CCI support to build CF capability on DAQ Share common DAQ suit for filtration system Customized DAQ Less channel Wireless data collection Simply installation Cheaper Insert Data Classification