TGu Timeline Date: Authors: March 2006 March 2006

Slides:



Advertisements
Similar presentations
[ Interim Meetings 2006] Date: Authors: July 2005
Advertisements

TGu/TGv Joint Session Date: Authors: July 2005 July 2005
LB73 Noise and Location Categories
LB73 Noise and Location Categories
Waveform Generator Source Code
TGu Closing Report Date: Authors: November 2005
TGp Closing Report Date: Authors: July 2007 Month Year
[ Policies and Procedure Summary]
TGu Pre-Proposal Presentations
3GPP liaison report May 2006 May 2006 Date: Authors:
3GPP liaison report July 2006
TGu Closing Report Date: Authors: May 2006 May 2006
TGp Motions Date: Authors: November 2005 Month Year
Emergency Call Motion Date: Authors: January 2006
TGu-changes-from-d0-02-to-d0-03
TGu Motions Date: Authors: September 2006 September 2006
TGu Timeline Date: Authors: March 2006 March 2006
TGu Pre-Proposal Presentations
TGu Pre-Proposal Presentations
WNG SC Closing Report Date: Authors: November 2005
TGu Closing Report Date: Authors: July 2006 July 2006
Reflector Tutorial Date: Authors: July 2006 Month Year
TGv Redline D0.07 Insert and Deletion
TGu Timeline Date: Authors: January 2005 January 2005
TGv Redline D0.06 Insert and Deletion
TGu Motions Date: Authors: May 2007 May 2007
TGu Closing Report Date: Authors: September 2005
TGu Closing Report Date: Authors: March 2006 March 2006
TGu Timeline Date: Authors: July 2005 July 2005
TGu Closing Report Date: Authors: July 2005 July 2005
TGu Timeline Date: Authors: July 2006 July 2006
TGu Timeline Date: Authors: November 2006 November 2006
TGu-changes-from-d0-01-to-d0-02
TGu Timeline Date: Authors: May 2006 May 2006
LB73 Noise and Location Categories
TGu Motions Date: Authors: July 2006 July 2006
TGy draft 2.0 with changebars from draft 1.0
TGv Redline D0.10 Insert and Deletion
TGu Timeline Date: Authors: May 2006 May 2006
WNG Closing Report Date: Authors: January 2007 January 2007
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
Redline of draft P802.11w D2.2 Date: Authors:
Document Motions Date: Authors: November 2005 November 2005
TGu-changes-from-d0-02-to-d0-03
[ Policies and Procedure Summary]
3GPP2 Liaison Report Date: Authors: May 2006 May 2006
TGu Closing Report Date: Authors: March 2007 March 2007
TGu Motions Date: Authors: May 2006 May 2006
TGu Motions Date: Authors: November 2006 November 2006
TGu Closing Report Date: Authors: January 2006 January 2006
TGu liaisons Date: Authors: March 2006 March 2006
TGu Closing Report Date: Authors: May 2007 May 2007
TGu Timeline Date: Authors: May 2006 May 2006
Motion to go to Letter Ballot
TGu-changes-from-d0-04-to-d0-05
TGu Closing Report Date: Authors: March 2005 March 2005
TGu Closing Report Date: Authors: January 2005 January 2005
TGu-changes-from-d0-03-to-d0-04
TGu Timeline Date: Authors: January 2005 January 2005
TGu Motions Date: Authors: May 2006 May 2006
WNG SC Closing Report Date: Authors: November 2005
TGu Timeline Date: Authors: May 2005 May 2005
TGu Timeline Date: Authors: July 2005 July 2005
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
TGu Motions Date: Authors: September 2006 September 2006
TGu Timeline Date: Authors: July 2005 July 2005
TGu Closing Report Date: Authors: January 2005 January 2005
TGu Motions Date: Authors: March 2006 March 2006
WNG SC Closing Report Date: Authors: July 2006 July 2006
TGp Motions Date: Authors: January 2006 Month Year
Presentation transcript:

TGu Timeline Date: 2005-01-18 Authors: March 2006 March 2006 doc.: IEEE 802.11-05/0049r7 March 2006 TGu Timeline Date: 2005-01-18 Authors: Notice: This document has been prepared to assist IEEE 802.11. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.11. Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures <http:// ieee802.org/guides/bylaws/sb-bylaws.pdf>, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair <stuart.kerry@philips.com> as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE 802.11 Working Group. If you have questions, contact the IEEE Patent Committee Administrator at <patcom@ieee.org>. Stephen McCann, Siemens Roke Manor Stephen McCann, Siemens Roke Manor

Presentation of the proposed TGu Timeline. March 2006 doc.: IEEE 802.11-05/0049r7 March 2006 Abstract Presentation of the proposed TGu Timeline. Stephen McCann, Siemens Roke Manor Stephen McCann, Siemens Roke Manor

Project Timelines January 2005 March 2005 May 2005 doc.: IEEE 802.11-05/0049r7 March 2006 Project Timelines January 2005 Define scope and requirements Define set of external entities to liaise with. Compile liaison letter requesting requirements input. March 2005 Continue drafting supporting documents (scenarios and requirements) May 2005 Continue with supporting documents (scenarios and requirements) Technical presentations Stephen McCann, Siemens Roke Manor Stephen McCann, Siemens Roke Manor

Project Timelines July 2005 September 2005 Requirements Approval March 2006 doc.: IEEE 802.11-05/0049r7 March 2006 Project Timelines July 2005 Requirements Approval Liaisons Technical presentations September 2005 Finishing supporting documents Down selection procedure discussions Liaisons to external groups Call for informal proposals Stephen McCann, Siemens Roke Manor Stephen McCann, Siemens Roke Manor

Project Timelines November 2005 January 2006 March 2006 doc.: IEEE 802.11-05/0049r7 March 2006 Project Timelines November 2005 Informal proposal presentations Respond to incoming liaisons Call for proposals January 2006 Present informal proposals Stephen McCann, Siemens Roke Manor Stephen McCann, Siemens Roke Manor

Project Timelines March 2006: May/September 2006: November 2006 doc.: IEEE 802.11-05/0049r7 March 2006 Project Timelines March 2006: Present initial proposals functionally descriptive text within documents slide presentations Carry out steps 4 - 5 in the down selection procedure for all clusters Liaison responses May/September 2006: Present formal proposals Carry out steps 4 – 7 in the down selection procedure for all clusters November 2006 Letter Ballot?? Stephen McCann, Siemens Roke Manor Stephen McCann, Siemens Roke Manor

Project Timelines July 2006: September 2006: March 2006 doc.: IEEE 802.11-05/0049r7 March 2006 Project Timelines July 2006: Merging cluster text together liaisons September 2006: Single combined proposal Stephen McCann, Siemens Roke Manor Stephen McCann, Siemens Roke Manor