Decommissioning Scope and Practice Southern North Sea (SNS): Subsea

Slides:



Advertisements
Similar presentations
SEA & ETC Strategic Environmental Assessment and European Territorial Cooperation programmes Annual meeting with the Managing Authorities of the ETC programmes.
Advertisements

Environment case Episode 3 - CAATS II Final Dissemination Event Brussels, 13 & 14 Oct 2009 Hellen Foster, Jarlath Molloy NATS, Imperial College London.
HSE’s Ageing and Life Extension Key Programme (KP4) and Human Factors
SIEP HSE Management System
1. Session structure Overview Definition & examples Actions Outputs Challenges Exercises Module 4 Control measures & risk reassessment 2.
Regulations in the North Sea Keith Mayo, Head of Offshore Decommissioning, DECC, UK Date 1/2 October 2009.
By Collin Smith COBIT Introduction By Collin Smith
Research addressing Sanitation & the poor JN Bhagwan.
European Policy for Food Safety Research and Horizon 2020
Health and Safety Executive IChemE – Process Safety KPIs Workshop session Ian Travers Head of Chemical Industries Strategy Unit Hazardous Installations.
Codex Guidelines for the Application of HACCP
Mid Wales LTP Stakeholder Workshop 3 rd October Presentation by Ann Elias and Janice Hughes.
Logistics and supply chain strategy planning
LIAISON REPORT from CEN/TC 12 G. Trican, Samara, Nov
1 Mid-Term Review of the Hyogo Framework for Action Roadmap to Disaster Risk Reduction in the Americas & HFA Mid-Term Review.
UNDP Handbook for conducting technology needs assessments and Preliminary analysis of countries’ TNAs UNFCCC Seminar on the development and transfer on.
IMP Research and Technological Development Programs Oscar Valle Molina Federico Barranco Cicilia Mexican Petroleum Institute (IMP) ICRARD Meeting June.
1 Introducing Enterprise Risk Management (ERM) - The KOC Experience November 2012 Khaled Al-Awadhi Risk Management Team Kuwait Oil Company.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
DARM 2013: Assessment and decision making Mikko V. Pohjola, Nordem Oy, (THL)
Independent, integrated thinking.
“ Building Strong “ Delivering Integrated, Sustainable, Water Resources Solutions The Contemporary Language of Risk Analysis Campaign Goal 2a Risk Technology.
1 1 Presenter / date if required Independent, integrated thinking.
Introducing Design and Technologies. Victorian Curriculum F–10 Released in September 2015 as a central component of the Education State Provides a stable.
Offshore Europe September 8-11, 2015 ABS Group Offshore Drilling.
Public Consultation Session: Consultation and Transparency Requirements for Offshore Petroleum Activities Francesca Astolfi A/g General Manager, Offshore.
Ministry for Ecology, Energy, Sustainable Development and Sea in charge of Green Technologies and Climate Negotiations
Services Capabilities “A Different Approach” Neil Taylor.
TOOLS FOR MINING DEVELOPMENT POLICY AND IMPLEMENTATION
Strategic Information Systems Planning
Session 3 General RIA Training 6–8 July 2009 EuropeAid/125317/D/SER/TR
MONITORING Mr. Jan Prášek IPPC Agency.
Monitoring and Evaluation Systems for NARS Organisations in Papua New Guinea Day 3. Session 9. Periodic data collection methods.
People and Culture Office Safety, Health and Wellbeing
Integrated DECOM A specialist team to deliver Decommissioning Programmes.
Project Management and Monitoring & Evaluation
8 Managing Risk (Premium).
A Risk-based Approach to Training Paul Cheeseman & Kerry MacDonald
DARM 2013: Assessment and decision making
Impact assessment and decision making
GCF’s Environmental and Social Safeguards
Quality Risk Management
Petroleum Engineering
WHY GENETIC COUNSELING IS IMPORTANT
Project Charter START IT! By Catherine B. Calio, PMP
Cumulative Effects Assessment and Marine Spatial Planning
Introducing Design and Technologies
BACKGROUND 1987 Joint MSC/MEPC working group on:
Communication and Consultation with Interested Parties by the RB
Master SMS Test 4 14 Questions - A pass is required in each section below CLICK HERE TO START SMS TEST 4 Select only one answer– choose carefully.
Slaughden SMP Policy Review
Monitoring and compliance update
Project Management Training
Leading Practice Implementation Guide
National Television and Computer Recycling Scheme
Leading Practice Implementation Guide
Distribution Integrity
TITLE Business Case YOUR LOGO BUSINESS CASE PRESENTATION 00/00/0000
Civil Contractors Federation ‘2014 Earth Awards’ Submission Template CATEGORIES 1 and 2 ONLY Company Name (NOTE: if an Alliance then the name of the.
ECONOMICS IN THE WFD PROCESS
Statewide Public Communications Services RFP#
Performance Assurance Framework (‘PAF’):
THE WATER FRAMEWORK DIRECTIVE (WFD)
Dealing with confidential data Introductory course Trainer: Felix Ritchie CONTRACTOR IS ACTING UNDER A FRAMEWORK CONTRACT CONCLUDED WITH THE COMMISSION.
Assessment scales and aggregation
Preparatory meeting for the establishment of the Project Coordination Group (PCG) for the implementation of the MSFD 13 November :00-13:30 European.
Role of the Internal Verifier
Contingency Planning for Accidental Surface Water Pollution​ GROUP HSE RULE (CR-GR-HSE-705) EXECUTIVE SUMMARY This rule sets specific requirements to be.
Coriolis Meters for Chemical Injection
Presentation transcript:

Decommissioning Scope and Practice Southern North Sea (SNS): Subsea The following summarises the outputs of workshops held in Q3/Q4 2016, exploring the scope and practices of several SNS Operators with subsea aspects of decommissioning The workshops focussed on scope and practices covered by approved Decommissioning Programmes The scope and practices listed, and the drivers leading to their adoption, are examples of approaches taken This is not a comprehensive list of all options there may be other options which are superior to those listed these do not necessarily represent the best, or good, practice A fuller range of options will, in many cases emerge, as decommissioning experience develops and more Operators contribute to this body of knowledge Likewise, the most competitive options will likely become clear from the statistics of the options adopted by Operators in coming years. 18 September 2018

What are the targets to engineer the solution to? Execution Examples: Process description Screening / Ranking Situation/Issue Example Objectives Example Options Relative Cost Outcome Why is this activity being undertaken? A clear & justified objectives statement will align with cost-effective option selection What is the decommissioning starting point, and the issue ? Typically this is a fixed situation But it may also be a choice Selected option What are the costs of the options? Safety The options will screen differently when comparatively assessed, and a compliant yet cost-effective option can be selected What are the different ways that the objectives & associated metrics can be practicably achieved? Environmental Medium Lowest Technical Highest Low High Societal Metrics/Targets Low, but risk of high Economic What are the targets to engineer the solution to? Metrics should be challenged to test how unique/non-unique they are, & whether other acceptable metrics open-up more cost effective solutions Options objectively compared using the Comparative Assessment framework in line with BEIS-ODU guidance if required / proportionate

Execution Examples: Pipeline Decom Preparation Screening / Ranking Situation/Issue Example Objectives Example Options Relative Cost Outcome Oil/gas removal to remove hazard Oil Pipeline - Known contents Oil/gas removal to allow intervention Selected option Oil Pipeline - Unknown contents Reduce toxin entry into food chain What are the costs of the options? Pig + Water Flush + monitor/measure Safety Gas Pipeline - Known contents Minimise environmental impact Medium Lowest Environmental Pig + Water Flush Technical Gas Pipeline - Unknown contents Highest Water Flush Low High Societal Low, but risk of high Multiphase Pipeline Others Economic Injection-water pipe Metrics/Targets Chemicals flowline Hydrocarbons in water Defined methodology Options objectively compared using the Comparative Assessment framework in line with BEIS-ODU guidance if required / proportionate Reasonable endeavours

Execution Examples: Mattress Decommissioning Screening / Ranking Situation/Issue Example Objectives Example Options Relative Cost Outcome Minimise hazards to offshore personnel Minimise hazards to other users of the sea Selected option Mattress with High structural integrity Minimise hazards to the environment Total recovery of mattresses What are the costs of the options? Safety Environmental Mattress with Low structural integrity Partial recovery of mattresses Medium Lowest Technical Buried Mattress No recovery of mattresses Highest Low High Societal Unburied Mattress Rock dump over mattresses Low, but risk of high Economic Mixed Burial Mattress Metrics/Targets Minimise snagging hazard Options objectively compared using the Comparative Assessment framework in line with BEIS-ODU guidance if required / proportionate Risks are ALARP

Execution Examples: Pipeline Decommissioning Screening / Ranking Situation/Issue Example Objectives Example Options Relative Cost Outcome Minimise hazards to offshore personnel Large Diameter Pipeline ≥ 16” Minimise hazards to other users of the sea Small Diameter Pipeline < 16” Selected option Minimise hazards to the environment Total recovery of pipelines What are the costs of the options? Safety Buried Pipeline Partial recovery of pipelines Lowest Environmental Medium Unburied Pipeline Technical Highest Mixed Burial Pipeline No recovery of pipelines Low High Societal Rock dump over pipelines Flexible Pipeline Low, but risk of high Economic Rigid Pipeline Metrics/Targets Bundle Pipeline Minimise snagging hazard Umbilical Options objectively compared using the Comparative Assessment framework in line with BEIS-ODU guidance if required / proportionate Risks are ALARP

Execution Examples: Subsea Equipment Decommissioning Screening / Ranking Situation/Issue Example Objectives Example Options Relative Cost Outcome Minimise hazards to other users of the sea Minimise hazards to the environment Selected option Total recovery of subsea equipment What are the costs of the options? Safety Equipment without an over-trawlable structure Partial recovery of subsea equipment Environmental Medium Lowest Technical No recovery of subsea equipment Highest Low Equipment with an over-trawlable structure High Societal Low, but risk of high Rock dump over subsea equipment Economic Metrics/Targets Snagging hazards Options objectively compared using the Comparative Assessment framework in line with BEIS-ODU guidance if required / proportionate

Execution Examples: Post-Decommissioning Monitoring Screening / Ranking Situation/Issue Example Objectives Example Options Relative Cost Outcome Confirm there are no hazards to other users of the sea Confirm there are no hazards to the environment Selected option High Frequency Monitoring What are the costs of the options? Safety Environmental As left situation, post completion of decommissioning Medium Frequency Monitoring Medium Lowest Technical Highest Metrics/Targets Low Frequency Monitoring Low As left situation, post completion of previous surveys High Societal Low, but risk of high Economic Critical spans No Monitoring Exposures New snagging hazards Pipeline and mattress stability Options objectively compared using the Comparative Assessment framework in line with BEIS-ODU guidance if required / proportionate Identify any leaks