Geneve The Alps Where is CERN? Jura Mountains Lake Geneva 18-Sep-18

Slides:



Advertisements
Similar presentations
CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
Advertisements

USCMS/Rochester. Oct 20, 2001HCAL TriDAS1 HCAL TPG and Readout CMS HCal meeting at Rochester Oct Oct 2001 Tullio Grassi, Drew Baden University of.
CMS/HCAL/TriDas. Sept, 2003 HCAL TriDAS 1 Tridas Status Drew Baden University of Maryland September 2003.
CMS ESR. May, 2004 HCAL TriDAS 1 HCAL TPG Status Tullio Grassi University of Maryland May 2004.
06-Dec-2004 HCAL TriDAS 1 TriDAS Status HCAL Group.
CMS/CERN. Nov, 2001HCAL TriDAS1 HCAL Fiber Link Issues Use of CMS Tracker Fiber Links Drew Baden University of Maryland John Elias Fermilab.
UMD Jan Overview Fanout Card (in GLOBAL mode) Fanout Card (in CRATE mode) Fanout Card (in CRATE mode) Fanout Card (in CRATE mode) Unique board for.
CMS/HCAL/TriDas. Dec, 2003 HCAL TriDAS 1 Clocking Drew Baden University of Maryland December 2003.
HCAL/TriDas. November, 2003 HCAL TriDAS 1 Tridas Status Drew Baden University of Maryland November 2003.
06-Dec-2004 HCAL TriDAS 1 TriDAS Status HF Luminosity HF Trigger Slicing.
CMS/HCAL/TriDas. Mar, 2004 HCAL TriDAS 1 Tridas Status Drew Baden University of Maryland June 2004.
Ionization Profile Monitor Front End (IFE) System Presenter: Kwame Bowie PPD/EED Phone: (630)
Drew Baden, UMD Nov HCAL Trigger/Readout Texas Tech Meeting February 2001 Drew Baden, Tullio Grassi University of Maryland.
UMD DOE Review - 30-Aug-05 Drew Baden1 CMS Trigger Elecctronics CMS HCAL TriDAS is a joint effort between: –University of Maryland – Drew Baden –Boston.
CMS/HCAL/TriDas. Mar, 2004 HCAL TriDAS 1 Tridas Status Drew Baden University of Maryland March 2004.
CMS/CERN. Nov, 2001HCAL TriDAS1 HCAL TPG and Readout CMS HCAL Readout Status CERN Tullio Grassi, Drew Baden University of Maryland Jim Rohlf Boston University.
Drew Baden, UMD Nov HCAL Trigger/Readout CMS/Tridas November 2000 Drew Baden, Tullio Grassi University of Maryland.
HCAL FIT 2002 HCAL Data Concentrator Status Report Gueorgui Antchev, Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
21-Jun-2005 HCAL TriDAS 1 HCAL TriDAS Status Drew Baden, University of Maryland For the HCAL Group: Boston University Fermilab Princeton University University.
CMS Electronics Week November Electronics Issues Drew Baden University of Maryland USCMS HCAL.
CMS/HCAL/TriDas. Dec, 2003 HCAL TriDAS 1 Tridas Status Drew Baden University of Maryland December 2003 What’s new since September 2003…
Trigger Supervisor (TS) J. William Gu Data Acquisition Group 1.TS position in the system 2.First prototype TS 3.TS functions 4.TS test status.
U N C L A S S I F I E D FVTX Detector Readout Concept S. Butsyk For LANL P-25 group.
PHENIX upgrade DAQ Status/ HBD FEM experience (so far) The thoughts on the PHENIX DAQ upgrade –Slow download HBD test experience so far –GTM –FEM readout.
CERN Real Time conference, Montreal May 18 – 23, 2003 Richard Jacobsson 1 Driving the LHCb Front-End Readout TFC Team: Arek Chlopik, IPJ, Poland Zbigniew.
Gueorgui ANTCHEVPrague 3-7 September The TOTEM Front End Driver, its Components and Applications in the TOTEM Experiment G. Antchev a, b, P. Aspell.
1 VeLo L1 Read Out Guido Haefeli VeLo Comprehensive Review 27/28 January 2003.
Rome 4 Sep 04. Status of the Readout Electronics for the HMPID ALICE Jose C. DA SILVA ALICE.
28/03/2003Julie PRAST, LAPP CNRS, FRANCE 1 The ATLAS Liquid Argon Calorimeters ReadOut Drivers A 600 MHz TMS320C6414 DSPs based design.
Kavita Lalwani, Pooja Saxena, Kirti Ranjan, Ashutosh Bhardwaj Department of Physics & Astrophysics University of Delhi Manoj Sharan High Energy Nuclear.
NUMI Off Axis NUMI Off Axis Workshop Workshop Argonne Meeting Electronics for RPCs Gary Drake, Charlie Nelson Apr. 25, 2003 p. 1.
LHCb front-end electronics and its interface to the DAQ.
13-Feb-2004 HCAL TriDAS 1 HCAL Tridas SLHC Drew Baden University of Maryland February 2004.
Electronic System Design GroupInstrumentation DepartmentRob Halsall et al.Rutherford Appleton Laboratory30 July 2001 CMS Tracker FED CMS Tracker System.
ATLAS SCT/Pixel TIM FDR/PRR28 June 2004 TIM Requirements - John Lane1 ATLAS SCT/Pixel TIM FDR/PRR 28 June 2004 Physics & Astronomy HEP Electronics John.
Possible SLHC Modifications to Clock Distribution Chris Tully, Dan Marlow Princeton Madison, Wisconsin February 13, 2003 Current SLB Clock Distribution.
Feb 2002 HTR Status CMS HCal meeting at FIT Feb. 7-9, 2002 Tullio Grassi University of Maryland.
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
25 Sept 2001Tullio Grassi From MAPLD2001 ( space community conference ) Major causes of failures.
E. Hazen1 Fermilab CMS Upgrade Workshop November 19-20, 2008 A summary of off-detector calorimeter TriDAS electronics issues Eric Hazen, Boston.
HO / RPC Trigger Links Optical SLB Review E. Hazen, J. Rohlf, S.X. Wu Boston University.
The CMS HCAL Data Concentrator: A Modular, Standards-based Design
DAQ and TTC Integration For MicroTCA in CMS
Status and Performance of the ALICE Trigger Electronics
The CMS HCAL Data Concentrator: A Modular, Standards-based Design
Update on CSC Endcap Muon Port Card
TELL1 A common data acquisition board for LHCb
The CMS HCAL Data Concentrator: A Modular, Standards-based Design
CMS EMU TRIGGER ELECTRONICS
CMS SLHC Calorimeter Trigger Upgrade,
ECAL OD Electronic Workshop 7-8/04/2005
Calorimeter Trigger Synchronization in CMS,
TTC system and test synchronization
Introduction HCAL Front-End Readout and Trigger Joint effort between:
Regional Cal. Trigger Milestone: Major Production Complete
HCAL Configuration Issues
8-layer PC Board, 2 Ball-Grid Array FPGA’s, 718 Components/Board
Trigger system Marián Krivda (University of Birmingham)
USCMS HCAL FERU: Front End Readout Unit
LHCb Trigger, Online and related Electronics
Overview of the new CMS ECAL electronics
The LHCb Front-end Electronics System Status and Future Development
Multi Chip Module (MCM) The ALICE Silicon Pixel Detector (SPD)
Data Concentrator Card and Test System for the CMS ECAL Readout
TELL1 A common data acquisition board for LHCb
The Trigger Control System of the CMS Level-1 Trigger
FED Design and EMU-to-DAQ Test
HCAL DAQ Interface Eric Hazen Jim Rohlf Shouxiang Wu Boston University
LIP and the CMS Trigger Upgrade On behalf of the LIP CMS Group
TTC setup at MSU 6U VME-64 TTC Crate: TTC clock signal is
Presentation transcript:

Geneve The Alps Where is CERN? Jura Mountains Lake Geneva 18-Sep-18 Drew Baden

18-Sep-18 Drew Baden

Angels and Demons? CERN’s very own X-33 space plane! 18-Sep-18 Drew Baden

LHC 27km proton-proton ring at CERN Reuse the tunnel previously home for the LEP collider Dig new collision areas for new experiments ATLAS & CMS All high pT physics, hermetic, large, general purpose LHCb & Alice Smaller in size and physics scope 18-Sep-18 Drew Baden

LHC Layout 8 arcs + 8 straight sections CMS LHCb Atlas Alice Betatron “cleaning” RF & beam instrumentation Beam dump Momentum “cleaning” 8 arcs + 8 straight sections 4 intersections have experiments CMS, Atlas, Alice, LHCb 4 have instrumentation, beam dump, beam focusing, etc Injection 18-Sep-18 Drew Baden

LHC/LEP Tunnel 27km long bored deep underground tunnel Diameter 4 - 6m Boring is more stable than cut/fill or blasted tunnels 3km are actually under the Jura mountains Diameter 4 - 6m Depth 50 - 175m depending on location 1.4 x 106 m3 ~ (100m)3 soil extracted to dig it 18-Sep-18 Drew Baden

LHC (cont) 18-Sep-18 Drew Baden

…Installation in progress… LHC Progress …27 km of dipoles…whew! …Installation in progress… 18-Sep-18 Drew Baden

LHC Stats Ebeam = 7 TeV, 2 counter-circulating proton beams Bunched beam structure Crossing every 25ns Number of bunches 3654 1.1x1011 particles/bunch DC beam current .56Amps Stored beam energy 350 MJoules Equivalent to ~100 kW-hrs Superconducting NbTi magnets @ 1.9K Dipole field 8.33T @ 7 TeV full beam energy 18-Sep-18 Drew Baden

CMS (cont) 18-Sep-18 Drew Baden

TriDAS Overview CMS HCAL Trigger/DAQ CMS Trigger: Emphasis is on bandwidth and commercial processors Level 1 3 ms latency inside L1 trigger 100 kHz average L1 accept rate (1/400) 100 Gbyte/sec into Level 2 Level 1 Trigger HCAL Data QIE Fibers Trigger/DAQ Level 2/3 DAQ CMS HCAL “Front End” Baden is HCAL “Level 3 WBS Manager” for TriDAS 18-Sep-18 Drew Baden

HCAL Electronics Overview FE MODULE FRONT-END Readout Box (RBX) On detector HPD Shield Wall SBS 12 HTRs READ-OUT Crate Trigger Primitives GOL TTC H T R Level 1 TRIGGER CERN Transmitter 40 bits @40 MHz 20 bits @ 80 MHz =1.6 Gbps FIBERS S-Link: 64 bits @ 25 MHz Rack CPU CLK QIE CCA 2 DCC 1 PC Interface 1 Clk board D C analog optical signals from HCAL 18-Sep-18 Drew Baden

HTR Principal Functions Receive HCAL data from front-ends Synchronize optical links Data validation and linearization Form “trigger primitives” and transmit to Level 1 at 40 MHz Pipeline data, wait for Level 1 accept Upon receiving L1A: Zero suppress, format, & transmit raw data to the concentrator (no filtering) Transmit all trigger primitives along with raw data Handle DAQ synchronization issues (if any) Calibration processing and buffering of: Radioactive source calibration data Laser/LED calibration data Support a VME data spy monitoring Data: total of approximately 650 TB/sec flowing through our boards!!! 18-Sep-18 Drew Baden

HCAL Trigger/Readout (HTR) Board Princeton Fanout Card (1/VME crate) Fiber Data Serial Optical Data LC Deserializers (8) CLK80 Ref Clk Recovered Clk 20 TTC TTCrx Crystal RX_BC0 RX_CLK40 PLL TTC 40 Clk x2 SLB All I/O on front panel Fiber digital data Copper output to L1 and DCC FPGA logic Fully programmable SYS80 Clk Async Fifo SLB TTC Broadcast SLB SYS40 Clk TPG Path SLB XILINX SLB SLB 18-Sep-18 Drew Baden

HTR Card Production Version (Rev 4) Dual-LC O-to-E VME Stiffeners TTC mezzanine Deserializers 6 SLBs Xilinx XC2V3000-4 18-Sep-18 Drew Baden

Firmware DAQ format evolving Top-level view: Maryland/Boston/Princeton collaboration Top-level view: See http://cmsdoc.cern.ch/cms/HCAL/document/CountingHouse/HTR/design/Rev4MainFPGA.pdf 18-Sep-18 Drew Baden

LHC Clocking LEP ring is sensitive to: Distortions in the large (27 km) circumference Tidal distortions Pressure from Lake Geneva Return currents from DC trains running nearby LHC RF clock keeps 3564 buckets of protons circulating CMS must remain synchronous with this clock LEP was concerned about DE~few MeV, LHC will be concerned with Df ~ 25 ppm We have learned to handle this… Train to Bellgarde EFFECT LAKE Geneva EFFECTS TIDAL EFFECTS 18-Sep-18 Drew Baden

Timing Signal Distribution Trigger Timing Control TTC Stream (“RX_CLK”) F A N O U T F A N O U T F A N O U T Rack-to-Rack CAT 7 ECAL H T R H T R H T R H T R D C F A N O U T H T R H T R H T R H T R D C F A N O U T HCAL VME Crates Timing is critical in a synchronous pipeline experiment! 18-Sep-18 Drew Baden

Fanout board 2 operating modes: Global or Crate TTCrx TTC fiber TTC Broadcast 40MHz QPLL can run stand-alone G Clk80 G C QPLL 18 Outputs G C RX_CLK = 40MHz G INT_BC0 FPGA RX_BC0 C EXT_BC0 Delay RX_CLK = 40MHz Input from GLOBAL Fanout RX_BC0 EXT 80MHz 18-Sep-18 Drew Baden

Overall TriDAS Project Cost Contingency: Effort: 50% M&S: 75% Based on the uncertainty in the requirements, which will certainly change over time. Item Cost Effort: Engineering $802,669 Technician $138,684 Total $941,353 M&S: R&D $ 218,100 Production $1,929,374 $2,147,474 Misc: $45,000 Grand Total $3,133,827 18-Sep-18 Drew Baden