COST PLANNING AND ESTIMATION

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

Managing the Health and Safety of Contractors
PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
CONTRACT A binding agreement between two or more parties for performing, or refraining from performing, some specified act(s) in exchange for lawful consideration.
Cash Flow Sewon Kim Kevin Tran Mary. Index Introduction Clients cash flow Contractors cash flow Cash flow forecasting Improving cash flow Example References.
CIC Scope of Services Frances Paterson & Tony Broomhead.
Estimating & Tendering. Estimating work involves dealing with Measurements and quantities Pricing and rates Subcontract packages Tender preparation.
NEC - Engineering and Construction Contract (ECC)
1 Opportunities Related to EPC Initiatives Support Services Management - NWC.
John Boon ZUT November Procurement Systems The organisation of the interaction between the purchaser of a new building and the suppliers of goods.
Copyright Course Technology Chapter 11: Project Procurement Management.
Bevan Brittan LLP- Highways Maintenance Contracts Nathan Bradberry, Senior Associate Johnathan Adams, Associate 6 November 2014.
Preparing Your Business Plan
Chapter 41 Chapter 10 Strategic Cost Management. 2 Definition Strategic Cost Management: Supply chain partners working together to identify design changes,
Rethinking Construction Review of traditional construction models and a comparison of product development processes with other industries School of Architecture.
Chapter 6 IT Cost Control Management of Computer System Performance.
EM15 – Contractors COST MANAGEMENT
Chapter 5 Initiating and Planning Systems Development Projects
Procurement Systems ARBE121 – PROCUREMENT OPTIONS “The organisational structure adopted by the client for the management of the design and construction.
1 RICS The Royal Institution of Chartered Surveyors London Quantity Surveying & Construction Faculty The Built Environment Group Corporate Professional.
Diploma in Procurement & Supply
Project Evaluation UNIT 2 Software Project Management.
Project risk and control. Tender risk Programme and method – Tightness of completion LAD’s Extent of change – Construction method Temporary works Change.
Free Powerpoint Templates Page 1 Free Powerpoint Templates How do we do it? Class 7.
Technical Manager; Bechtel Oil, Gas & Chemicals.
Construction Contracts and Project Delivery Methods
Risk Management in the Built Environment Management of Risk in Construction By Professor Simon Burtonshaw-Gunn – licensed under the Creative Commons Attribution.
Chapter 5 : Initiating and Planning Systems Development Projects.
Specification & Quantities Estimating
Budgets. Types of budget Organisational goals informed by the strategic plan and the organisations ability to meet its historic targets – Strategic Turnover.
Procurement Finished Equals Job Done? Alison Brown Strategic Housing Director.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Cash Flow Analysis Part 2 King Saud UniversityCE511- Construction Planning & Control 1.
Chapter 11: Project Procurement Management
Can you afford NOT to have a QS managing your construction budget?
NURHALIMA 1. Describe steps involved in the project initiation and planning process Explain the need for and the contents of a Statement of Work and Baseline.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
Development of a project. Initial concept  Market survey  Economic feasibility  Selection of process and site location  (For small plans issue enquiry)
CLC1501 Introduction to the PPP Procurement Approach – Principles of PPP Procurement.
Agency Management Lecture 7 1/7/2011Agency Management – Ruia – TYBMM 2010.
Module Code : AURH453 Management Principles Assessment Number 1 (a) Nature of Industry In the form of an illustrated written report Weighting : (part)
Marketing to Main Contractors Winning Work from a Main Contractor Paul Clarkson Iain Flatters Construction Director Group Procurment Manager.
English for Construction Engineering Management ,建筑工 程专业英语 赖小东 授课教师:赖小东 Cell# 江西财经大学旅游与城市管理学院工程管理系.
Construction Tender Process Tender steps between Client, Contractor and Subcontractor Dr A Kimmance.
Project Management – PTM712S
Introduction to Management Accounting
Chapter 5 Initiating and Planning Systems Development Projects
Roles and responsibilities PM
The Design Team Carl James.
Chapter 6 Initiating and Planning Systems Development Projects
Stage VI & VII: Construction and Completion & Formal Opening
Contractor’s Post-contract Cost Management Processes
LECTURE NOTE By DR. O. J. AKINYOMI
COST PLANNING AND ESTIMATION
COST PLANNING AND ESTIMATION
Project Development and Managing your Build Agenda
COST PLANNING AND ESTIMATION
COST PLANNING AND ESTIMATION
COST PLANNING AND ESTIMATION
Pre-contract Planning and Practice
Resource procurement.
Engineering Project Tendering.
Chapter 5 Initiating and Planning Systems Development Projects
Contractual Arrangement
Dennis Li - HKCIC Lecturer
Chapter 5 Initiating and Planning Systems Development Projects
Construction Contracts
FBE05 – Mathematics and Statistics
Chapter 6 Initiating and Planning Systems Development Projects
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

COST PLANNING AND ESTIMATION Wong Chear Ching

Course outline Overview of Cost Planning Cost Planning Techniques Approximate Estimating Elemental Method Cost Planning at Various Stages of Design Resource Analysis Cash Flow Valuation Final Accounts

Teaching Scheme DATE CHAPTER 1. Overview of Cost Planning 2. Cost Planning Techniques 3. Approximate Estimating 4. Elemental Method 5. Cost Planning at Various Stages of Design 6. Resource Analysis 7. Cash Flow 8. Valuation 9. Final Accounts Exam

6. Resource Analysis 6.1 Estimating and Tendering 6.2 Resource Analysis 6.3 Analogous Rates or Pro-Rata Rates 6.4 Introduction to Overheads and Profit

6.1 Estimating and Tendering Project Procurement Procurement is the acquisition of goods or services in line with a client’s requirements and main components are: Procurement route – this is the arrangement of roles, responsibilities, contractual relationships and the allocation of risk to meet the client’s requirements in terms of time, cost and quality Tendering – this is how the price for the works will be determined and agreed Contract selection – this is how we select the most suitable form of contract to meet the client’s requirements, taking in to account the procurement route and type of tendering

6.1 Estimating and Tendering Project Procurement

6.1 Estimating and Tendering Project Procurement A procurement route is defined by a range of criteria: Roles and responsibility of the parties involved with the project Contractual relationships of team members Allocation of risk amongst the team Impact on the project programme – overall length, certainty of end date Impact on cost – overall cost, cost certainty, cost control Impact on quality – control of design, construction quality Design flexibility – ability of client to implement change

6.1 Estimating and Tendering Tendering Tendering is the process of establishing a price for the works. This might be a lump sum, a target figure, or agreeing the basis on which the final account will be assessed (e.g. re-measurement, cost reimbursable). This is done either by asking one party to suggest a price in competition with others, or by negotiation. The tendering process covers consultants, suppliers, as well as contractors and subcontractors. Tendering is a part of the procurement process.

6.1 Estimating and Tendering Tendering Public procurement often with “Open Tender” with a Tender Notice published on GeBIZ. Private procurement often with “Selective Tender” with an Invitation Letter is sent to limited tenderers, selected based on their past completed projects or recommendation.

6.2 Resource Analysis Unit rate of a work is the cost to achieve the deliverables of one unit of that work. Example: Unit rate for concrete = $180/m3 Meaning the cost of 1m3 of concrete is $180 $180/m3 = Labour cost/m3 + Plant cost/m3 + Material cost/m3 + Profits for Contractor

6.2 Resource Analysis Build up all-in-rate All-in-rate = Labour cost + Plant cost + Material cost + Profits for Contractor How much for painting of 1m2 of wall? Labour cost: Takes 15mins to paint 1m2 of wall, charge $15/ hour $15/60mins x 15mins = $3.75/m2 Plant/machinery/tools/equipment cost: Bucket, brushes, masking tape @ $20 for 20m2 $20/20m2 = $1.00/m2 Material cost: 1 bucket of paint @ $20 can paint 36m2 $20/36m2 = $0.56/m2 SUB-TOTAL $5.31/m2 Add Profits for Contractor, assume 15% $5.31 x 15% = $ 0.80/m2 TOTAL ALL-IN-RATE $6.11/m2

6.2 Resource Analysis Build up all-in-rate Labour cost Salary, bonuses, allowances, CPF, cost of supervision, levy, insurance etc. Plant cost Rental/ initial capital sum, maintenance, fuel, consumable stores, operator etc. Material cost Discount, quality, quantity, wastage, different source of suppliers etc. Profits for Contractor Overhead, turnover, availability of resources, type of work etc.

6.2 Resource Analysis Factors affecting rate Type/ Method of construction Location Time Minimum quantity order Quality/ Workmanship Profits Market condition Error

6.3 Analogous Rates or Pro-Rata Rates

6.3 Analogous Rates or Pro-Rata Rates If 102.5mm thick common brickwork cost $35.10/m2, how much is it for 215mm thick? A quick estimated cost is $35.10 / 102.5 x 215 = $73.62/m2

6.4 Introduction to Overheads and Profit