Designation of OSC/CSS

Slides:



Advertisements
Similar presentations
Price List Utilities.
Advertisements

WMD Crime Scene Management
Setting up the Observation…
TVET DISABILITY APPLICATION & SUPPORT PROCESS TVET DISABILITY APPLICATION & SUPPORT PROCESS.
SITREP.
CANADIAN COAST GUARD AUXILIARY - PACIFIC MEDICAL EVACUATION BY HELICOPTER CANADIAN COAST GUARD AUXILIARY - PACIFIC January 2012.
Emergencies. Recap Aircraft Maintenance Ground Handling Prep for Flight General Flying Aero’s & Formation flying Emergency procedures.
ACCSEAS Test Bed Solution: Vessel Operations Co- ordination Tool (VOCT) David Andersen Camre Danish Maritime Authority, ACCSEAS Project.
SAR Co-operations Plans Prepared by: Jerry McMillan Passenger Vessel Safety Specialist MSO San Juan, Puerto Rico
CIVIL AIR SEARCH AND RESCUE ASSOCIATION
Permit to Work Procedure Document Number: KOC.SA.004
Care Planning in RiO This presentation will take you through the process of adding a care plan to RiO, editing it and using the CPA functions.
Primary Care Emergency Planning A tool kit to assist General Practices in preparing a Service Continuity Plan.
Amver Maritime Relations A Partnership For Saving Lives Gov 2.0 Expo Showcase Washington, DC September 8, 2009.
Human Resources Caitlin Janetzko & Alice Viebey. Job Search Job Alerts ◦ Many websites will allow you to sign up for alerts Networking (it is still about.
Communications Committee October 31 st Promotional Literature: On very short notice I produced with Bill Moses and Cisneros a well-designed information.
Evidence Preservation and Sampling
USCG Amver System A tool for search and rescue in the Arctic March 2009.
1 Cospas-Sarsat’s International Beacon Registration Database (IBRD)
SAR SYSTEM. Objectives u DEFINE Search and Rescue u IDENTIFY the duties and responsibilities of the SC, SMC, OSC and SRU u IDENTIFY the five SAR Stages.
CANADIAN COAST GUARD AUXILIARY - PACIFIC COORDINATION OF MULTIPLE SURFACE UNITS CANADIAN COAST GUARD AUXILIARY - PACIFIC February 2012.
MEDEVAC OS3 RACHEL CHRISTENSEN. Overview To discuss procedures and operations we as radio watch standers should carry out when a Medical Emergency needing.
EVOLUTION OF A COMMERCIAL PRODUCT FIVE MAIN STAGES 1.DESIGN BRIEF 2.DESIGN SPECIFICATION 3.GENERATION OF DESIGN IDEAS 4.SYNTHESIS 5.PROTOTYPE.
PROTECTIVE ACTIONS AND REENTRY. Protective Actions Promptly and effectively implemented or recommended for implementation to minimize the consequences.
1 Incursion Response System (IRS) Logistics. IRS Logistics 2 What will you learn? During this session we will cover: How to enter and maintain staff details.
Leadership Training Unit 5: Conducting the Walk. 2  The week prior to the Walk:  On the Day of the Walk:  At the Start of the Walk:  During the Walk:
Leaf Characteristics. 1. Name leaf margin. 2. Give venation pattern.
Working Hours Utilities. An easy to use tool that helps maintain your company resources (setup working hours for users, update when facilities and equipment.
Functions of the Global System 1. Alerting Distress alerting is the rapid and successful reporting of a distress incident to a unit which can provide or.
Observation Training. Learning Objectives: 1.Review the elements of the observation process including: scheduling, pre-observation preparation, post-observation.
On-Scene Coordinator “Eyes & Ears” on scene! The “Eyes & Ears” on scene!
CANADIAN COAST GUARD AUXILIARY - PACIFIC MEDICAL EVACUATION BY HELICOPTER CANADIAN COAST GUARD AUXILIARY - PACIFIC 2011.
Annex 2 – Rules of the Air Annex 2 – Rules of the Air Annex 3 – Meteorological Services Annex 3 – Meteorological Services Annex 6 – Operation of aircraft.
PMIS Introduction to Sunflower Release 2.9 New Features And Custom Enhancements Training Presentation US Department of Health and Human Services.
SAR/A SSISTANCE AT S EA L EGAL W ORKSHOP : S CENARIOS.
First Aid & Survival Skills
What is the CELDT? California English Language Development Test PURPOSE: to identify students who are English Learners to identify students who are English.
Search and Rescue Team Status Nineteen members 6 SAR Tech Certified – 8 in Process 4 Call outs in 6 weeks  Member response 1 – 6 team members Monthly.
ALERTING SERVICE Alerting service2 OBJECTIVE At the end of this topic, students will be able to explain the need for, the methods and the key.
Scenario: A normal patrol? “Time to go home!! But….. it’s not over until it’s all over!!!”
Emergencies.
RCC HAIFA.
Module: Identify Options & Contingencies
’Incident Commander Pro’
U.S. RCC-SARSAT CONFERENCE 23 – 25 February 2010
Class Name, Instructor Name
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
COMMUNICATION.
Chapter 9 Employment Process.
Exam Accommodations Guide for using the Exam Access module within myAccess to request accommodated exams with the Disability Center.
TPP Standard PCS Requirements
Site Security and Rescue Operations Theory
SHORE FACILITIES The regulation IV/5 of SOLAS requires each Contracting Government undertakes to make available, as it deems practical and necessary, either.
Cospas-Sarsat’s International Beacon Registration Database (IBRD)
فرایند تسهیلگری در مددکاری جامعه ای
1 Zoe Van Hoover 1 User Safety: Commissioning and Early Experiments NEH ARR User Safety: LCLS NEH Commissioning and Early Experiments.
The impact of a tectonic hazard can also be seen to vary over time in the short term. When a hazard event strikes it disrupts economic and social life.
Myths in Disaster Planning
Expanding Square Search Pattern
Basic Concept of the GMDSS
Chapter 14 Decision Making and Control
U.S. RCC-SARSAT CONFERENCE 23 – 25 February 2010
The whole is… DICE PATTERN PART-WHOLE EARLY NUMBER SENSE.
U.S. RCC-SARSAT CONFERENCE February 2011
FERPA Family Educational Rights and Privacy Act OF 1974
Compliance Agreement for English Language Learners
Modified at -
Types of Errors And Error Analysis.
For More Details:
New features in Moodle From 3.4 to 3.6.
Presentation transcript:

Designation of OSC/CSS The appropriate RCC will normally designate one of the rescue unit as OSC/CSS as early as practicable and preferably before arrival at the scene. If it is not practicable, a merchant vessel should be designated as OSC/CSS. If it is not practicable, units involved should designate an OSC/CSS by mutual agreement and inform RCC.

Responsibilities of the OSC/CSS when not performed by the RCC determine the position, margin of error and search area; make arrangements of units; designate search patterns; designate units to effect rescue when object is located; coordinate on-scene SAR communications.

Additional responsibilities of an OSC/CSS: carry out the plan; modify the plan; make periodic reports; maintain detailed record of the operation; advise RCC to release units when no longer required; report to the RCC information on survivors.