LCLS Linac Technical Design Review Charge

Slides:



Advertisements
Similar presentations
Executive Session Director’s CD-1 Follow-Up Review of the APUL Project November 2-3, 2009 Dean A. Hoffer.
Advertisements

OFFICE OF SCIENCE 1 Closeout Presentation and Final Report Procedures.
OFFICE OF SCIENCE Kin Chao, Chairperson DOE/SC Review Committee Office of Science, U.S. Department of Energy Review Committee.
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Dave Paveglio, Contract Administrator NSLS-II PAC Meeting May 25, 2007.
SYLVIA KARMAN MARK TRAPANI ELIZABETH KENNEDY Content Model and Disability Evaluation Constructs (DEC) Inventory.
Cost, Schedule & Funding Closeout Jan Joint DOE/NSF CD2/3a Review 1 DOE/NSF Review of the Dark Energy Survey (DES) Project SC 6/7 Cost, Schedule.
Mark Reichanadter LCLS FAC April 20-21, 2006 Meeting of the LCLS Facilities Advisory Committee LCLS Project Management M.
OFFICE OF SCIENCE Review of Critical Decision 2 for the Large Liquid Argon Detector for Neutron Physics (MicroBooNE) at Fermi National Accelerator Laboratory.
LCLS Undulator Systems TDR Charge Linac Coherent Light Source Stanford Linear Accelerator Center Technical Review, March 3, 2004.
M. Scharfenstein - ES&H Coordinator 8 June 2009
1 BROOKHAVEN SCIENCE ASSOCIATES Authorization Basis Plan Steven Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting December 10 – 11, 2009.
CHE 165 Plant Design Introduction. Greensheet Review  Target is Study –Reported Verbally and in Text –Consists of Various Components  Most are submitted.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Martin Fallier Director, Conventional Facilities Conventional Facilities Value and Risk Management May 8, 2008.
OFFICE OF SCIENCE 1 Closeout Presentation and Final Report Procedures.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck NLSL II Deputy Director (Project Management)
OFFICE OF SCIENCE 1 3. Cost Estimate Gines, Fisher 2.Are the estimated cost and proposed schedule ranges realistic, consistent with the technical and budgetary.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
Management & Development of Complex Projects Course Code MS Project Management Project Life Cycle & PM Process Groups Lecture # 4.
April 1, 2007 Global Design Effort 1 Materials for S4 meeting Discussion of risks in BDS WP April 1, 2007.
Monitor & Control Risks 1 MEC-4. What is Monitoring & Controlling Risks? 2 » Monitoring & Controlling Risks is the process of: implementing Risk Response.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
LBNE Working Group Meeting December 20, :00– 5:00 PM Snake Pit.
K. Y. LoEVLA Advisory Committee Meeting September 6-7, 2007 Charge to the Committee K. Y. Lo.
J.C. Sheppard, SLAC Americas Region September 27, ILC Positron TDR and R&D Collaboration Meeting 1: Oxford Introduction Discussion J. C. Sheppard.
OFFICE OF SCIENCE 1 Closeout Presentation and Final Report Procedures.
OFFICE OF SCIENCE 1 Closeout Presentation and Final Report Procedures.
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science Office of Science Review of the LCLS.
Design Report – Fall Semester. Title Page List name of project and team number List date List team members, advisor, sponsor Team logos.
Welcome and Presentation of Charge Steve Holmes Accelerator Advisory Committee ( May 10-12, 2005.
Mark Reichanadter LCLS October 9-11, 2007 LCLS BCR Overview and EIR LOIs Project Progress / Status Revised Project Baseline.
Monitor & Control Risks 1 MEC-4. What is Monitoring & Controlling Risks? 2 » Monitoring & Controlling Risks is the process of: implementing Risk Response.
OFFICE OF SCIENCE 1 Closeout Report on the DOE/SC CD-3b Review of the Utilities Upgrade Project (UUP) Fermi National Accelerator Laboratory August 11-12,
Preliminary Design Review (PDR) Advanced Energy Vehicle.
IAEA International Atomic Energy Agency Development of the Basis Document for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
OFFICE OF SCIENCE Closeout Report by the Review Committee for the LHC-CMS Detector Upgrade Project Fermi National Accelerator Laboratory August 27, 2013.
Large Facilities Manual New Guidance on Cost Estimating and Analysis 2016 NSF Large Facilities Workshop Kevin Porter Large Facilities Advisor, LFO, NSF.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
ACCSYS Design Reviews J. G. Weisend II Deputy Head of Accelerator Projects.
Executive Session Director’s Conceptual Design Review of Muon g-2 Project June 5-7, 2013 Jon Kotcher.
OFFICE OF SCIENCE DOE/SC CD-3c Review of the Muon to Electron Conversion Experiment (Mu2e) Project Fermi National Accelerator Laboratory June 14-16, 2016.
Director’s Progress Review Closeout Meeting
Preparation of the Self-Study and Documentation
Update on the Latest Developments in Government Auditing Standards
EIA approval process, Management plan and Monitoring
2K Cold Box PDR Introduction
How to Write MA proposal in Applied Linguistics
UK Link Technology Refresh
The DBD: Outline and Scope
2K CB FDR Overview:  Agenda, Charge, Review Process
BSA 376 Competitive Success/snaptutorial.com
BSA 376 Education for Service/snaptutorial.com
BSA 376 Teaching Effectively-- snaptutorial.com
ICP 7-th Regional Coordinators Meeting World Bank, Washington D.C.
Update on the Developments in Government Auditing Standards
Director’s Progress Review Closeout Meeting
JEFFERSON LAB LCLSII CRYOPLANT INSTALLATION PACKAGE DIRECTOR’S PROGRESS REVIEW Welcome and Introduction Stuart Henderson June 1, 2017.
Linac Ops Budget Structure & Approach WBS 1 – LCLS Mgmt & Admin
NERC Reliability Standards Development Plan
M. Scharfenstein - ES&H Coordinator 14 May 2009
INTERNAL AUDIT COMMUNICATIONS AND REPORTING ( %)
Loyola’s Performance Management Process For Employees
NERC Reliability Standards Development Plan
Project Management Issues John N. Galayda, SLAC April 24, 2002
Statewide Public Communications Services RFP#
Review of TDR Chapter 9 “Transition to Operations”
Preliminary Project Execution Plan
Charge and Agenda of the 18th TAC meeting
Presentation transcript:

LCLS Linac Technical Design Review Charge The purpose of the Linac TDR is to carry out an integrated examination and assessment of the technical design of the LCLS Linac System. In carrying out its charge, the committee should review and evaluate the scope of the Linac System, in consideration of the following: Do the performance specifications for the Linac provide an adequate basis for evaluation of the Linac design? Is the Linac preliminary design adequate , including any specifications, to meet the LCLS performance functions and requirements? Are all ES&H and technical requirements adequately addressed by the structures, systems and components incorporated into the Linac preliminary design? Is the preliminary design of the Linac defined to the extent that its basis can be used to set the baseline cost and schedule, including contingency? Is the Linac work scope organized logically such that its management team can successfully construct, install and commission its deliverables? Technical Review, December 11, 2003 Mark Reichanadter, SLAC

LCLS Linac Technical Design Review Charge We would like to get a short, concise report (2-3 pages) from the review team with a general assessment of technical maturity followed by recommendations/action items. The following format is proposed; Section I. General assessment of the overall Linac scope and design maturity based upon the previous questions. Section II. Bulleted sections Comments Cite any open design issues and/or missing components Cite any areas of risk and/or any suggestions for follow-up R&D Cite any potential conflicts with a shared use of the SLAC Accelerator and Controls. Recommendations and/or Action Items Cite any recommendations and/or action items that the committee feels should be addressed. Cite any overly optimistic expectations or assumptions which require further investigation. This report will be very helpful in preparing for a DOE Performance Baseline review in April 2004. We thank the committee in advance for taking time out of their busy schedules to provide this important feedback on the LCLS Linac design. Technical Review, December 11, 2003 Mark Reichanadter, SLAC