Optimisation of the FETS RFQ

Slides:



Advertisements
Similar presentations
RFQ development for high power beams
Advertisements

The Front End Test Stand Collaboration ELECTROMAGNETIC DESIGN OF A RFQ FOR THE FRONT END TEST STAND AT RAL A. Kurup, A. Letchford The RAL front end test.
Imperial College 1 Progress at the RAL Front End Test Stand J. Pozimski Talk outline : Overview Ion source development LEBT RFQ Beam Chopper MEBT.
RFQ Matcher. What am I doing this time?! Concerned that modulations and matcher affect field flatness and frequency These are very small features How.
Tuning the Frequency of the RFQ High Energy End. What are the issues? Both input & output ends of RFQ must be independently tuned for 324 MHz Design of.
Effect of RFQ Modulations on Frequency and Field Flatness
Final Design of a CW Radio-Frequency Quadrupole (RFQ) for the Project X Injector Experiment (PXIE)* Abstract: The Project X Injector Experiment (PXIE)
Pepperpot Emittance Measurements of the FETS Ion Source
Status of the RFQ (i.e. the 4-vane cold model) Ajit Kurup UKNF Meeting 3 rd October 2007.
RFQ CAD Model Tolerance Studies Simon Jolly 14 th December 2011.
RFQ Integrated Design Would like to have a method of designing RFQ where all steps are integrated: –Engineering design. –EM modelling. –Beam dynamics simulations.
Carbon Injector for FFAG
The LHC: an Accelerated Overview Jonathan Walsh May 2, 2006.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
RFQ Thermal Analysis Scott Lawrie. Vacuum Pump Flange Vacuum Flange Coolant Manifold Cooling Pockets Milled Into Vanes Potentially Bolted Together Tuner.
Status Report on Mk.II Pepperpot Simon Jolly Imperial College 13 th June 2007.
Data Acquisition and Error Analysis for Pepperpot Emittance Measurements Simon Jolly Imperial College DIPAC ‘09.
RFQ CAD Model Beam Dynamics Studies Simon Jolly 3 rd August 2011.
F.E.T.S. RFQ Mechanical Design by Peter Savage 7 th January 2010.
NuFACT06, Irvine 27. August 2006 The Front End Test Stand (FETS) is a collaborative project, between CCLRC (ISIS & ASTeC) and UK universities (Imperial.
Quantitative Optimisation Studies of the Muon Front-End for a Neutrino Factory S. J. Brooks, RAL, Chilton, Oxfordshire, U.K. Tracking Code Non-linearised.
REFERENCES [1] C.Y. Tan, FNAL Beams-doc-3646-v16, 2011 [2] V.N. Aseev, TRACK, the beam dynamics code, PAC05 [3] S. Kurennoy, LA-UR TRANSMISSION.
Imperial College 1 Plans and Costs Front End Test Stand Aim is to demonstrate a 60 mA, 2 ms, 50 pps chopped beam at 3 MeV RAL/ISIS (ION SOURCE, CHOPPER,
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
FETS Progress UKNF OsC 21 st June 2010 Dan Faircloth Faircloth.
Status of the Front End Test Stand April Infrastructure R8 refurbished Laser lab under construction Vacuum system for first section delivered Stands.
January 5, 2004S. A. Pande - CAT-KEK School on SNS MeV Injector Linac for Indian Spallation Neutron Source S. A. PANDE.
Simulations and Diagnostics for the Front End Test Stand Simon Jolly Imperial College 18 th April 2007.
FETS RFQ Beam Dynamics Simulations for RFQSIM, CST and Comsol Field Maps Simon Jolly 2 nd June 2010.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
RFQ 3Dtree Space Charge Studies Simon Jolly 6 th June 2012.
RFQ GPT Input Beam Distributions Simon Jolly 22 nd August 2012.
S. Bettoni, R. Corsini, A. Vivoli (CERN) CLIC drive beam injector design.
RFQ Exit Bunch Modelling Simon Jolly 25 th July 2012.
Concept Preliminary Estimations A. Kolomiets Charge to mass ratio1/61/8 Input energy (MeV/u) Output energy (MeV/u)2.5(3.5) Beam.
Progress of Bunched Beam Electron Cooling Demo L.J.Mao (IMP), H.Zhang (Jlab) On behalf of colleagues from Jlab, BINP and IMP.
Wolfgang Vinzenz FAIR Proton Linac 10 th FAIR MAC November 25 th and 26 th 2013 Proton Linac 1 Status Buncher Design  Rectangular design, longitudinal.
THE MAFF IH-RFQ TEST STAND AT THE IAP FRANKFURT A. Bechtold, J. Fischbach, D. Habs, O. Kester, M. Pasini, U. Ratzinger, J. Rehberg, M. Reichwein, A. Schempp,
FETS Ion Source Diagnostics: The Pepperpot
F Sergei Nagaitsev (FNAL) Webex meeting Oct ICD-2 chopper requirements and proposal #1.
RFQ CAD Model Tolerance Studies Simon Jolly 2 nd May 2012.
PXIE RFQ Design Overview Derun Li for PXIE RFQ Design Team Center for Beam Physics Accelerator and Fusion Research Division Lawrence Berkeley National.
One More RFQ Design Renewal ANL Design. Several MHz RFQ Designs ANL-1LBNL-1LBNL-2ANL-2aANL-2b Vane modulation typeSinusoidal Sinusoidal +
Welcome to the RFQ Meeting
The RAL Front End Test Stand
Bunching system for SPES project
Linac4 Beam Characteristics
F.E.T.S. Mechanical Engineering Update
Progress in the Multi-Ion Injector Linac Design
GPT Simulations of the Ion Source Beam
Pepperpot Emittance Measurements of the FETS Ion Source
Time-Reversed Particle Simulations In GPT (or “There And Back Again”)
PROGRESS REPORT OF A NLNS-FFAG ADS MAGNET
Physics design on Injector-1 RFQ
Status of the Front End Test Stand April 2007.
H- Ion Source Development
Implications of HOMs on Beam Dynamics at ESS
KICKER STATUS G-2 meeting March 5, 2014
(i.e. the 4-vane cold model)
Pulsed Ion Linac for EIC
Part2: Cavities and Structures
commissioning and measurements
Physics Design on Injector I
Mechanical Engineering progress for the Front End Test Stand
Front End Test Stand (F.E.T.S.) Engineering Progress Report
ICAP 2006, Chamonix Mont-Blanc
Status of the JLEIC Injector Linac Design
EM Simulation of wakes in BSRT beampipe with extraction mirror
Multi-Ion Injector Linac Design – Progress Summary
Simon Jolly UKNFIC Meeting 25th April 2008
Presentation transcript:

Optimisation of the FETS RFQ Simon Jolly Imperial College 16th September 2008

Simon Jolly, Imperial College FETS RFQ Optimisation RFQ development progressing on a number of fronts. Bead-pull and resonance measurements of cold model. Beam dynamics simulations in General Particle Tracer (GPT). New integrated design method using Autodesk, Microwave Studio and GPT. 16/9/08 Simon Jolly, Imperial College

Bead-Pull Field Flatness Measurements Ø6mm dielectric bead EPAC’08 THPP024 16/9/08 Simon Jolly, Imperial College

Cold Model End Flange Inserts 2 new types of end flange were designed to alter the inductance and capacitance of the RFQ end regions: a cone-shaped flange insert and a flat insert with 4 removable fingers (copper or iron). GUIDE CONE HUB FINGER HUB SPACER FINGERS 16/9/08 Simon Jolly, Imperial College

Cold Model Frequency and Q-value Frequency (MHz) Q-value CST Simulation 319.7 9306 Brazed RFQ 318.954±0.1 5616±50 Flat end plates 319.145±0.1 7773±30 EPAC’08 THPP024 16/9/08 Simon Jolly, Imperial College

Simon Jolly, Imperial College GPT RFQ Simulations General Particle Tracer is a particle tracking package: sophisticated particle tracking but only simple beamline components. Need to model RFQ as time-varying E and B field map: track particles through field map and measure beam properties. Field map produced using RFQ optimisation code (Alan) for full 4m FETS: 11 x 11 x 3110 mesh points. x/y: -3.5 to 3.5mm (fixed mesh). z: 0 to 4.1m (variable mesh). Includes transverse and longitudinal field modulations. Input conditions: Input beam: 60mA, 65keV, x/y = 2mm, x’/y’ = 100mrad, ex/ey = 0.2p mm mrad, beam converging. 10,000 particles, 0.3ns timestep (freq/10), 100% 3Dtree space charge. Single bunch at injection with 3D space charge. Measure beam transmission, bunching and energy. 16/9/08 Simon Jolly, Imperial College

RFQ Transverse Field Map 16/9/08 Simon Jolly, Imperial College

Simon Jolly, Imperial College RFQ On-Axis Ez Field 16/9/08 Simon Jolly, Imperial College

RFQ Parameters (from TUP066, LINAC06) 16/9/08 Simon Jolly, Imperial College

Initial Conditions: Z-Y, 5 bunches 16/9/08 Simon Jolly, Imperial College

Full FETS Simulation: Z-Y, 5 bunches 16/9/08 Simon Jolly, Imperial College

Initial Conditions: Z-E, full beam 16/9/08 Simon Jolly, Imperial College

Full FETS Simulation: Z-E, full beam 16/9/08 Simon Jolly, Imperial College

Simon Jolly, Imperial College Final Beam Energy (60mA) 16/9/08 Simon Jolly, Imperial College

Simon Jolly, Imperial College RFQ Beam Transmission 16/9/08 Simon Jolly, Imperial College

RFQ Transmitted Current 16/9/08 Simon Jolly, Imperial College

Simon Jolly, Imperial College RFQ Integrated Design RFQ parameterised by ‘a’ and ‘m’ parameters for modulations and ‘L’ for cell length. These parameters generated using optimisation code, then handed to Frankfurt for RFQ manufacture. Would like to have a method of designing RFQ where all steps are integrated: Engineering design. EM modelling. Beam dynamics simulations. L a r0 (mm) ma L/2 rod axis beam axis 16/9/08 Simon Jolly, Imperial College

RFQ Integrated Design: Step 1 Most FETS CAD modelling done using Autodesk Inventor, including the cold model. Possible to draw vane modulations using spline interpolation. Parameters read out from Excel spreadsheet: can change modulations “on the fly”... 16/9/08 Simon Jolly, Imperial College

RFQ Integrated Design: Step 2 EM modelling already carried out for cold model using CST Microwave Studio. Export “.sat” file to MWS from Autodesk of 3D vane model: only central 1cm x 1cm section. Cut into 4 sections: Mirrors real assembly. Easier for MWS meshing. Output as E & B field map. 16/9/08 Simon Jolly, Imperial College

RFQ Integrated Design: Step 3 Import field map of central field region into GPT for particle tracking. Optimise design based on RFQ transmission and feed back into engineering design. We now have a method of producing a field map and carrying out simulations for the thing we’re going to build! 16/9/08 Simon Jolly, Imperial College

Simon Jolly, Imperial College Conclusions Incremental progress on field flatness and resonant properties – see EPAC’08 paper THPP024, S. Jolly et al. RFQ beam dynamics simulations in GPT very promising: see bunching, acceleration, current-dependent transmission. >90% transmission for ideal beam, only ~50% for “real” parameters. Can (almost) run end-to-end simulations in GPT using pepperpot measurements from ion source, optimised LEBT parameters and field map for RFQ. Integrating Autodesk, MWS and GPT design steps will reduce bifurcation of design. Need to ensure CAM systems will understand our CAD models so we can manufacture what we’re designing (this is the point...). 16/9/08 Simon Jolly, Imperial College