Resource Leveling Advantages/Applications of Resource Leveling

Slides:



Advertisements
Similar presentations
Work Breakdown Structure WBS
Advertisements

PROJECT BREAKDOWN Construction stages can be broken down into many operations that define the major elements to be performed The Single Relationship Finish.
Example 3 Market Equilibrium Chapter 2.3 Suppose the daily demand for a product is given by, where q is the number of units demanded and p is the price.
THE HIERARCHY OF SCHEDULES. DR. Nabil Dmaidi 1. Materials Need to determine – Quantities takeoff – Availability and probable delivery time – Type of materials.
ELC 347 project management Week 11. Agenda Integrative Project –3rd part Graded –4 th part due next week –Outline of deliverables (posted in WebCT)Outline.
Chapter 17 Inventory Control 2.
Project Scheduling: Networks, Duration estimation, and Critical Path.
MGMT 483 Week 8 Scheduling.
1 Operations Management. 2 Organization Three Legged Stool Finance Operations Marketing.
Note: Daily averages are based on Julian day 28,14, and 7-day averages are rolling, to precede the given upwelling date. One day mean minus 28-day mean.
Time Management Ahmed Awad, Ph.D., PMP. Time Management It includes the processes required to ensure timely completion of the project. b Activity Definition.
Assignment #17 Solution Monday, March 15, 2015
Scheduling Computations for Precedence Networks. Prof. Awad Hanna Tabular Format (Precedence Diagram)  Can be carried out on the tabular form without.
Cellular Manufacturing and Plant Layout
Prof. Awad Hanna Precedence Diagram Advantages of using Precedence Diagram: 1. No dummy activity are required. 2. A single number can be assigned to identify.
Prof. Awad Hanna Estimating Activity Duration Time Interval  Time Interval is selected according to the nature of the activity (seconds - minutes…) 
Prof Awad S. Hanna C HANGING P ROJECT D ELIVERY S YSTEMS by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison Department of Civil and Environmental.
Structural Steel Prof Awad S. Hanna.
@ Industrial Engineering by Bopaya Bidanda David I. Cleland.
Network Scheduling : Precedence Diagram Method
BAR CHART Develop by Henry Gantt. Definitions Activity
Operations Management Class 20 Tuesday 11/8/11. Operations Management (OM) The development and administration of the activities involved in transforming.
Number of Injuries Overall Workers Comp Cost $ $ $ $ $ $ $ $
SUPPLY CHAIN MANAGEMENT (SCM) The supply chain encompasses all activities associated with the flow and transformation of goods from the raw materials stage.
Supply Chain Integration February 24, 2014 Jason Cox Chief Technical Officer Cox Machine, Inc.
Meeting Customer Needs Identifying Customer Needs Customer Contact.
Prof Awad S. Hanna Equipment Costs and Sources of E QUIPMENT C OST.
Lags in Precedence Relationships
The Balanced School Day Our Lady of the Assumption School Looking Ahead to Student Success Student Learning.
Bargaining Agreement Administration (Input) Define Bargaining Agreements & Negotiations Identify Communication Channels Determine & Maintain Seniority.
Resource Leveling Advantages/Applications of Resource Leveling 1. Maintain the lowest uniform number of employees to perform the work. 2. Establishing.
Prof Awad S. Hanna Project : Student Residence  New Project  Desired Capacity = 750,000 sq. ft  Expected Completion = End of 1998  Location = St. Louis,
POM - J. Galván 1 PRODUCTION AND OPERATIONS MANAGEMENT Ch. 11: Human Resources and Job Design SUMMARY.
Prof. Awad Hanna Project Control  Major objectives for a good control plan. 1.Should accurately represent the work. 2.Permit deviations to be detected,
Allocate and Level Project Resources.  Resource Allocation: Defined Resource Allocation Resource Allocation is the scheduling of activities and the resources.
Job Evaluation Prepared By:- Prof. Tahereem Bardi.
Use-Case Diagram Railroad Ticket System credit card companies railroad Maintain schedules passenger purchase ticket.
Prof. Awad Hanna ij Activity Event (a) Basic Activity Basic Logic Patterns for Arrow Diagrams.
CH-8-Resource Planning Assist Prof Banu OZKESER December, 2015.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 8 Sources of Estimation Data.
Plot Diagram.
CHANGING PROJECT DELIVERY SYSTEMS
Managing the Information Systems Project Cont’d
by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison
UNIT II Scheduling Procedures & Techniques FLOAT
By Dr. Awad Hanna Ross Umentum
1. Which statement is true about the circular flow diagram?
Presented by Sam Supervised by Prof. Michael Lyu
(4) Critical Path Method
الوحدة 20 مهارات التواصل مع الآخرين
Chapter 15 Inventory Systems for Independent Demand
3a. Percentage of construction establishments with and without payroll, 2012.
2a. Number and percentage of construction establishments and employees, by establishment size, 2012 (With payroll) Establishment size.
3a. Number and percentage of construction establishments and employees, by establishment size, 2002 (Payroll establishments) Establishment.
Dr. Samer Odeh Hanna (PhD)
PLANNING RESOURCES 1. Materials Need to determine 2. Equipment
What Will You Learn 1. How To Plan Projects
Project management (seminar)
Resource management Chapter 12 Copyright ©2016 Pearson Education, Inc.
Project Scheduling: Lagging, Crashing and Activity Networks
Activity on Node Approach to CPM Scheduling
Quality Management Your Name.
THE HIERARCHY OF SCHEDULES
What number is the arrow pointing at?
CH-6-Production Planning
Comments: • Illustrates the management functions within a construction company • Planning supports estimating • Planning supports construction Discussion:

Монголын даатгалын зах зээлийн бодлогын асуудлууд
Approaches to Pollution Prevention
Presentation transcript:

Resource Leveling Advantages/Applications of Resource Leveling 1. Maintain the lowest uniform number of employees to perform the work. 2. Establishing plans for material delivery. 3. Reducing the daily demand for dollars. Prof. Awad Hanna

Arrow Diagram for Leveling Example Prof. Awad Hanna

Precedence Diagram for Leveling Example Prof. Awad Hanna

Early Start Schedule Information Prof. Awad Hanna

Leveling Example - Traditional Approach Prof. Awad Hanna

Resource Histogram - Leveling Example - Traditional Approach Prof. Awad Hanna