International Equipment Reliability Working Group AP-913 Harmonisation sub-group Update from Prague meeting 4th-5th Apr 2017
Objective “Produce a harmonised (WANO) Equipment Reliability standard to be used globally outside of North America”
Achievements so far Survey of IERWG members re: what changes would we like in our WANO standard versus AP-913. Key themes are: Simpler and shorter than AP-913 More generic e.g. remove Maintenance Rule/MPSI. Include roles & responsibilities of each function and the interactions. Agreed and expanded sub-group – now have input from 11 member states (UK, Spain, China, Czech Republic, Slovenia, Finland, Bulgaria, Sweden, France, UAE and Korea) and WANO London Centre (see slide 4) Document Draft 3 now in production. Final set of comments on Draft 2 agreed with all sub-group members.
Sub-group members Kris Thomson (EDF Energy, UK) kris.thomson@edf-energy.com - Chair Alan Wattling (EDF Energy, UK) alan.wattling@edf-energy.com Manuel Ocon (CNAT, Trillo, Spain) mob@cnat.es Guo Xing Gang (Hongyanhe NPP, CGNPC, China) guoxingang@cgnpc.com.cn Jian Guang Liang (Fangchenggang NPP, CGNPC, China) jianguangliang@cgnpc.com.cn Lu Wen Yue (SNPI\CGN, China) luwenyue@cgnpc.com.cn Lubos Cvrcek (CEZ, Czech Republic) lubos.cvrcek@cez.cz Miroslav Pavlic (Slovenske Elektrirve, Slovenia) miroslav.pavlic@seas.com Petri Kytomaki (Loviisa NPP, Fortum, Finland) petri.kytomaki@fortum.com Plamen Naydenov (Kotlodny NPP, UPP, Bulgaria) pnnaydenov@upp.bg Lassi Hostikka (Loviisa NPP, Fortum, Finland) lassi.hostikka@fortum.com Esko Luukkonen (Loviisa NPP, Fortum, Finland) esko.luukkonen@fortum.com Alexander Lindqvist (Vattenfall, Sweden) Alexander.lindqvist@vattenfall.com Antoine Despujols (EDF, France) antoine.despujols@edf.fr Ibrahim Al Hammadi (NAWAH, UAE) ibrahim.banihammad@nawah.ae Sandor Nagy (WANO, London) sandor.nagy@wano.org Tae Young Ju (KHNP, Korea) sunshine@khnp.co.kr Emil Stefanov (Kozlodvy NPP, Bulgaria) emilstefanov@npp.bg Mohammed Yousuf (NAWAH, UAE) Mohammed.Yousuf@nawah.ae
Next steps Apr 17– May 17: Produce Draft 3 based on comments on Draft 2 agreed at Prague meeting. Kris Thomson, Alan Wattling, EDF-Energy Apr 17– May 17: Check for conflicts with new draft Component Classification document (via Graham Norman). Jun-Jul 17: Receive comments on Draft 3 from I-ERWG members. Aug 17: Address Draft 3 comments and issue document to I-ERWG for voting. Sep 17: Confirm vote result at Shanghai meeting and address any outstanding/new comments. Oct-Nov 17: Issue document on Nuclear Community site. Oct-Nov 17: Submit document for WANO Centre review and consideration for a new WANO GL.