Working Group 2A ECOSTAT Finalisation of the intercalibration register Presented by Wouter van de Bund Joint Research Centre Institute for Environment.

Slides:



Advertisements
Similar presentations
National typologies - reports Presented by Sandra Poikane Joint Research Centre Institute for Environment and Sustainability.
Advertisements

Intercalibration Guidance: update Sandra Poikane Joint Research Centre Institute for Environment and Sustainability.
WG 2A ECOSTAT Meeting 4-5 March 2004 Meeting of the WFD CIS Working Group 2A ECOSTAT summary Presented by Anna-Stiina Heiskanen Joint Research Centre The.
ECOSTAT 8-9 October 2007 River GIGs: Future intercalibration needs/plans Presented by Wouter van de Bund Joint Research Centre Institute for Environment.
ECOSTAT 1-2 October 2008 Intercalibration – status of ongoing work – Coastal/Transitional Presented by Wouter van de Bund Joint Research Centre Institute.
Framework for the intercalibration process  Must be simple  Aiming to identify and resolve big inconsistencies with the normative definitions and big.
WG2A meeting 7-8 October 2004 Working Group 2A ECOSTAT Agenda item 9b Discussion on final Intercalibation register.
Updating the intercalibration process guidance Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Overview and first analysis of the IC register
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
Task on Harmonisation of Freshwater Biological Methods
Intercalibration excersice progress report Presented by Palle Haastrup Joint Research Centre Institute for Environment and Sustainability Inland.
Common Implementation Strategy for the Water Framework Directive Working Group A ECOSTAT Ecological Status 7th Meeting Stresa, Lago Maggiore, Italy
IC network selection process
Results of the metadata analysis Meeting of the Working Group 2A on Ecological Status (ECOSTAT) March 4-5 , 2004, Ispra, Italy Peeter Nõges Anna-Stiina.
WG 2A Ecological Status Drafting group: Guidance on the process of the intercalibration excercise 2nd meeting WG2A, 15-17/10/03.
Synthesis of the intercalibration process Working group 2.5.
Working Group 2A ECOSTAT Objectives & Agenda of the meeting March 2005
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
Chemical Monitoring mandate
Intercalibration Report on State - of - play and way forward Presented by Anna-Stiina Heiskanen Joint Research Centre The Institute for Environment.
WG 2A Ecological Status First results of the metadata collection for the draft intercalibration register 2nd meeting WG2A, 15-17/10/03.
River GIGs: Future intercalibration needs/plans Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Draft Commission Decision on Intercalibration
Task 1 - Intercalibration WG 2A ECOSTAT - Intercalibration
River GIGs: Checking and completing the Decision Annex Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Working Group 2A ECOSTAT Summary progress report River GIGs Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
EU Water Framework Directive
Working Group 2A ECOSTAT Intercalibration process - state of play Wouter van de Bund & Anna-Stiina Heiskanen Joint Research Centre Institute for Environment.
Progress report ATG Hymo 1 May – 20 October 2016
Harmonisation Activity Progress report
WG 2.5 Intercalibration.
Intercalibration Timetable
Common Implementation Strategy for the
Update on progress since last WG meeting (13-14 June 2002)
Meeting of the WFD CIS Working Group 2A ECOSTAT Introduction & objectives Presented by Anna-Stiina Heiskanen Joint Research Centre The Institute.
Working Group A ECOSTAT Update on intercalibration Prepared by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
on a protocol for Intercalibration of Surface Water
Meeting of Water Directors Eutrophication Guidance
Project 2.7 Guidance on Monitoring
Progress Report Working Group A Ecological Status Intercalibration (1) & Harmonisation (3) Activities Presented by Anna-Stiina Heiskanen EC Joint Research.
WFD – CIS Working group A ECOSTAT
Activities of WG A Ecological Status
WFD River Basin Management Plans :
WG A Ecological Status Progress report April-October 2009
EU Water Framework Directive
Water Directors meeting Mondorf-les-bains, June 2005
EU Water Framework Directive
Working Group A ECOSTAT progress report on Intercalibration Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Water Directors meeting Warsaw, 8-9 December 2011
IC remaining gaps: overview and way forward
Water Directors meeting Spa, 2-3 December 2010
Working Group 2A ECOSTAT Guidance for the intercalibration process Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
WG A ECOSTAT Intercalibration guidance : Annexes III, V, VI
Metadata analysis.
WFD CIS 4th Intercalibration Workshop
Status of the Nutrient Best Practice Guide
Guidelines to translate the intercalibration results into the national classification systems and to derive reference conditions Presented by Wouter.
Stuart McAllister ESTAT F4
Standardisation/Harmonisation
Common Implementation Strategy for the
WG A Ecological Status Progress report April-October 2010
Reporting template for milestone reports
Common Implementation Strategy for the
EU Water Framework Directive
WFD CIS WG ECOSTAT meeting on 8-9 October 2007 Objectives What do we need to achieve during this meeting?
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
WG A Ecological Status Progress report October 2010 – May 2011
Why are we reviewing reference conditions in intercalibration?
Presentation transcript:

Working Group 2A ECOSTAT Finalisation of the intercalibration register Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland and Marine Waters Unit

Timetable for finalisation of the register April 28, 2004: Revised web-based metadata entry opened (4-week delay) http://wfd-reporting.jrc.cec.eu.int 25 May 2004: deadline for adding/ revising intercalibration site entries to the register 27-28 May 2004: (draft) Final register presented to SCG and WFD Committee

“List of sites proposed for the final intercalibration register“ Overview of sites submitted by the agreed deadline (25 May): Submission through web interface Supplemented by tables where technical problems prevented MS from using the web interface Tables need to be checked – may contain errors

Numbers of sites submitted for final register

Intercalibration register Most countries have submitted or will submit sites: No response from Malta Lakes: BG, CZ, LU, SK indicated that they have only small (<0.5 km2) lakes

Rivers: numbers of sites by GIG (status 25 May 2004)

Lakes: numbers of sites by GIG (status 25 May 2004)

Coastal: numbers of sites by GIG (status 25 May 2004)

Rivers (status 2 July 2004) Electronically submitted: 493 sites (56%) 22 countries

Lakes (status 2 July 2004) Electronically submitted: 250 sites (64%) 19 countries

Coastal/Transitional (status 2 July 2004) Electronically submitted: 172 sites (84%) 15 countries

Finalisation timetable Member States finalise site submissions (with site specific metadata) as agreed at the WFD Committee meeting by 15 September Site information will be made available for GIG experts for planning of the details of intercalibration process analysis of the composition and comparability of the final network