Engineering Projects Update Al Moro, P.E. Chief Harbor Engineer January 20, 2010
Dredging and In-Water Projects 1 Main Channel II – ACOE Remedial - IR Site 7 Pier G Landfill Removal of Intake Structure 2 4 3 4 3 1 2
EIR Consideration 1 3 2 3 2 1 4 4 Pier S Marine Terminal Back Channel Bottom widening GD Bridge Replacement On-Dock Rail Support Yard Terminal Island Rail Improvements 1 3 2 3 2 1 4 4
Roadway Projects 3 2 4 1 2 1 3 4 Traffic Signal at Harbor Scenic (Complete) Shoemaker Bridge - Barrier Repairs and Deck Sealing Anaheim and Santa Fe Ocean Blvd over LA River and Harbor Scenic 1 2 1 3 4
Rail Infrastructure Projects Track Realignment at Ocean Blvd. On Dock Rail Support Yard* Terminal Island Rail Infrastructure* *Pending EIR
Shore Power Projects Pier A Pier C Pier T Pier G Pier J Middle Harbor
SCE Coordination Maintain Essential Use Status Negotiating a New Portwide Service Agreement Negotiating Competitive Electrical Rate Rule 18 Deviation (sub meter shore to ship power) Method of Service High Voltage Tariff Rate
Portwide Infrastructure Water Facilities Assessment Study Sewer Assessment Study Pavement Management Plan
Marine Oil Terminals Engineering and Maintenance Standards (MOTEMS)