SWT 458/5 conversion project

Slides:



Advertisements
Similar presentations
Investigating people at work 7 - Training 1 Investigating people at work Lesson 7 Training.
Advertisements

Health & Safety Induction Health & Safety e-learning: Health & Safety Induction Course.
STC Houston March 11, 2014 Erika Frensley.  Technical Communication, even basic reference and user manuals, is often used as a marketing tool for your.
1 European Conference on Training Strategies Kieran Cox -NSAI Education & Promotion-
Evaluation of the SEND Pathfinder Programme: Early Findings Graham Thom and Meera Prabhakar May 2012.
1 Prosci ® Image Library. 2 Guidelines This library is not designed as a presentation, but rather a collection of available slides for potential use in.
Remote Control Parking (RCP)
Hosted Voice & Hosted Contact Center
Introducing Regulatory Impact Analysis into the Turkish Legal Framework Improving Transparency, Consultation and Communication of RIAs March 2009.
Mind the Gap – Human Factors and the Platform Train Interface
Planning the Learner Experience Linda Rolfe & Cerian Ayres Petroc.
Accelerator Tunnel Layout (G01) Nick Gazis Senior Mechanical Engineer Review of ESS Accelerator Conventional Facility Design.
Insert name of presentation on Master Slide Talking with Patients about Healthy Lifestyles: A Brief Advice Training Package 13 th November 2013 Vikki Wood,
Articulate the major security risks and legal compliance issues for a Fire and Rescue Service. Identify and justify technical controls for securing remote.
With. Project Overview  Introduction to Factory Automation Numerical Control  Build an autonomous robotic solution  Testing an autonomous robot build.
Working with clients with learning disabilities
Unit 4: Autonomous Robotics
Our story of quality development
VTS - Purpose VTS is being introduced to improve the safety of our staff by helping them to drive within the speed limit by providing a system that enables.
Healthy planet = higher profits HP’s approach to sustainability
Risk Tolerance Factor # 10 Role Models Accepting Risk
Contracting Officer Podcast Slides
Creating a culture of community engagement
Think Family pilot WNW CDTS Adam Smith.
Community Participation in Research
Safe Field Research …advice from EHS.
Chapter 18 Maintaining Information Systems
Building the foundations for innovation
Please read and then delete this slide
Business Improvement Working Group
Ulrich’s model of HR.
Plan & deliver learning activities under the direction of the teacher
Senior Management Leadership Programme Review and next steps
Delivering Improvements in Waste and Recycling Collection Services
Speaker’s Name, SAP Month 00, 2017
Preparing to Teach and Overview of Teaching Assignments
Business Drivers and Requirements
Increasing Asset Lifecycle through the application of Innovative Technology
ATO over ETCS Benoît BIENFAIT 10/2/2016.
A turbo charged engagement & culture change journey
Opportunities for Growth
EMPLOYERS’ GUIDE to the Learning Progressions
Customer Service Strategies
Contracts for Green Procurement
Sustained MRV capacity building in the Western Balkan and Turkey
Assessing Risk Impact Factors affecting the consequences Nature Scope
Yes, we need hundreds of methodologies!!!
Creating a culture of community engagement
Conversation Cards Sundt Construction.
Safety Management System Implementation
Our New Integrated Business Management System [“IMS”]
Leadership Behaviours Model
Developing a Research Impact Capture System
Change Assurance Update
Red and Orange Future Reliability
Enterprise Resource Planning (ERP) System
Joint inspections and co-operation in Scotland
Advanced Product Quality Planning 2nd Edition
ACT Evaluation Capability We’ve talked the talk
Lecture 06:Software Maintenance
Developing a Research Impact Capture System
Automating Profitable Growth™
Software Project Management
Acquired? Now What? Bill Decker Vice President & General Manager
Fertilizer Industry Safety Information Analysis and Sharing Program
North West Electrics Deployment of 20 cascaded class 319 Electric trains 6th February 2017 Rob Warnes.
ISO 9001:2008 – Key Changes NOTE: use of this webinar depends on the instructor/speaker using the text in the notes of the slides!! Examples and speaking.
Preparing to Teach and Overview of Teaching Assignments
Advanced Product Quality Planning 2nd Edition
Disseminating Vision & Values
Presentation transcript:

SWT 458/5 conversion project Andrew Fairbank, Head of On Train Service Mike Archer, Engineering Change Manager 6 February 2017

Purpose and overview of the project What was the project about for the business - more capacity Longer trains Longer platforms What was the project about for Operations? Driver/Guard training, consultation Change in guard’s operating position, 10 vice 8 Operating practice, change in operations What was the project about for Fleet? Complex technical challenge… MA What project was about – for the business (more capacity – longer trains, longer platforms); for engineering (complex technical) ; for ops (guard’s position, change in operating practice) Driver/Guard training Consultation 10 vice 8 Change in operations 

Purpose and overview of the project + = MA

Purpose and overview of the project MA Conversion of Class 460 cabs to Class 458 cabs Conversion of Class 460 luggage vans to passenger cars De-motor some cars and bogies New coupler & unit-end gangway Re-gear fleet to 75mph, revised gearbox and Agate Software change for speed and current limit change Revised Door Control ‘High Density’ interior layout giving more standee space & increased crush laden weight Removal of First Class 2 + 2 seating layout Replacement of Saloon Floors Automatic Selective Door Operation (ASDO) New Arrowvale On Train Data Recorder (OTMR)* R2P CCTV equipment (ex 460 only)* Revised Train Monitoring System (TMS)* *all with remote download functionality Class 460 mods to harmonise with Class 458: Sanding system Passenger counting Removal of some toilets Revised trim panels PRM/RVAR compliance

Joint working before Involvement of Company Council, Trades Unions Risk assessment process – joint Hazids and Hazops Fleet/Ops engagement at an early stage to minimise impact, avoid additional training requirements and safety risk Example on 707 project risk of novel GOP MA - Working together - Before Involvement of Company Council/Trades Unions Risk assessment process – joint Hazids and Hazops Ops land – fleet project, engagement at an early stage, more to do on this – good on major projects, less so on small projects. Good example on 707s, guards were involved and mitigated risk of novel GOP. Avoided training requirement and safety risk. Demonstrates importance of getting real feedback from traincrew (driver and guards) importance of translating into engineer’s speak, importance of engineers to understand operating environment, e.g. moving a button, or explaining why what appear like simple mods are actually very complex. Different languages. I think it would be good for all of the above to have examples of each in either 458/5 or other refurb projects

Joint working before Importance of getting real feedback from traincrew (drivers and guards), translating into engineer’s speak Engineers need to understand operating environment Potential technical complexity of seemingly simple mods – e.g. moving a button Operational importance of seemingly minor changes – e.g. [to add] MA - Working together - Before Involvement of Company Council/Trades Unions Risk assessment process – joint Hazids and Hazops Ops land – fleet project, engagement at an early stage, more to do on this – good on major projects, less so on small projects. Good example on 707s, guards were involved and mitigated risk of novel GOP. Avoided training requirement and safety risk. Demonstrates importance of getting real feedback from traincrew (driver and guards) importance of translating into engineer’s speak, importance of engineers to understand operating environment, e.g. moving a button, or explaining why what appear like simple mods are actually very complex. Different languages. I think it would be good for all of the above to have examples of each in either 458/5 or other refurb projects

Joint working during Porterbrook drivers Joined up approach to test running Releasing Guards to perform door operations while trial running Engineering team on board On board PIS test Dedicated Operations Standards resource Slide 4 - AF Working together - During Porterbrook drivers Test running – joined up approach to test running Slide 4 Before introducing the trains Dedicated Fleet testing Drivers Releasing Guards to perform door operations whilst trial running Engineering employees onboard Onboard PIS test IVT Dedicated Operations Standards resource Joint working during - Delete dedicated fleet testing drivers

Joint working after Train introduction – making sure that there was a project coordinator on the Operations side Rostering Traction knowledge Project resource IVT – Interactive Virtual Train Operations people seconded to the Fleet project to develop Done for 458/5 as significantly different to 458/0 fleet Doing for 707s Combined Fleet/Ops project team to deliver infrastructure change Station CCTV Stop marks   Slide 5 - AF Working together - After Train introduction – making sure that there is a project coordinator on Ops side, rostering, traction knowledge, project resource IVT – Ops people seconded to Fleet to develop, done for 458/5 (and also doing for 707s) Andy Lawford, Ops standards, seconded to the HLOS Fleet team (station, CCTV, stop marks), combined Fleet/Ops project team, deal with infrastructure Slide 5 During introduction Managing traincrew resource Involvement of Wessex Integrated Control Centre Customer and employee awareness Dedicated resource co-ordinator

Joint working after Involvement of Wessex Integrated Control Centre Customer and employee awareness station staff customers used to first class Customers and staff used to all doors opening Performance growth   Slide 5 - AF Working together - After Train introduction – making sure that there is a project coordinator on Ops side, rostering, traction knowledge, project resource IVT – Ops people seconded to Fleet to develop, done for 458/5 (and also doing for 707s) Andy Lawford, Ops standards, seconded to the HLOS Fleet team (station, CCTV, stop marks), combined Fleet/Ops project team, deal with infrastructure Slide 5 During introduction Managing traincrew resource Involvement of Wessex Integrated Control Centre Customer and employee awareness Dedicated resource co-ordinator Working together leading to performance growth Joint working after Delete dedicated resource co- ordinater Customer and employee awareness - station staff, customers used to first class and all doors opening

Customer Communications Interfaces Operation Standards Customer Communications Drivers Stations Project Team Training School Guards Safety Validation Slide 2 - MA Interfaces Engineering Ops – guards, stations, drivers External   Slide 6 Working together Operations & Fleet Key interfaces: Drivers Guards Operations Standards Stations Customer Communications Training School Safety Validation Train Presentation (if these could be bubbles on a slide I will talk through them) Train Presentation

Summary of key lessons learnt Recognise that most “Fleet” projects actually involve much of the business Involve the right people from across the business, and outside Early engagement Share expertise and information Common language Key driver customer satisfaction Slide 6 - AF Summary of key messages Recognise that most “Fleet” projects actually involve much more of the business Involve the right people from across the business and outside Early engagement Get the resource levels correct Share expertise and information Slide 7 Key messages as you suggest with: Key driver customer satisfaction