Overview and first analysis of the IC register Peeter Nõges Wouter van de Bund L. Cheimaditida, Greece Photo: E.S. Papastergiadou
Final draft IC register Data downloaded from the server on 15.09 1498 sites from 27 countries (897 R, 379 L, 184 C, 38 T) Overloading of the system towards the end of the submission period IE and LV re-submitted their coastal sites during last week WG 2A meeting, 7-8 Octpber 2004, Ispra
Promised vs submitted More than promised WG 2A meeting, 7-8 Octpber 2004, Ispra
OK Promised vs submitted WG 2A meeting, 7-8 Octpber 2004, Ispra
Sufficient but still less than promised Promised vs submitted WG 2A meeting, 7-8 Octpber 2004, Ispra
Announced that do not provide lakes Promised vs submitted WG 2A meeting, 7-8 Octpber 2004, Ispra
Promised vs submitted No promises no sites WG 2A meeting, 7-8 Octpber 2004, Ispra
Promised vs submitted No sites received WG 2A meeting, 7-8 Octpber 2004, Ispra
Withdrawn Promised vs submitted WG 2A meeting, 7-8 Octpber 2004, Ispra
Changes compared with draft IC register Lakes January 04 September 04 Sites 314 379 +21% Countries 21 22 -RO +DK +GR GIGs 7 5 -LEC –LBA Types 34 19 WG 2A meeting, 7-8 Octpber 2004, Ispra
Lake GIGs WG 2A meeting, 7-8 Octpber 2004, Ispra
22 countries WG 2A meeting, 7-8 Octpber 2004, Ispra
WG 2A meeting, 7-8 Octpber 2004, Ispra
WG 2A meeting, 7-8 Octpber 2004, Ispra
Compliance with WFD method in lakes Y N WG 2A meeting, 7-8 Octpber 2004, Ispra
H/G and G/M lakes WG 2A meeting, 7-8 Octpber 2004, Ispra
Changes compared with draft IC register Rivers January 04 September 04 Sites 653 897 +37% Countries 25 27 +DK +BG GIGs 6 5 –RBA Types 29 25 WG 2A meeting, 7-8 Octpber 2004, Ispra
River GIGs WG 2A meeting, 7-8 Octpber 2004, Ispra
27 countries WG 2A meeting, 7-8 Octpber 2004, Ispra
WG 2A meeting, 7-8 Octpber 2004, Ispra
WG 2A meeting, 7-8 Octpber 2004, Ispra
Compliance with WFD method in rivers Y N WG 2A meeting, 7-8 Octpber 2004, Ispra
H/G and G/M rivers WG 2A meeting, 7-8 Octpber 2004, Ispra
Changes compared with draft IC register Coastal January 04 September 04 Sites 83 184 +122% Countries 13 20 GIGs 3 4 +CBL Types 17 18 WG 2A meeting, 7-8 Octpber 2004, Ispra
Coastal GIGs WG 2A meeting, 7-8 Octpber 2004, Ispra
20 countries WG 2A meeting, 7-8 Octpber 2004, Ispra
WG 2A meeting, 7-8 Octpber 2004, Ispra
Changes compared with draft IC register Transitional January 04 September 04 Sites 25 38 +52% Countries 6 9 -IE +ES +IT +LT +PT GIGs 2 4 +CBA +CBL Types 5 9 WG 2A meeting, 7-8 Octpber 2004, Ispra
9 countries WG 2A meeting, 7-8 Octpber 2004, Ispra
WG 2A meeting, 7-8 Octpber 2004, Ispra
Problems encountered in the database Wrong GIGs or types Loch Sgealtair LNO L-A1 Torrente Boite RAL R-M1 Fiumi Albegna RAL R-M3 Fiume Arno RAL R-M3 R. Alaw at Llanfigael RCE R-N1 Torrente Noce-Pejo RME RAL Arnego-ARN1AG RCE R-N3 Lazna Struga REC R-C1 R. Irvine REC R-C4 Fiume Sercio Ripafratta RME R-E3 WG 2A meeting, 7-8 Octpber 2004, Ispra
Problems encountered in the database Coordinates xxxxx,xx Lon & lat mixed up (R-LU, R-LT) 1111,xx R-SE Missing values 0.0 555555555 Dummy entries WG 2A meeting, 7-8 Octpber 2004, Ispra
Problems encountered in the database Numeric entries Commas instead of decimal points Additional characters > < % Explanatory text Ranges instead a single value Obviously wrong units (TP) WG 2A meeting, 7-8 Octpber 2004, Ispra
Further steps A clean-up of the database will be carried out within next weeks at the JRC Experts will be contacted to solve remaining uncertainties Register will be submitted to Article 21 Committee for approval at their next meeting on 28 October WG 2A meeting, 7-8 Octpber 2004, Ispra
Thank you! WG 2A meeting, 7-8 Octpber 2004, Ispra