Status Report on the Alignment Activities at SLAC

Slides:



Advertisements
Similar presentations
Research Instrumentation Special Interest Group Sensors & Instrumentation Knowledge Transfer Network Report on American Light Source Facilities Oliver.
Advertisements

Fast and Precise Beam Energy Measurement at the International Linear Collider Michele Viti.
PEP- II Linac Accelerator Systems Department The PEP-II B-Factory Accelerator John T. Seeman Assistant Director Particle and Particle-Astrophysics Division.
SLAC Accelerator Department Super-B-Factory John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department Caltech Meeting.
PEP-II B Factory Machine Status and Upgrades John T. Seeman for the PEP-II Staff SLAC DOE Site Review April 9, 2003.
April 6th 2009Olympus Meeting at DESY, F.Brinker1 Vacuum system Available beam scraper Beam dimensions, Target cell Machine Studies on February 7 th 2009.
October 20-21, 2005 Internal LCLS Undulator Alignment and Motion Review Catherine LeCocq, SLAC 1 Undulator Alignment Concept &
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
PEP-II Status and Outlook John T. Seeman For the PEP-II Team SLAC EPAC Meeting June 12, 2003.
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
SLAC Accelerator Department The PEP-II Accelerator Status and General Plans John T. Seeman Assistant Director of the Technical Division Head of the Accelerator.
1 Institute of High Energy Physics 13/09/2010 Comparison and Study in Measurement Accuracy of Height Difference between Laser Tracker and Level Men LingLing.
SLAC Accelerator Department PEP-II Future Plans and Parameters John T. Seeman PEP-II MAC Meeting December 13, 2004.
Accelerator Systems Division FACET Accelerator Overview John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
Future Very High Luminosity Options for PEP-II John T. Seeman For the PEP-II Team e+e- Factories Workshop October 13-16, 2003.
BEPCII Prealignment Installation Survey and Alignment Accelerator Center of IHEP Xiaolong Wang
July 7, 2008SLAC Annual Program ReviewPage 1 PEP-II in Run 7 and Transition Planning John T. Seeman Assistant Director PPA/LCLS.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
Tsukuba-hall webcam 1 Beam Pipe and Vertex Detector extraction: on Nov. 10, 2010 Belle Detector Roll-out: Dec. 9, 2010 End-caps, CDC, B-ACC, TOF extraction:
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
SABER, “maybe” a new facility in the South Arc (South Arc Beam Experimental Region) End Station A (ESA) in 2007 ILC Test Beams in 2008 Test Beams beyond.
First Collision of BEPCII C.H. Yu May 10, Methods of collision tuning Procedures and data analysis Luminosity and background Summary.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
August 4-5, 2004 PEP-II Post Run 4 Review 1 M. Sullivan PEP-II Post Run 4 Review August 4-5, 2004 IR Summary and Issues.
Comparing Luminosity Scans and Profile Monitor Results The size of the overlap of the two beams can be calculated from the individual beam sizes using:
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
September 2007SLAC IR WS Very Forward Instrumentation of the ILC Detector Wolfgang Lohmann, DESY Talks by M. Morse, W. Wierba, myself.
CESR as Light Source David Rubin for the CESR Operations Group Cornell University Laboratory for Elementary-Particle Physics.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
Introduction of Accelerators for Circular Colliders 高亮度 TAU-CHARM 工厂 & 先进光源, 2014/09.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
Synchrotron Radiation Absorption and Vacuum Issues in the IR at PEP-II and a Higgs Factory John Seeman, SLAC October 11, 2014 HF2014 Beijing.
PEP- II Linac Accelerator Systems Department Status and Plans for PEP-II John Seeman SLAC Particle and Particle-Astrophysics DOE HEPAP P5 Review April.
November 12-13, 2007 Super-B Factory: Accelerator Costing, PEP-II Hardware and Schedule J. Seeman SLAC International Review Committee meeting November.
M Sullivan SuperB Workshop Elba, Italy May 31 - Jun 3, 2008
PETRA III, Status and Upgrade
Workshop on Tau-Charm at High Luminosity
The Interaction Region
John T. Seeman DOE PEP-II Operations Review April 26, 2006
SuperB Injection, RF stations, Vibration and Operations
Large Booster and Collider Ring
Coupling Correction at the Australian Synchrotron
Beam-Based Feedback in LCLS-II
Status of ATF/ATF2 and machine schedule in this fall
The SPEAR3 Upgrade Project at SLAC
The PEP-II Interaction e+e- Factories Workshop
The SPEAR3 Upgrade Project at SLAC
Top-Up Injection for PEP-II and Applications to a Higgs Factory
The Storage Ring Control Network of NSLS-II
Status Report on the Alignment Activities at SLAC
CEPC-SppC Accelerator CDR Copmpletion at the end of 2017
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
Overview of SRF system of Ring and Linac (1)
SPEAR Summer/Fall Downtime Alignment Schedule
PEP-II Status and Plans e+e- Factories Workshop
CSP Meeting CERN CERN Accelerators in th November 2010
Status Report on the Alignment Activities at SLAC
LHC (SSC) Byung Yunn CASA.
Interaction Region Design Options e+e- Factories Workshop
The Proposed Conversion of CESR to an ILC Damping Ring Test Facility
Accelerator R&D Results from the B-factory
J. Seeman Assistant Director for PPA/LCLS
FACET Accelerator Overview
Summary of Washington DOE Review
FACET Accelerator Overview
Super-B Accelerator Overview
M. E. Biagini, LNF-INFN SuperB IRC Meeting Frascati, Nov , 2007
Proposal for a CESR Damping Ring Test Facility
Undulator Alignment Plan
Presentation transcript:

Status Report on the Alignment Activities at SLAC Catherine Le Cocq, Brian Fuss, Robert Ruland Stanford Linear Accelerator Center, Stanford, CA, USA The Stanford Linear Accelerator Center is operated by Stanford University for the U.S. Department of Energy.

Stanford Linear Accelerator Center 10-04-04 SLAC Activities Report

SLAC Activities Report 10-04-04 SLAC Activities Report

SLAC Activities Report SLAC/SSRL Site PEPII LER 3.1 GeV PEPII HER 9 GeV NDR 1.15 GeV SPEAR BaBar LCLS PEP II HEB Positron Return Line ESA FFTB PEP II LEB NLCTA BSY ESB SDR 1.15 GeV SLC Arc Not to scale! 10-04-04 SLAC Activities Report

SLAC Activities Report 10-04-04 SLAC Activities Report

SLAC Activities Report 10-04-04 SLAC Activities Report

SLAC Activities Report Ready mid November 2003 First light to beamline March 2004 Energy: 3GeV Current: 100 mA designed for 500 mA Emittance: 18nm-rad 10-04-04 SLAC Activities Report

SLAC Activities Report Peak luminosity: 9.21033/cm2/s. I + current: 2450 mA (3 RF stations) I – current: 1550 mA (8 RF stations) Daily integration record: 710 pb-1 2003-2004 run: over 100 fb-1 Total integration since May 1999: 240 fb-1 10-04-04 SLAC Activities Report

Summer 2004 PEPII Improvements IR2 south forward shield wall: Backgrounds Add another new LER RF station: Higher current Add a HER RF station by splitting up a current 4 cavity station into two 2 cavity stations: Higher current Two new “Frascati” longitudinal kickers in LER: More stability New electrodes for transverse kickers: More stability Add fans to all HER bellows: Cool Higher Order Modes Alignment work (quadrupole rolls): Smaller vertical emittance New LER synchrotron light monitor: Smaller vertical emittance IR NEG pump HOM reduction: Better lifetime and backgrounds New Support Tube Chiller: Higher currents Extract from John T. Seeman’s talk at SLUO Meeting, July 6, 2004 10-04-04 SLAC Activities Report

SLAC Activities Report PEP II Ring LER (e+) 50 sextupoles with 7 TBs 316 quadrupoles need fixtures (some in straights with 4 TBs) HER (e-) 104 sextupoles just laminations 290 quadrupoless with 6 TBs The B-Factory aims to study the CP violation from the collisions between circulating electrons (maximum 12 GeV) and positions (maximum 4 GeV) up to a maximum stored current of 3 A (1.4x1014 e- or e+). The B-Factory uses the existing SLAC 2-mile-long LINAC (divided into 30 sectors) to provide the electron and positron beams at proper energies. The electron beam is directed to the high-energy (HE) bypass line through the HE extraction line at sector 10 (positrons to low-energy bypass line at sector 4). Further downstream in the Beam Switch Yard (BSY) area, the high-energy north injection transport line (HENIT) takes the electron beam into the high-energy storage ring (HER), while the low-energy south injection transport line (LESIT) takes the positron beam into the low energy storage ring (LER). LER is positioned about 1 m on top of HER in an underground tunnel of 2200-m-circumference (called the PEP-II ring). The two stored beams circulate in opposite directions and and intersect only at the center of the large BaBar detector located at the Interaction Region 2 (IR2). 10-04-04 SLAC Activities Report

SLAC Activities Report 10-04-04 SLAC Activities Report

SLAC Activities Report 10-04-04 SLAC Activities Report

SLAC Activities Report IR2 BaBar Detector Area: 19 monuments. 4 magnets (Q4 & Q5 on both sides) A side: 8 monuments. 12 magnets (1 HER, 11 LER) B side: 17 monuments. 25 magnets (4 HER, 21 LER) 10-04-04 SLAC Activities Report

SLAC Activities Report 10-04-04 SLAC Activities Report

SLAC Activities Report QU4 QU5 B-side 2004: top and bottom sextants only Remove 18 layers of RPCs Install 6 layers of 7/8” thick brass absorber in layers 5,7,9,11,13 & 15 – 11.5 tons/sextant Install LST detectors in layers 1,2,3,4,6,8,10,12,14,16,17 & 18 10-04-04 SLAC Activities Report

SLAC Activities Report G H I J K A B C D E F QU4 QU5 BH2BQU4E BL2BQU4D BL2BQU4A BH2BQU4B The TC2002 and the level observations were combined in a similar fashion as in the initial survey. In particular, the a-priori standard deviations were identical: 100 μm for distances, 50 μm for height differences, 50 μm over the distance in meters for horizontal angles, 70 μm over the distance in meters for vertical distances. 10-04-04 SLAC Activities Report

SLAC Activities Report Scribe lines 10-04-04 SLAC Activities Report

SLAC Activities Report First x-ray free electron laser $315 million project 2006: Scheduled start of construction 2009: Scheduled start of operations 10-04-04 SLAC Activities Report

SLAC Activities Report 10-04-04 SLAC Activities Report

SLAC Activities Report LCLS Injector Area 10-04-04 SLAC Activities Report

SLAC Activities Report High-energy gamma-ray observatory 2006: Scheduled launch Main instrument: LAT composed of: Precision Tracker Calorimeter Data Acquisition System Anticoincidence Detector 10-04-04 SLAC Activities Report

SLAC Activities Report 10-04-04 SLAC Activities Report

GLAST Flight Grid and Tracker Towers 10-04-04 SLAC Activities Report

SLAC Activities Report 10-04-04 SLAC Activities Report

SLAC Activities Report M40 Base Station Position Accuracy: ±0.5 mm; ±2.0 mm Velocity Accuracy: ±1.3 mm/a; ±5.5 mm/a 10-04-04 SLAC Activities Report

Other Special Projects New instrument acquisition: Leica TCRA1105 Trimble DiNi 12 Leica DNA03 Z+F Imager 5003 Instrument studies: FARO arms Applied Geomechanics and Leica Nivel tiltmeters HLS sensors Wire offsets New data collectors: Allegro CE and CX Software 10-04-04 SLAC Activities Report

SLAC Activities Report In House Software Network Analysis: LEGO No changes Interface Tool: LEGOServer MATLAB connection Visualization Tool: SIMS Wire offsets Management Tool: WinGEONET Data capture for Leica DNA03 Moving from Visual Studio 6 to .NET 10-04-04 SLAC Activities Report

Software Architecture LEGOServer including LEGO DataHandler IProject IDataConnection DataItem IDataItem Environment supporting COM interfaces such as MATLAB LEGOServer Thread Calculate() SimsDocument SimsViews Error Ellipse alloc() Sta()… Tar()… AllDir()… AllDist()… AllDifH()… LegoL2() . . Result() 10-04-04 SLAC Activities Report

3D Error Ellipsoid with MATLAB Graphics 10-04-04 SLAC Activities Report

SLAC Activities Report Immediate Future PEPII / BaBar Summer/Fall downtime LCLS related studies GLAST surveys Laser Scanner Software upgrades Preparation for 2005 6-month shutdown 10-04-04 SLAC Activities Report

SLAC Activities Report Future SLAC Program Presented by SLAC Director Jonathan Dorfan at the 08/25/04 All Hands Meeting The Enriched Xenon Observatory is a project in particle physics aiming to detect "neutrino-less double-beta decay" using large amounts of xenon isotopically enriched in the isotope 136. Simply stated the goals of the project are: Measure effective Majorana neutrino masses with a sensitivity close to 0.01 eV Probe the Majorana nature of neutrinos. We are planning to identify the final state of the decay, a barium atom, using high resolution, single atom spectroscopy. The collaboration already has 200kg of Xenon enriched to 80% in the isotope 136 that will be employed in a prototype to be installed at WIPP. The project involves scientists from University of Alabama, Caltech, ITEP (Moscow), University of Neuchatel, SLAC, Stanford, Colorado State University, Laurentian University, UC Irvine, and Carleton University. 10-04-04 SLAC Activities Report