IBAC – CNS/ATM Datalink Briefing

Slides:



Advertisements
Similar presentations
EUROCAE WG 73: UAS integration Elements for the European Commission UAS panel Presentation at Workshop 2 UAS insertion into airspace Gérard Mardiné (SAFRAN-Sagem)
Advertisements

Unmanned Aircraft Systems EUROCONTROL ATM Integration
GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
Communication Roadmap ACP WGW04 – AI5 Jacky Pouzet, EUROCONTROL
Overview of the interoperability Regulation
ESA Iris Programme: status
Federal Aviation Administration International Civil Aviation Organization INFORMATION PAPER AERONAUTICAL COMMUNICATIONS PANEL (ACP) 13th MEETING OF WORKING.
LINK2000+ Status Søren Dissing
LINK update Datalink Implementation EC Regulation 29/2009
Air / Ground Communications in Europe
1 ICAO WGN New Orleans Nov Programme Overview Incentives and a Mandate Issues Conclusion Contents.
A GLOBALink ARINC VDL Mode 2 AOA and ATN Program Status & Deployment Activities November, 2000 AMCPWGM1 WP23.
1 LINK European Organisation for the Safety of Air Navigation ICAO WG N Brussels July 3 rd -6 th Presented by Eurocontrol – Martin Adnams.
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
Page 1STNApresentation of data-link activities DATA-LINK IMPLEMENTATION IN FRANCE Initial data-link services with ACARS - Departure Clearance, ATIS - CPDLC.
SC-214 / WG-78 Mgt Meeting Nov 2010 Rockville, MD – Lockheed Martin.
European ATM Stakeholder Forum. Discussion Topics Single Sky Committee SESAME SES Implementation Eurocontrol Activities Next Meeting Single Sky Committee.
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
Air-Ground Data Link - DFS Strategy
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
Recording of Digital Communications AEA position and concerns with JAA FRSG WP Vincent De Vroey Manager Operations and ATM Association of European.
Objective ITY-SPI ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
CASCADE From Concept to Implementation SUR Division Meeting Brussels, 17 December 2007 Alex Wandels, Jörg Steinleitner, Sorin Muresean CASCADE Programme.
Objective ATC 16 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Data Link Communications
1 EUROCAE EUROCAE Dedicated to Aviation Standardisation ASAS Standards: “From concept to equipment” David Bowen (Technical Secretary) April 24 th 2007.
3rd ASAS TN Workshop 19 April – 21 April rd ASAS TN Workshop Session 4: Strategy and Implementation Package I Requirements Focus Group (“Rapid.
International Data Link Symposium st October 2003, Newbury, UK FEASIBILITY STUDY FOR CIVIL AVIATION DATA LINK FOR ADS-B BASED ON MIDS / LINK16 Bob.
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
Airbus Status on ADS-B In / Out Update
© EUROCONTROL European Air Traffic Management Programme The European ATM Master Plan ASAS TN Dave Young, Business Dev. Manager, EEC.
Federal Aviation Administration Data Communications Program FAA Prototype & Validation Activities Presented to:Data Comm Implementation Team By:Craig Morris.
1 Conditions for Mandating Data Link Equipage Steve Zerkowitz - IATA.
ASAS TN Session 4 summary Billy Josefsson, LFV Rob Ruigrok, NLR.
A consolidated starting point from DFS / AENA / LFV ASAS Thematic Network Workshop Toulouse, Is ASAS /ADS-B needed for ANSP strategy?
The CASCADE Programme Blueprint for ADS-B Deployment ASAS-TN2 Workshop – Amsterdam April 2007 Christos Rekkas CASCADE Deputy Programme Manager, EUROCONTROL.
Programme Status ECTL AAB February FACTS  A mature approach: 2500 contributors Release process organises the delivery cycle ATM Engineering:
European Commission 1 Interoperability of Air Traffic Management systems for the Single European Sky.
International Civil Aviation Organization
ICAO EUR/NAT Office Celso Figueiredo – Regional Officer ANS - ATM
Workshop on preparations for ANConf/12 − ASBU methodology
ESA Iris Programme: status
NEXCOM Next Generation Air/Ground Communications
Workshop on preparations for ANConf/12 − ASBU methodology
ADS-B OUT - IATA VIEW ADS-B SITF/11 – Jeju, Korea 24 – 27 April 2012
Communication Roadmap ACP WGW04 – AI5 Jacky Pouzet, EUROCONTROL
International Cooperation
GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
Workshop on preparations for ANConf/12 − ASBU methodology
ATN London - 23 September 2003 Alex Wandels
Rome November 2008 Johan Martensson, CASCADE
International Civil Aviation Organization
Eighth UK European ATM Stakeholders Forum 24th April 2006
6th May 2002 Current Status of FAA Controller-Pilot Data Link Communication (CPDLC) - Build 1, 1A, and Beyond M J A Asbury Presentation ATN3.3 The development.
NEXCOM Next Generation Air/Ground Communications Appendix G
EUROCONTROL SURVEILLANCE STRATEGY
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART I
Presented at ICAO ACP WG-I By Robin Hughes
International Civil Aviation Organization
Future Communications Infrastructure – An update
15-19 Nov 2010 Rockville, MD – Lockheed Martin
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
NEXCOM Next Generation Air/Ground Communications Briefing Presented to
ICAO WGN New Orleans Nov 2004
DATA LINK IMPLEMENTATION IN EUROPE
Bringing Early Benefits … Building Momentum … Converging !
ASAS-TN2 5th Workshop Toulouse 17 September 2007 Jörg Steinleitner
Objective ATC 16 ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR
International Civil Aviation Organization
Presentation transcript:

IBAC – CNS/ATM Datalink Briefing 17-Nov-2010 Martin Adnams

LINK 2000+ First Datalink Implementation Implementing En-route CPDLC over ATN/VDL2 Baseline ICAO standards Forward compatible with new services/technology Programme Objectives ACL – ATC Clearances ACM – ATC Microphone Check ACM – ATC Communications Management Above FL285

LINK 2000+ First Datalink Implementation Implementing En-route CPDLC over ATN/VDL2 Baseline ICAO standards Forward compatible with new services/technology Programme Objectives Overall 11% Capacity Gain Reduced Controller Workload Increased Safety Fewer Misunderstandings Above FL285 Infrastructure Basis FDPS, Avionics, A-G tech. >>> SESAR

Implementation Strategy Pioneers Incentives Mandate 1 Pioneers Objective: 100+ aircraft equipped/ MAAS UAC ACHIEVED – >400 committed Incentives Objective: accelerate Airborne equipage for early benefits ACHIEVED – EC TENT-EA Funding Granted Mandatory Implementation - SES IR For Operators and ANSPs Objective: more than 75% of flights in LINK airspace by 2015 ACHIEVED - EC Reg. No 29/2009 Published 2 NOW WE JUST NEED TO IMPLEMENT 3

DLS IR (EC Reg. No. 29/2009) Key Dates Aircraft Forward Fit New aircraft conform ANSPs LINK/Core Region INCENTIVES = EARLY EQUIPAGE Aircraft Retrofit Fit ANSPs Whole of EU 1st Jan 2011 7th Feb 2013 5th Feb 2015 2009 2010 2011 2012 2013 2014 2015 2016

Which Aircraft shall equip? A/C operating IFR/GAT in the EU data link Airspace (FL>285)‏ All aircraft flying the EU data link airspace unless exempted under following conditions

Automatic Exemptions – Article 3 a/c with individual airworthiness certificate before 01/01/2014 and equipped with FANS ED-100, ED-100A certified data link equipment a/c which are at least 20 years old and planned for cease of operations before December 2017 a/c flying for testing, delivery and maintenance purposes State a/c but those entering into service after 1 January 2014 should comply with the rule if equipped with non-military data-link

DLS-IR Exemptions Under Article 14 Application to EU Needed Aircraft types reaching the end of their production life and being produced in limited numbers Aircraft types for which re-engineering costs required would be disproportionate due to old design Case must be Made by Applicants Can be Permanent or Temporary for Forward Fit Applications for Temporary Exemptions before Nov 17th 2010, otherwise it will not be possible for the Commission to form an opinion in due time before the Forward Fit date itself i.e. Jan 2011.

Process for Exemptions Under Article 14 Request (ERQ) Requirements & Template The European Commission is the Process Owner Applicant Submits ERQ to European Commission Exemption Cell Analysis Exemption Cell Report SSC OPNION Decision of European Commission Confidential Discussion Request for Information Applicant DOC All Applications to be made electronically to EU Contact: eduardo.morere-molinero@ec.europa.eu

Decisions on Exemptions EUROCONTROL Report Begin SEPT Briefing to Single Sky Committee SEPT 20/21 Information Paper & Draft Decision Vote & Decision Single Sky Committee DEC 3rd Further requests for Permanent Exemption ASAP Final Date end 2012

EASA Certification & DLS IR Compliance APPLICANT EASA CERTIFICATE Apply to EASA, Comply Special Condition/ Cert. Specification EASA Check Airworthiness and Interoperability One Single Process – Airworthiness & Compliance to EC 29/2009 2 4 3 1 EASA/EC Workshop on March 16th >>One Process Airworthiness & Compliance Brochure Special Condition for Early Applicants - In Preparation EASA Certification Specification planned Q2 2011

LINK Objectives for 2010 Concrete Implementation plan for LINK 2013 ANSPs Contact the 2015 ANSPs Survey Complete Results in PRISME Plan & provide Test & Expert support to ANSPs and Airlines So far mainly Airborne but 24 ANSPs now request support Validate Multi-Frequency VDL Mode 2 Flight Tests Dec 2010 Finalise Contracts with Airlines for the LINK Incentives Scheme Contracts with 23 Airlines being signed >> 712 aircraft

Incentives For Airborne Equipage EUROCONTROL Application to TENT-EA made March 15th 2009 Requested by IATA/AEA/IACA/ERAA/EBAA Evaluation Passed – Decision Final 22/12/2009, 19.3M€ >50% Must be Spent by End 2010 25% End 2011 25% End 2012

Incentives Status 3 Calls for Tender launched January, June & August From 1st call 19 Airlines will be contracted From 2nd & 3rd call evaluation in progress But numbers much lower than in 1st call More than 700 aircraft to be equipped, But not all the Grant money will be used

Central Reporting Office (CRO) Is it all Working? - INTEROPERABILTY How Well? – PERFORMANCE Problems? - INVESTIGATE

Pilot and Controller HMI See Controller and Pilot Demonstrator at http://www.eurocontrol.int/link2000/public/standard_page/pilot_atco_mockup.html

CONCLUSION on LINK The DLS IR dates are firm Time is short Good Progress but still much to do The LINK Team is resource limited Please make any support requests in good time UPLINK 13 – Available, take a copy

Datalink Will Evolve 2015+ 2020+ SHORT TERM SESAR – IP1 MEDIUM TERM LONG TERM SESAR – IP3 IOC IOC IOC IMPLEMENTATION Package(s) IMPLEMENTATION Package(s) LINK 2000+ Initial CPDLC Initial 4D Full 4D LINK Message set Initial 4D Message set(s) Full 4D Message sets Transition VDL M2 FCI IOC – Initial Operational Capability

EUROCAE WG-78/RTCA SC-214 Standards for IP2 Services 2010 2011 2008 2009 FAA Call to Industry WP1 + WP2 WP1 Draft WP2 Standards Publication

Initial 4D & Other Services for IP2 First Proposal for Implementation >> end 2011 En-Route, TMA Initial 4D 4DTRAD FLIPINT Airport D-TAXI D-OTIS Others D-RVR D-HZWX Oceanic ATSA ITP/IM Improved Planning NOT Separation In line with SESAR’s longer term approach Provides an intermediate and pragmatic step Co-ordinated with FAA in WG78/SC214 SESAR JU WP9 >> Prototype Avionics 20

Legacy systems and New IP3 Technology Proposed Multilink Concept Legacy Systems Airport surface General terrestrial Satellite: Oceanic + Continental

FCI Deployment for IP3 Initial Operational Capability Transition and wider Roll-out Full Network Benefits 2020 Circa 2025 Circa 2030 Satcom FCI Satcom FCI Satcom FCI Aero-Max Some Airports Aero-Max Some Airports Aero-Max Some Airports Aero-Max Some Airports Terrestrial FCI Full European Terrestrial FCI Some areas Terrestrial FCI Grows Legacy system (e.g.VDL M2, DSB-AM) FCI New voice system? Continued use of Voice – More use of Datalink Capacity, Safety, Performance, Cost Targets

CONCLUSION on Next Steps SESAR and NEXTGEN R&D, Validation Underway Formal EC-FAA Co-ordination in place OPLINK Panel working on Datalink Harmonization Plan for ANC2012

THANK YOU