API 17Q Proposed Technical Changes to Rev 0

Slides:



Advertisements
Similar presentations
Technical update on ISO 9001:2015 Colin MacNee Duncan MacNee Limited
Advertisements

THE STANDARDS DEVELOPMENT PROCESS STEP 1 PUBLIC AND COMMITTEE PROPOSAL STAGE PUBLIC AND COMMITTEE PROPOSAL CLOSING DATE FIRST TECHNICAL COMMITTEE MEETING.
Standards and Certification Training Module B – Process B5AStandards & Certification Project Management.
First Article Inspection Report
Subsea Standardization. Brief History SPE ATW on Subsea Standardization held Dec 2008 SPE ATW on Subsea Standardization held Dec 2008 –Form workgroup.
Don Wells Hess Corporation
CFR Index, Thesaurus of Indexing Terms, and Agency List of Subjects
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
Proceedings and Report of the Expert Meeting: Arrangements Proceedings and Report of the Expert Meeting: Arrangements.
API Standard 6X: Design Calculations for Pressure-Containing Equipment
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC-18 Liaison Report TG-3: Definition of.
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
API 17N (and Q) Subsea Production System Reliability, Integrity, and Technical Risk Management.
SC13 –TG 2 PUBLICATIONS ISO / TC67 / SC3 / WG1 Worthington Renaissance – Ft. Worth, TX 26 Jan 2011 – 8:00 am.
API 17N Subsea Production System Reliability, Integrity, and Technical Risk Management Don Wells Hess Corporation.
Doc.: IEEE /0792r0 Submission July 2008 Adrian Stephens, Intel CorporationSlide TGn Editor Report July 2008 Date: Authors:
Doc.: IEEE /320R0 Submission May 2003 Terry Cole, AMDSlide SDL Amendments Terry Cole, AMD WG Technical Editor.
SAB Status Report Paul Eastman Chair, SAB Special Projects 3 June 2015.
API 19 CI Chemical Injection Devices for Downhole Applications
Modular Value Stream Safety Map (MOD VSSM)
Task Group API 19SS Sand Screens
ISO/TC 204 WG 3-Database Technologies
Carry Over From API SC6 Winter Meeting API Spec 6A Tensile Test Requirements Tim Haeberle 30 June 2011.
Task Group API 19SS Sand Screens
SC 6 Task Group 1 Pipeline and Valve Standards Status Report
IDN Variant TLDs Program Update
2017 Amendments to the INCITS Organization, Policies and Procedures
IEEE Working Group for Wireless Personal Area Networks™
Standards and Certification Training
November 18 <month year> doc.: IEEE < e>
API RP 17A - Discussion Points
API 17Q – Subsea Equipment Qualification
Software Measurement Process ISO/IEC
LB8 Summary Report LB8 opened 9Feb01 12am EST, closed11Mar01 12am EST.
Submission Title: [WG-TG3 Opening Report May03]
<month year> doc.: IEEE ptc November 2013
Motion IEEE Standards withdrawals to RevCom
March Supporting Material and Motions for the Closing EC Meeting March 9, 2018 Hyatt Regency O’Hare Bob Heile, Wi-SUN Alliance.
IEEE R Comment Resolution
API 14H Task Group Status Proper Classification of Document
Specification on float equipment
July 2010 doc.: IEEE /0xxxr0 Responses to JTC1 NBs to comments made on FDIS ballots on IEEE ac & IEEE af 17 July 2015 Authors: Name.
First 8 slides are what was presented in San Fransisco…
Submission Title: [WG-TG3 closing Report May02]
Legal framework of territorial classifications and typologies for European statistics – state of play NUAC meeting, Brussels June 2015 Gorja Bartsch.
Motion IEEE Standards withdrawals to RevCom
Don Wells Hess Corporation
API 14H Task Group Status Proper Classification of Document
P802.16q Closing Report for Session #89
Specification on float equipment
GRIDMAN Task Group Opening Presentation Session #78
<month year> doc.: IEEE < e> <Mar 2018>
API Publication Types From “API Document Format and Style Manual” and “Procedures for Standards Development” the following are “standards” 1. Bulletin.
Submission Title: [REVCOM Submission Information]
Submission Title: [Task Group 1 Report] Date Submitted: [8May00]
API SC 10 WG15 Stage Cementing Collars
Review of the 1958 Agreement
TGn Editor Report Sept 2008 Date: Authors:
Technical Communication
Nov 2012 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Closing report for TG4j (MBAN) Task Group, Nov.
API RP 17Q Status January, 2014 First Edition issued June 18, 2010
Sheung Li Task Group J Chairperson March 19, 2004
The Code-Making Process
March Supporting Material and Motions for the Closing EC Meeting March 9, 2018 Hyatt Regency O’Hare Bob Heile, Wi-SUN Alliance.
<month year> doc.: IEEE < e> January 2012
P802.16q Closing Report for Session #89
May 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG w May 2019 Closing Report] Date.
Motion IEEE Standards withdrawals to RevCom
REC Data Specification and UK Link File Formats
Presentation transcript:

API 17Q Proposed Technical Changes to Rev 0 Page 1

Revision to API 17Q Contents Recent history Annex A & C in Rev 0 Proposed Annex A & C in Rev 1 TRL Recorded on PQS PQS color coding PQS Communication (Clarification only) * Editorial changes have not been listed in this document. Page 2

Recent History Jun-09 Outcome of Ballot to Publish: - 16 Positive votes - 3 Abstention votes - 2 Negative votes Fall-09 Worked with negative voters to find acceptable amendments. Focus was on PQS’s in Annex C Nov-09 Meeting of 17Q Task Group agreed proposed amendments to the document. Both negative voters agreed to the proposed changes. Jan-10 Revised document posted on API website and any final comments requested. Feb-10 Scheduled Ballot for Publication (Note: Ballot for Publication required owing to Technical changes). Page 3

PQS Sheets are detailed in Annex C PQS Sheets in Rev 0 Annex A lists the Subsea components PQS Sheets are detailed in Annex C Rev 0 PQS sheets detail references to API documents as well as specifics of testing required. Also listed are tests that are supplemental to industry standards. Page 4

Proposed change to PQS sheets Subsea Systems References to Industry Specs detailing validation testing moved from the individual PQS sheets to a table in Annex A. The individual tests are no longer detailed on the PQS pro forma’s in the RP document. Supplier will populate the individual Validation Tests from the specified API Specs. Either the Supplier or the Operator can detail/specify Validation Tests that are in supplemental to industry specs. Page 5

TRL Recorded on PQS PQS example Proposed changes include adding a box in the PQS to enable Supplier to provide TRL number (in accordance with API 17N). Page 6

PQS Color Coding PQS example Proposed changes to the color coding on the PQS sheet to enable either Operator or Supplier to detail qualification tests. A. Yellow areas designed to be completed by Supplier. Blue areas designed to be completed by Operator. White areas can be completed by either Supplier or Operator. C. B. A. Page 7

Supplier/Operator PQS Communication PQS Communication – Clarification Supplier/Operator PQS Communication Note: This diagram has been added to the document. Its purpose is simply to clarify the process described in Rev 0 of the document, i.e. it is not a change to what is already in place. Page 8