A proposal for a new RPC Barrel

Slides:



Advertisements
Similar presentations
OSU meeting, 04/24/2003 Richard Kass1 Limited Streamer Tube Project Overview Richard Kass Ohio State University Introduction (why, who, what….) The big.
Advertisements

Status Update on Mechanical Prototype in Rome November 6,
IFR-LST status report G. Cibinetto INFN Ferrara Babar Collaboration Meeting, Feb. 21, 2004 Milestones LST production status 1 st module assembled Princeton.
Status of the LHCb RPC detector Changes with respect to Note cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
Striplet option of Super Belle Silicon Vertex Detector Talk at Joint Super B factory workshop, Honolulu 20 April 2005 T.Tsuboyama.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
PHENIX RPC in China Li Ye Shouyang Hu Xiaomei LI China Institute of Atomic Energy
Muon Detector Jiawen ZHANG Introduction The Detector Choices Simulation The structure and detector design The Expected performance Schedule.
RPC detection rate capability ≈ 1/ρ Float-Glass ( Ω-cm) RPC rate capability < Bakelite( Ω-cm) one. New kind of doped glass was developed.
Barrel RPC Chamber consists of 2 double-gaps, each equipped with a common plane of 96 strips read-out by 6 front-end boards. The two double- gaps have.
TOP counter overview and issues K. Inami (Nagoya university) 2008/7/3-4 2 nd open meeting for proto-collaboration - Overview - Design - Performance - Prototype.
RPCs of BESIII Muon Identifier  BESIII and muon identifier  R&D  Mass production  Installation Zhang Qingmin Advisor: Zhang Jiawen.
Gap Production for Upscope of the Endcap RPCs Sung Keun Park Korea Detector Laboratory Korea University February 5, 2010 Workshop on the Forward CMS RPC.
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
Results from the CMS-RPC tests at CERN Gamma Irradiation Facility Roberto Guida CMS-RPC (Bari, Beijing, Napoli, Pavia, Sofia) Seoul, October 2005.
Proposal for LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002.
Peter Shanahan – Fermilab Neutrino Scattering Experiment meeting March 14, RPCs in a NuMI Environment Introduction to RPCs Principles of operation.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
Test results of Multi-gap RPC Test Chambers for a Digital HCAL  Geometrical design  Test setup  Signal: avalanche mode and streamer mode  Comparison.
M23 Inner Regions Upgrade with Triple-GEM detectors The EVLGG (Davide, Gianni & Ale) INFN Cagliari LNF Frascati INFN Roma.
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
Marcello Abbrescia RPCs for CMS during Phase II RPC rate capability M. Abbrescia, The dynamic behaviour of Resistive Plate Chambers, NIM A 533 (2004) 7–10.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
LSTs in the IFR gaps Workshop on IFR replacement SLAC November 14, 2002 L. Piemontese INFN Ferrara.
Performance and Aging Studies of BaBar RPC’s Henry R. Band University of Wisconsin for the BaBar IFR-RPC group RPC 2005 VIII Workshop.
Final results from an extensive aging test on bakelite Resistive Plate Chambers Stefano de Capua University of Rome II “Tor Vergata” and INFN.
1 Drift Tubes TC activities up to LS2 1.Implement remaining Phase 1 upgrades :  in USC ⁻ TwinMux ⁻ microROS 2.Refurbish HV & LV Power Supply Systems ⁻
RPCs with Ar-CO2 mix G. Aielli; R.Cardarelli; A. Zerbini For the ATLAS ROMA2 group.
R & D Status report on INO Naba K Mondal Tata Institute of Fundamental Research Tata Institute of Fundamental Research Mumbai, India.
June 2, 2008 Bill Wisniewski1 BaBar Disassembly and Disposal Overview.
Operation, performance and upgrade of the CMS Resistive Plate Chamber system at LHC Marcello Abbrescia Physics Department - University of Bari & INFN,
Straw man layout for ATLAS ID for SLHC
The ALICE-TOF system 1. Quick overview of the TOF system that we are building 2. The Multigap Resistive Plate Chamber -what is it? 3. Difference in.
SVT – SuperB Workshop – Annecy March 2010
Roberto Calabrese Ferrara University and INFN
University of Wisconsin
Introduction BaBar Components The Problem IFR Upgrade: 2004 & 2005
Results achieved so far to improve the RPC rate capability
Gas Detectors (GEM) The 6th Egyptian school for high energy physics
Production ad Quality control of RPCs for the CMS muon barrel system
An extensive aging study of bakelite RPC
Performance of timing-RPC prototypes with relativistic heavy ions
BaBar LST Upgrade Mark Convery SLAC 13 Jun 07.
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Sensitivity of Hybrid Resistive Plate Chambers to Low-Energy Neutrons
ATLAS-MUON Trigger hardware developments
Recent DHCAL Developments
Bill Wisniewski SuperB Frascati Meeting September 30, 2010
Transport Issues for EMC Barrel
Multigap Resistive Plate Chambers (MRPC)
Results from a preliminary analysis of the MWPC test at the GIF
IFR detector mechanics
BaBar Experience with RPCs: A snapshot of our present knowledge
Barrel RPC Conditions Database
To do list production organization and commitments
Status of the TOF Detector
BaBar IFR Upgrade Mark Convery SLAC 7 Jun 06.
Conceptual design of TOF and beam test results
Han Jifeng BESIII MUON GROUP IHEP, CAS
RPC and LST at High Luminosity
Francesco Forti SuperB Workshop LNF, March, 2006
Muon Detector Jiawen ZHANG 16 September 2002.
The digital read-out for the CSC system of the TOTEM experiment at LHC
11th Pisa meeting on advanced detectors
Resistive Plate Chambers performance with Cosmic Rays
University of Rome II “Tor Vergata”
Limited Streamer Tube Project Summary
SVT – SuperB Workshop – Frascati Sept. 2010
RPC approved plots.
Some of the Points Raised During my JLAB Visit
Presentation transcript:

A proposal for a new RPC Barrel BaBar Barrel Replacement Workshop Giancarlo Piredda INFN- Roma Slac Nov 14-15, 2002

RPC in the IFR barrel The evil we know. One basic question: Will they stand the rate and last long enough ? Construction technology and QC is, thanks to BaBar, under control. Cost (money and human resources) perfectly known. Make use of the experience made with FECap construction and installation Assess robustness from our own experience on the chambers installed in Nov. 2000 The necessary R&D for an optimization is completed (see D. Strom): double-gap modules working in streamer regime with a factor 4 less charge than in the actual chambers

Yes indeed, expertise exists. New FECap D.Lange/R.Contri

Barrel modules Singles rates for barrel RPCs show a linear dependence with the luminosity for values in the current range. The slope of the fitted straight line is higher for layers closer to the beam pipe; it gets essentially flat for outer layers, except for layer 18, where positive slopes are seen again. Sextant 0, Layer 1 Sextant 5, Layer 18 Sextant 1, Layer 10 E. Robutti

Barrel modules (cont’d)  pedestals from no-beam Maximum slopes per module (layer 1) are ~1 kHz/1033cm–2s–1. This projects to ~40 kHz/module at L = 4  1034 cm–2s–1, or 2 Hz/cm2. So, assuming no big non-uniformities, this should be no concern. E. Robutti

Experimental physics (observation) Barrel rates Forward End Cap has been running at ~1-20 Hz/cm2 for 1.5 years Even the disgraced layer17 (<6> Hz/cm2) is still 84% efficient No other counter show any significant inefficiency Further, FECap is strongly non uniform contrary to barrel in illumination After correcting for the ‘V-divider’ spacers/bakelite efficiency is unchanged in 1.5 year operation in forward

No efficiency loss in 1.5 years

Theoretical physics (explanation) We have a weak explanation to offer for: -decrease of resistance of the oiled spacers (actually maybe a hint: HF) -increase of resistivity of bakelite (drying chambers) It would be nice to have a theory but honestly we do not have one even if thanks to Jerry Va’vra we have several working hints to interpret the observations.

Worst Rates key observation: rate at 4*1034 in Barrel layer 1 are lower than rates At 5*1033 in layer 15/16 of FECap Jjv/BobM.

Total Integral Rates key observation: integrated charge rate by 2010 in Barrel layer 1 will be lower than what layer 15/16 of FECap have integrated to-date Jjv/BobM.

Barrel: strawman design (I) 10 planes of chambers and 8 layers of absorber -each layer is a double-gap 3-RPC modules -larger barrel plane ~375*320 -it amounts to (10*6*3*2)=360 gas/HV module -> (10*6)=60 electronic chambers (wrt new FECap 212/116) remove corner pieces The option of inserting chambers removing 0 or 1 corner piece exists however we feel that a double gap is sufficient guarantee against the need of a deinsertion. Since it makes the electronic life much easier this is the baseline.

Barrel: strawman design (II) -the electronics can either seat on board or be put in minicrates outside. In both options it will be accessible a coarse TDC will part of the project (10nsec resolution). FEC possibly redone. -In case of external minicrates the technique is known (see FWECap) (baseline option) -On board put the electronics on the region not covered by iron and use the fact that having double gap you only need to make one of the two shorter (no efficiency loss at first order)

Barrel- double gaps chamber built in Oregon with gaps from FECap production D.Strom

Barrel- double gaps Chamber fully efficient in case of one of the two gaps fails D.Strom

SF6 to reduce the charge First attempt even too succesfull, chamber fully efficient with a charge reduced by more than a factor 3. D.Strom

Barrel construction A possibility: -build gaps and make strip planes at GT -QC/QA in Roma -electronics by Ferrara -assembly chambers in US (Princeton ?, SLAC ?) -SLAC takes care of brass as for FECap -for tests, installation and commissioning we have the FECap as guideline (SLAC,Livermore, Wisconsin, UCRiverside, Yale, Princeton,PI, RM, FE, LNF, GE) Critical path: GT availability, US assembly place

Barrel cost (RPC only) Based on FECap construction, 432 gaps (12layers of doublegaps) 20% contingency added -RPC parts and gap construction : 250k$ -Strips panels: 84k$ -Signal Cables and Minirack: 70k$ -HV connectors 15k$ -Transports : 100k$ -Electronics: (see R.Calabrese) 140k$ ~660 k$ + Assembly (3techs*2years)+ brass + installation Scale with layer number

CMS ohmeter @ Panpla

What about General Tecnica? General Tecnica works under supervision of an INFN committee. U. Dosselli (chair of Commissione I) as chair and S. Morganti (BaBar) as responsible of production schedule. The possible production of gaps at GT has to be decided by this body. It should be possible but a tough discussion is expected. No way to start negotiations without a message that BaBar is considering this option not only as an exercise ! Alternatives will be discussed by Henry Band

Pro-Cons -Cost (the least of the three systems: <0.5M$ for the gaps) -Expertise existing -Minimal disruption to normal operation (the only realistic chance to replace something in 2004)-Avoid the IFR hybridization -Reuse of DAQ, SlowControl and core software -Profit from big effort of this summer (new HV distribution, new gas distribution) -Minimize manpower needed for construction, installation and commissioning -Detector construction subject to quality fluctuation of the material (mainly but not exclusively bakelite) -Operation in the streamer regime not fully understood

Credits (until Sept CM) more than 60 people! Ferrara (HV) M. Andreotti, V.Azzolini, D.Bettoni, R.Calabrese,A.Cecchi,G.Cibinetto, E.Luppi,R.Malaguti, M.Negrini,C.Padoan Frascati (GT teststand, remediation) L.Daniello, P.Patteri, M.Piccolo,M.Santoni Genova (DAQ,cosmic runs) R.Contri,M.LoVetere,S.Tosi, Livermore(SLAC teststand) M.Carpenter, D.Lange, D.Wright Napoli (trigger) D.Piccolo Oregon(teststand,EPICS) E. Fitzgerald, C.Potter, N. Sinev Padova(installation) E.Bolzan, O.Clementi,M.Negrello Pisa (RPC production and installation, FECs) C.Avanzini, M.Carpinelli, F.Forti, N.Neri, E.Paoloni, A.Profeti, D.Rizzi UC Riverside(gas) K.Wang Roma (RPC production and installation, FECs,remediation ) F.Bellini, A.Buccheri, G.C.,A.D’Orazio F.Ferrarotto,F.Ferroni, R.Lunadei, S.Morganti,G.Piredda, SLAC (Cabling, installation, RPC testing) G. Bradford, V. Coughran, M. Green, S. Jansson, S. Jones, J. Krebs, J. Krebs, G. Locke, W. Lovelace, R.Messner, R. Moore, C. Nix, G. Putallaz, H.Rogers, W. Wisniewski, S. Zalog Yale (Barrel FECs) M.Greene,H.Neal Wisconsin (Cabling, GMB, gas system) H.Band, P.Tan

Jerry Va’vra questions (I) Freon lower the oil resistance? -SF6 increases the HF production marginally (CMS) Does SF6 reduce the charge enough? -Reduction by a factor of 4-lifetime 4 time longer Low rho bakelite test - We agree, shipment under way. Will any result come in due time for the decision? We have the ALICE experience here.

JV questions (II) Bakelite resistance increase -Test humid air asap, once solved the technical problem of how to measure humidity Whiskers control -Detection ---single rates. Discard noisy chambers Shielding in the Forward Inner RPC -Thanks to JV & Bob Messner some additional shielding installed. Bob will be in charge for this item.

Committee Questions Efficiency drop vs charge Need to be clarified SF6 test Done (see D.Strom) Bakelite resistance -lower than before, accurate QC Gluing spacers to bakelite -oil-free looks impossible Fitting in 22mm -Done (see D.Strom) Replacement w/out removing corner blocks -Addressed Current Barrel -new HV, gas system upgraded Avalanche mode -see D. Strom FECs in double gap and TDC -not a concern Chambers production @ GT -adressed Anything in summer 2003 -to debate