Tom Shea Front End Meeting Catania

Slides:



Advertisements
Similar presentations
Requirements Structure and Status for NCFE
Advertisements

TUPD02 BEAM DIAGNOSTICS FOR THE ESS BLM BPM Trans Profile Bunch Shape BCM Preliminary System Count A. Jansson, L. Tchelidze, ESS AB, Lund, Sweden Hybrid.
ESS DTL beam commissioning
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Experience from the Spallation Neutron Source Commissioning Dong-o Jeon Accelerator Physics Group Oak Ridge National Laboratory May 9, 2007.
Report from Task Force on Beam Instrumentation Stephen Molloy.
Configuration Management Romuald Duperrier Head of Systems Engineering Division April 22, 2015.
SNS Beam Diagnostics A. Aleksandrov Spallation Neutron Source, Oak Ridge, USA.
Beam on Target Diagnostics Beam on Target Meeting 2013 March Tom Shea.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
ESS wire scanner Benjamin Cheymol
Personnel Safety Systems Stuart Birch Senior Engineer, Personnel Safety Systems November 6 th, 2014.
PBI task force intermediate report Stephen Molloy.
Managed by UT-Battelle for the Department of Energy Experience on SNS Beam Instrumentation Collaborations Willem Blokland Beam Instrumentation Group Spallation.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
ESS Beam Diagnostics Overview Andreas Jansson / BI Group Beam Diagnostics Mini-workshop
ACCSYS Design Reviews J. G. Weisend II Deputy Head of Accelerator Projects.
ESS Front End diagnostic
Integrated Control Systems Status and Plans Garry Trahern Head of ICS Division TAC 9, 3 rd April, 2014, ESS, Lund.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
ESS licensing process and Readiness Reviews
RF cell Anders Sunesson RF group leader
Experience with beam instrumentation at Linac4
ESS cavity procurement via in-kind contributions
BE-BI Software for LINAC4
Proton Source and LEBT Luigi Celona & Lorenzo Neri
CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015
IS&T Project Reviews September 9, 2004.
Considerations on Beam Diagnostics Physics
ESS Project Status Roland Garoby – Technical Director August 2018.
Beam Commissioning at ESS
RF systems introduction
Way of working with ICS HWI Hardware and Integration
Testing and deployment
Plan for controls with the digital platform
Status of Control Services ICS WP10 (accelerator integration work package) Tuesday 20th November
ICS update 7th Experiment Control Workshop
Ciprian Plostinar Workshop on Testing and Commissioning
Ion Source and LEBT control system topology, Interlock strategy
Krzysztof Czuba ESS LLRF Quarterly Meeting
Risk, Schedule, Deliveries
ISRC and LEBT Vacuum System Design
THE STATE OF BEAM DIAGNOSTICS
LCLS Undulator System Status and Schedule
A few commissioning experiences from a few hadron facilities (SNS, RHIC, AGS Booster, LANL PSR) Thomas Shea ESS.
Testing Coordination at ESS
MPS commissioning at ESS
Tom Shea, Andreas Jansson, Cyrille Thomas
Ion Source and LEBT Beam Diagnostics
(Beam) Commissioning Plan
LCLS Undulator System Status and Schedule
Safety Readiness Review (SRR) Thomas Hansson, ESH
Cables, Racks, and the rest
Machine Protection PLC Based System Verification and Validation Plan
High Level Readiness Reviews
Beam Commissioning Planning
Lessons from the 1st Safety Readiness Review
Accelerator NCFE Liaison Officer
Status of the ESS High Power RF Systems
RF introduction Anders Sunesson RF group leader
Charge and Agenda of the 18th TAC meeting
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
BI/Vacuum Mechanical design
Target Safety System Interfaces
SAR MEBT Bilbao March Mats Lindroos
ISrc & LEBT – ICS Installation Readiness Review
Procedure for MEBT installation in the accelerator tunnel at ESS
22-SAR MEBT Vacuum test Aitor Zugazaga Zamudio, 27 March 2019.
General Overview of WP 12 ESS Vacuum System
Project Support Meeting January 9, 2019
Presentation transcript:

Tom Shea Front End Meeting Catania Beam Instrumentation Tom Shea Front End Meeting Catania www.europeanspallationsource.se 18 September, 2018

Tom Shea - NCFE meeting, Catania Awake at Night Source at Catania January 2017 We are here RFQ + MEBT Source DTL Tank 1 DTL Tank 4 Spokes + Medium Beta Beam delivery ESS 1 2 3 4 5 6 7 2015 2016 2017 2018 2019 SNS 2002 2003 2004 2005 2006 1 2 3 4 5 6 7 8 9 Medium Beta + High Beta Source at Berkeley RFQ + MEBT at Berkeley RFQ + MEBT at Oak Ridge DTL Tank 1 DTL Tank 3 CCL Ring Beam delivery 11/01/2017 Tom Shea - NCFE meeting, Catania

Catania: Commission, Support Beam Instrumentation Focus for 2017: Transition to Front End Deployment January 2017 We are here 1st protons in Lund Focus areas for front end: Catania: Commission, Support Decide Prototype Produce Install ! New Year 2017 midsummer gallery ready New Year 2018 General areas of PBI focus; actual activities will overlap. Functionality documents Reviews Data management Verification plans Test systems Transition to site Commissioning plans Tactical response to issues Building blocks Agreement with ICS Document agreement at machine director level 11/01/2017 Tom Shea - NCFE meeting, Catania

Instrumentation Systems for the normal conducting front end Of the 23 system variants we plan to deploy 13 in the warm front end Current Monitor (BCM) Fast BCM Doppler (DPL) Allison scanner (EMU) Slit and grid (EMU) Faraday cup (FC) Long. Bunch Shape (BSM) Fluorescence NPM Wire Scanner (WS) Position Monitor (BPM) Fast BPM Ion Chamber Loss (icBLM) Neutron detectors (nBLM) Primary issue is electronic hardware. We must now make final design decisions on these 13 For commonality, also make final decisions on similar systems 11/01/2017 Tom Shea - NCFE meeting, Catania

Working with Us: by System and by Technology System and Technology Leads (with our IK partner leads): By System EMU, FC, WS (Benjamin) BSM (Irena/Benjamin) NPM, Doppler (Cyrille) BCM (Hooman) BPM (Rafael) BLM (Irena/Tom) By Technology Mechanics (Thomas G) Electronics (Rafael) Software (Hinko) FPGA (Maurizio) Data Management (Johan/Slava) Requirements and Interface Management: By System Specification Document with L4 Requirements Functionality Document Verification Plan Commissioning Plan By Technology Mechanics: Catia/CHESS Electronics, Software, and FPGA: Building Blocks Data Management: Naming Tool, Cable Database, CCDB, etc Not intended to be an exhaustive list; categorization is not strict - it indicates primary intent of documentation Refinements coming as new recruits arrive. Tom Shea - NCFE meeting, Catania 11/01/2017

Communication Head/ bottleneck Team 1 Team 2 Team 3 Team 4 Strive for an ideal situation: Technical communications: System and Technology Leads coordinate directly with partners and stakeholders Decision-making and collaboration meetings: One face-to-face per three videoconferences Expectation Management: System team of 4: BD Lead, IK Lead, Beam Physics and ICS. Coauthor: first proton functionality and commissioning plan. Purcell: the other team SNS: regular manager meetings, team VC, but not enough face to face between engineers. Johan: example of mobile phone display documentation. ESS will not solve collaboration challenges through voluminous documentation. Probability of weekly communications vs. distance Graph: T. Allen, Sloan WP 165-97, MIT, 1997

Lessons Learned (a very tiny subset) I believe that our organizational structure can handle the challenges to come Even better, we will evolve, based on experience and a spirit of continuous improvement Legacy Schedule issues: Embed float in contract/plans; review at PDR LEBT vacuum component issues: Vacuum section/partners provide vacuum chambers and components. Recent PBI deployment in Catania Mechanical integration issues (chamber did not accept EMU): Release all devices, even temporary, into mechanical CAD model Limited time for system deployment: Document integrated commissioning plans; more frequent face-to-face engagement ICS integration issues, no MPS: Coauthor the (first proton) functionality documents and building blocks. Grounding/EMI/analog front end issues: Engage technology leads Useful BCM demo on HV supply: Leave this loaned device in place for now Data management: MEBT-Target cables/racks/devices in databases. Add LEBT. Excellent physics/technical designs: Continue focus on commissioning Motivated partners: Maintain engagement through commissioning in Lund 11/01/2017 Tom Shea - NCFE meeting, Catania

Catania: Commission, Support Outlook January 2017 We are here 1st protons in Lund Focus areas for front end: Catania: Commission, Support Decide Prototype Produce Install ! New Year 2017 midsummer gallery ready New Year 2018 General areas of PBI focus; actual activities will overlap. LEBT diagnostics meeting this week EMU commissioning run next week Building blocks First Proton Functionality 4 additional staff members Revisions to system and technology leads Installation manager Face-to-face engagement System Teams responsible for integration and commissioning System Lead Partner Beam Physics ICS 11/01/2017 Tom Shea - NCFE meeting, Catania

backup

Tom Shea - NCFE meeting, Catania System Lifecycle PDR CDR SAR – handoff from IK partner to ESS-BD section ARR – ready for beam Commissioning – handoff from ESS-BD to Operations 11/01/2017 Tom Shea - NCFE meeting, Catania

Tom Shea - NCFE meeting, Catania Cable Database All instrumentation cables entered in database from MEBT through Target 11/01/2017 Tom Shea - NCFE meeting, Catania

Tom Shea - NCFE meeting, Catania Naming Tool All instrumentation devices are in lattice and named with naming tool. 11/01/2017 Tom Shea - NCFE meeting, Catania