F Duval, on behalf of EN/EL

Slides:



Advertisements
Similar presentations
Graphic Symbol Location 1. DIN Terminal X52 The machine is powered by electricity using copper cable with 5 wires (3 phase wires + neutral wire +
Advertisements

Long shutdown 2013: Electrical distribution activities 09/03/2012 IEFC 2012 Workshop F. Duval on Behalf of EN/EL group.
1 1 Substation Asset Strategy Kevin Dasso, Senior Director Engineering and Operations IEEE/PES Annual Substations Committee Meeting April 7, 2008.
LHC UPS Systems and Configurations: Changes during the LS1 V. Chareyre / EN-EL LHC Beam Operation Committee 11 February 2014 EDMS No /02/2014.
Electrical Distribution: How to Ensure Safe Powering and High Availability for LHC Machine Protection Systems? V. Chareyre / EN-EL Machine Protection Panel.
Electrical & High Temperature Utility Distribution Upgrade.
D. Bozzini, EN-EL-HT, ATOP Days 2009, 4-6 March ELECTRICAL NETWORK: 18 KV NETWORK REVIEW AND STATUS OF THE SPS CONSOLIDATION PLAN D. Bozzini on.
17.March Connection to the CERN Power System of the TT2 mercury target project by Karsten KAHLE (TS-EL)
UPS network perturbations in SX2 Vincent Chareyre EN-EL-SN ALICE Technical Coordination Meeting 7 May 2010.
1 EL Consolidation IEFC Workshop F. Duval on behalf of EN/EL
112/09/2013. Summary  Events on the network  Incidents  Network reconfigurations  Network operation  Update on activities  Tests  Projects and.
Review of the Project for the Consolidation and Upgrade of the CERN Electrical Distribution System October 24-26, 2012 THE HIGH-VOLTAGE NETWORK OF CERN.
LAFA Food Distribution
A. Lisowiec 1, A. Nowakowski 1, Z. Kołodziejczyk 1, B. Miedziński 2 1 Centre For Tele-Information Systems and Hardware Applications, Tele and Radio Research.
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
Review of the Project for the Consolidation and Upgrade of the CERN Electrical Distribution System October 24-26, 2012 THE HIGH-VOLTAGE NETWORK OF CERN.
Maintenance and Accelerator Support RHIC StartUp10.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
Frankfurt (Germany), 6-9 June 2011  Manfred Wurm  EVN Netz GmbH, Austria Wurm – Austria – Session 3 – 0915 EARTH FAULT DISTANCE LOCALIZATION IN INDUCTIVE.
Friday morning Dump fill due to the trip of the RQF.A78  intervention had been just planned for the morning on the circuit Access, interventions:  RQF.A56/78,
Distribution network fault on LHC1 10/07/2011 F Duval, G Cumer on behalf of EN/EL 10/07/11.
Substation L1/ Booster Substation Y-BE2 Update #3 August 15,2012.
First results from the study of the LHC cycle power consumption FCC I&O meeting 24 th June 2015 Davide Bozzini With the contribution of G. Burdet, B. Mouche,
NERC Lessons Learned Summary LLs Published in September 2015.
Power Quality Karsten KAHLE Electric Power Converter Group (TE-EPC) High Power Converter Section Review of CERN’s Electrical Power Network October.
Static Var Compensator Status (SVCs for Booster and SPS) Situation in 2009 Karsten KAHLE, TE-EPC ATOP days March 2009.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
ABOC/ATC days Electrical Network: Selectivity and Protection Plan José Carlos GASCON TS–EL Group 22 January 2007.
On behalf on EN-EL October 1 st, 2015 YETS Works EN-EL [ CF excluded ]
2015 HURRICANE SEASON PREPARATIONS March 18, 2015.
Consolidation needs for the Electrical Distribution, Control Cables and Optical Fibres Equipment F. Duval.
EN-EL Activities for LS2 LIU, Consolidation, Maintenance, Operation Nicolas Bellegarde on behalf of EN-EL.
GCSE Science A Physics 1 Transmission of Electricity Learning Outcomes Understand the need for an electrical distribution system Describe the national.
CRICOS No J a university for the world real R Aging Equipment Replacement in Power Systems, Using Reliability and Cost Considerations By Dr. Ghavam.
Design a protection System of 220/33kV Grid Station United Arab Emirates University College of Engineering Saif Mohammed AL Aryani Ahmed Soruor.
POPS-B Project Update 07 June 2016 POPS-B: Project update and Feedback from POPS Experience LIU-PSB Meeting June 2016 Fulvio Boattini TE/EPC 2.
Magnet activities in SPS during EYETS
YETS & LS2 Works EN-EL / Power distribution
Situation of the Static Var Compensators at CERN.
Electricity is produced at the power station.
EYETS Works EN-EL [ FC excluded ]
Performance monitoring framework for the technical infrastructure
YETS & LS2 Works EN-El on LHC / Power distribution
TE-MSC activities in SPS during LS2
SINGLE LINE DIAGRAM.
EN 4946 – Refurbishment of Electrical Substations
the high-voltage network of CERN ToMORROW
Wednesday September 14th
LV Safe Powering from UPS to Clients
Renovation of the 45-year old PS magnets
the CERN Electrical network protection system
EN-CV interventions during EYETS for PS and PSB
YETS & LS2 Works EN-EL / Power distribution
TE-MSC activities in SPS during YETS
UPS Connectivity Options: PPDM ( )
Monday 11/07: Recovery Plenty of accesses.
Affordable iPad Repair Services in Dubai
 iOS update errors  Screen Repair  Apple keyboard Repair  Liquid Damage Repair  Battery Issues  Data Recovery.
Business opportunities related to CERN electrical network
Power cut 18kV cable for EMD404/E9 is heating
Electrical Glitch 06:02 Electrical glitch is seen on all circuits connected to the 18kV (RD1.LR1, RD1.LR5, RD34.LR3, RD34.LR7)
Friday :00 machine setup for luminosity run. Better b-to-b stability from injectors. 01:58 stable run with 228 bunches 11:00 luminosity leveling.
Review of Distribution Network Protection
F Duval, on behalf of EN/EL
Experimental Areas – LS2 planning
LHC Morning Meeting - G. Arduini
Friday 28 October 2011.
Major Event Fire on batteries of UPS ESS118/5CX
ILO Industrial Opportunities Days, 6-7 June 2019
Presentation transcript:

F Duval, on behalf of EN/EL Major Event on 12/01/2013 EL Report 8:30 meeting 14/01/2011 F Duval, on behalf of EN/EL January 14th 2013 F.Duval - 8.30 Meeting

network configuration events at 19:15:34 January 14th 2013 F.Duval - 8.30 Meeting

Detailed network configuration January 14th 2013 F.Duval - 8.30 Meeting

Substation BE9 cubicle EMD203 cables compartment January 14th 2013 F.Duval - 8.30 Meeting

Consequences UPS EBS21/76 & EBS21/88: power converter burnt, battery elements and batteries CB burnt Filters tripped (LHC 1, 2, 4, 6, 8) Many feeders tripped (mainly for power converters ) Recovery Network reconfigured at 23:00 (filters) Booster restarted at 21:30 SPS restarted at 01:00 (13/01/2013) without stable filter Both UPSs replaced and back on service at XX:XX LHC restarted at xx:XX January 14th 2013 F.Duval - 8.30 Meeting

Recordings on 18 kV BE9 19:15:34 January 14th 2013 F.Duval - 8.30 Meeting

Recordings on 18 kV LHC1 19:15:34 January 14th 2013 F.Duval - 8.30 Meeting

Recordings on 18 kV Meyrin 19:15:34 January 14th 2013 F.Duval - 8.30 Meeting

Follow up If the SPS can be operated, we will have the whole Ion run without stable filters (no further time lost). Otherwise 2 days circa needed for the repair works. a detailed analysis of the sequence of events is ongoing to detect eventual dysfunctions of other elements of the electrical distribution network. Taking into account the damaged UPSs; other equipment located on the same circuit could have been damaged as well; EL patrols  have checked the UPSs in the other locations. January 14th 2013 F.Duval - 8.30 Meeting