EFCOG Safety Working Contractor Assurance System Task Group Status

Slides:



Advertisements
Similar presentations
Effective Contract Management Planning
Advertisements

Roadmap for Sourcing Decision Review Board (DRB)
© 2009 The MITRE Corporation. All rights Reserved. Evolutionary Strategies for the Development of a SOA-Enabled USMC Enterprise Mohamed Hussein, Ph.D.
Contractor Assurance System AC Overview October 13, 2009.
1 Presenter: Tracy Wessler June 6, 2007 Outsourcing Quality Assurance and Contract Surveillance Activities U.S. Census Bureau Decennial Response Integration.
Integration of Quality Into Accident Investigation Processes ASQ Columbia Basin Section 614 John Cornelison January 2008.
Small Projects & Tailoring Using the PPA 1:15 – 2:15 Teresa Kinley, OPHPR With Panelists: Susan Wilkin, NCCDPHP Andy Autry, NCBDDD Carol Waller, NCEH/ATSDR.
Departmental Initiative to Enhance Activity-level Work Planning and Control DOE and DOE Contractors Industrial Hygiene Meeting in Conjunction with the.
What is Business Analysis Planning & Monitoring?
Staff Structure Support HCCA Special Interest Group New Regulations: A Strategy for Implementation Sharon Schmid Vice President, Compliance and.
Introduction to Software Quality Assurance (SQA)
INTEGRATION OF QA/ISM J. R. Yanek Chair, EFCOG ISM Working Group April 13, 2000.
1 Los Alamos Legacy Cleanup Completion Project (LCCP) Post Fiscal Year 2016 Contract(s) Industry Day Request For Information & Capability.
DCIPS Implementation Project Plan Update Army G2 Intelligence Personnel Management Office (IPMO) April 6, 2009.
DOE Integrated Safety Management (ISM) Conference Knoxville, TN August 24-27, 2009 Colette Broussard, DOE-HQ Office of Quality Assurance Policy.
Model Contract Implementation at Sandia National Laboratories Risk Based Oversight Dan Pellegrino Sandia Site Office November, 2007.
Component 8 Installation and Maintenance of Health IT Systems Unit 4 Structured Systems Analysis and Design This material was developed by Duke University,
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
July 26,  Jim Dieter – ASTM E2452 Overview  Eric Fassett – Contractor Implementation  Rick Shultz – Non-adoption of Standard  Earl Evans – Management.
ISM at the Savannah River Site Department of Energy Best Practices Workshop Work Planning and Control Tim Flake, Principle Technical Advisor Maintenance.
School Monitoring and OEPA Greg Miller MEL – 540 School Resource Management Spring 2015.
Click to edit Master title 1 1 Raymond W. Blowitski, Office of Analysis, HS-32 Phone: (301) Strategy for Implementing DOE O 210.2, DOE Corporate.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
1 1 Effective Administration of Commercial Contracts Breakout Session # Session D06 Name: Holly Walker, CPCM Corporate Learning Solutions and Contract.
Alex Ezrakhovich Process Approach for an Integrated Management System Change driven.
IV&V Facility 7/28/20041 IV&V in NASA Pre-Solicitation Conference/ Industry Day NASA IV&V FACILITY July 28, 2004.
Effective Board Governance & role of the Audit Committee Presentation by Cluster Audit Committee – July / August 2012.
Selection Criteria and Invitational Priorities School Leadership Program U.S. Department of Education 2005.
EFCOG Safety Working Group (SWG) Status June 7, 2016 EFCOG Working Group Coordination Meeting Washington, DC John McDonald, SWG Chair.
1 Office of Community Services Division of State Assistance COMMUNITY SERVICES BLOCK GRANT Office of Community Services Division of State Assistance Update.
Reporting, Monitoring and Evaluation Giovanni Rum, Chao Xing GEO Secretariat GEO Work Programme Symposium Geneva, 2-4 May 2016.
Assessing Quality Improvement in Special Needs Plans Marsha Davenport, MD, MPH CAPT USPHS Chief Medical Officer Medicare Drug and Health Plan Contract.
Data Review Team Time Spring Purpose 0 This day is meant to provide school leadership teams with time to review the current status of their.
Reporting, Monitoring and Evaluation
North Carolina Council on Developmental Disabilities
4th Assessment of Progress Against the GEOSS 2015 Strategic Targets
Office of Health and Safety Updates EFCOG ISM & QA Working Group 2016 Spring Meeting Las Vegas October 31-November 3, 2016 Patricia R. Worthington,
Operational Reviews at the National Cemetery Administration (NCA)
NTNU’s quality system for education
DOE-EFCOG ISM & QA Fall 2016 Strategic Planning & Direction
Driving Through the California Dashboard
Public School Monitoring Roadmap
Data Review Team Time Fall 2013.
Data Review Team Time Winter 2014.
Supporting Learning and Organisational Effectiveness
DOE NNSA CAS EFCOG/DOE CAS Effectiveness Task Team Sharon Steele Office of the Chief Defense Nuclear Safety (NA-511) November 16, 2016.
Data Review Team Time Spring 2014.
Efcog Contractor assurance Working Group (CAWG) Update
Establishing Strategic Process Roadmaps
Transforming Hidalgo County CSCD into an Evidence Based Agency
November, 2016 Efcog Contractor assurance Working Group (CAWG) Update Maturity evaluation Tool (MET) Presentation is divided into two sections CAS MET.
The Federal Oversight and Contractor Assurance System Directives Safety Culture Improvement Panel Meeting September 7, 2016 Patricia.
Contractor Assurance Systems (CAS) Summit August 23, 2016
Statistics Governance and Quality Assurance: the Experience of FAO
Gary Carlin, CFN 603 September, 2012
1915(i)& (k) Implementation Update
Recommendation to the Board of Directors: New District Assessments
Title I Annual Parent Meeting
The Heart of Student Success
Deconstructing Standard 2a Dr. Julie Reffel Valdosta State University
North Carolina Council on Developmental Disabilities
PUBLIC SCHOOL CHOICE RENEWAL PROCESS
Driving Through the California Dashboard
DISTRICT ACCREDITATION QUALITY ASSURANCE REVIEW
2018 EFCOG Safeguards & Security Working Group Annual Meeting
Internal Audits Management Review Meetings
TTF.
Training Working Group FY2019 EFCOG Working Group Chair Meeting
Using the California After School Program Quality Self Assessment Tool
DOE-EFCOG ISM & QA Spring 2017 Strategic Planning & Direction
Presentation transcript:

EFCOG Safety Working Contractor Assurance System Task Group Status John McDonald, Safety Working Group, Chair Patricia Allen, CAS Technical Subgroup, Chair Darlene Murdoch, CAS Technical Subgroup Vice Chair September 7, 2016

Contractor Assurance Benchmarking Efforts The overall task is to develop a tool to gauge the maturity of Contractor Assurance programs The April 2016 CAWG meeting focused on DOE Order 226.1 requirements and presentations from multiple Sites/Projects/Laboratories Contractor Program

DOE Order 226.1B Requirements for CAS The CAS must, at a minimum, include the following elements: A method for validating the effectiveness Self-assessment and feedback and improvement activities An issues management system Process for determining causal factors and corrective actions, conduct effectiveness reviews, and communicate issues/trends Contracting Officer communications Lessons learned programs Metrics and targets CAS description approved by DOE CAS data readily available to DOE

Summary of Benchmarking Review A total of eight contractors were benchmarked, and all contractors had the core elements of DOE Order implemented. Several best practices were identified: Self-assessments Feedback and lessons learned Issues management Performance evaluation Management oversight/review boards Contract governance processes Involvement with corporate parents, third party reviews, etc.

CAS Survey Survey was completed in July 2016 Twenty projects/facilities responded Data is being compiled and analyzed, and will be reviewed at the Fall EFCOG meeting A total of 66 questions were included. An example of survey questions on the assessment process: Describe how self-assessments are selected. Is the assessment planning process risk based? Are criteria used to identify risk informed assessments? Does the assessment program cover “potentially high consequence activities”? Is the quality of assessments evaluated?

Maturity Evaluation Tool The survey results will be the foundation for the development of the CAS Maturity tool. The survey requested specific information on which to support building the model. The tool will assist Contractors in evaluating the maturity of their Contractor Assurance programs and to share best practices across the DOE Complex.

Example of Maturity Evaluation Tool for Self-Assessments The criteria start with basic elements required by DOE Order 226.1B, and continue through criteria expected for a mature self-assessment program. The survey responses will support the description of the varying levels. A self-assessment process is in place. The self-assessment process is risk based. All levels of management participate in the self-assessment program. The quality of self-assessments is evaluated (graded). The effectiveness of the self-assessment program is monitored through review of contractor performance to ensure continuous improvement. Increasing maturity level

Summary The goal is to develop a tool to assist Contractors in evaluating the maturity of their Contractor Assurance programs and to share CAS best practices across the DOE Complex. The survey has been completed and initial analysis is undeway. Results of the survey will be reviewed and discussed at the FAll EFCOG meeting as input to the maturity tool. A CAS Maturity Evaluation Tool will be developed during FY17.