Future L&D System Architecture

Slides:



Advertisements
Similar presentations
Fiscal Law Project Planning Session Results December 18, 2002.
Advertisements

1 Prepared by THE MARKETING SOURCE, INC. A service of Hampton Roads Transit Hampton Area Transportation Needs Assessment Study October 2001.
Presentation by Prabhjot Singh
School of Engineering & Technology Computer Architecture Pipeline.
Geoinfosys Technologies New Delhi 9 th February 2012 Development of ‘Geographical Information System’ (GIS) based “Decision Support System for Transport”
TAI Club Management Systems by TAI Consulting, Inc. Membership Management and Membership Accounts Receivable.
0 COMPETITIVE INTELLIGENCE A PROCESS THAT CREATES COMPETITIVE ADVANTAGE NOT A REPORT THAT SITS ON A SHELF Plan Integrate Collect Analyze Communicate 4200.
1 ETM 5121 Project Proposal Determination of How to Handle Contract Craftsmen Employees in the SAP Plant Maintenance Module of ABC, Inc.’s Illinois Refinery.
Copyright 2007, Prentice Hall, Inc. 1 1 Principles of Marketing Fall Term MKTG 220 Fall Term MKTG 220 Dr. Abdullah Sultan Dr. Abdullah Sultan.
3 April National Urban Alliance Results from the recent strategizing session with key NUA leadership.The visual maps within were created by the participants.
Status Report on the AMPO Pooled Research Initiative on Travel Modeling Presentation to AMPO Travel Modeling Work Group November 4, 2010 MWCOG / NCRTPB.
Management Consultancy
Preparation of a Strategic Pilot Program for Climate Resilience (PPCR) Project - Phase I (November January 2013) Climate Investment Funds (CIF) Grant.
Strategic Information Initiatives Week 1 Base-line Perspectives Frank Coker, MBA, CMC President Information Systems Management, Inc. (a consulting firm.
CURRENT CAPABILITIES INVENTORY LEARNING & DEVELOPMENT STRATEGIC PLAN If you have questions regarding this survey, please call. After completing the survey,
APRIL 18-23, 2012 PROJECT PLAN TO DEVELOP A LEARNING & DEVELOPMENT STRATEGIC PLAN FOR RETAIL EMPIRE, INC. Prepared by: Alice Monroe, Chief Learning Officer.
TABLE OF CONTENTS Page Workshop Overview 8
©2012 RAY SVENSON CONSULTING, INC. 1 DESIGN MEETING AGENDA/WORKING TEAM Meeting Purpose: The purpose of the meeting is to design a high-level Learning.
ANALYSIS FINDINGS AND CONCLUSIONS
FOLDER AND FILE STRUCTURE
DATE PROJECT PLAN TO DEVELOP A LEARNING & DEVELOPMENT STRATEGIC PLAN FOR Prepared by: 1 ©2012 RAY SVENSON CONSULTING, INC. RAY SVENSON CONSULTING, INC.
Writing Executive Summary Sandra Sembel and Itje Chodidjah.
©2012 RAY SVENSON CONSULTING, INC. 1 DESIGN A HIGH-LEVEL SYSTEM ARCHITECTURE Facilities and Equipment Infrastructure NetworkLMSContent RepositoriesHRISAccess.
KEYS TO SUCCESSFUL PROJECT IMPLEMENTATION Wannetta Bennett Turtle Mountain Community College
Information Reduces uncertainty Helps focus decision making.
The population in a statistical study is the entire group of individuals about which we want information The population is the group we want to study.
Manufacturing/Production Economics Team Project Team Members 정윤환 조윤익.
Roadmap & Actions Expert Consultation Health in All Policies.
©2012 RAY SVENSON CONSULTING, INC. 1 ANALYSIS MEETING AGENDA/WORKING TEAM Meeting Purpose 1.Pull together all the data that has been collected into one.
©2012 RAY SVENSON CONSULTING, INC. 1 PHASE 5: IMPLEMENTATION PLANNING Implementation Plan Outline Milestones/Timeline Communication Plan Implementation.
©2012 RAY SVENSON CONSULTING, INC. 1 PHASE 2: DATA COLLECTION Why do data collection? Three categories of data collection:  Business Requirements —Business.
©2012 RAY SVENSON CONSULTING, INC. 1 PHASE 1: PROJECT PLANNING What do we mean by project planning for developing strategic plan for learning and development?
FOCUS GROUP INTERVIEW GUIDE LEARNING & DEVELOPMENT STRATEGIC PLAN Group: Interviewer: Date: PHASE 2: Data Collection 1 ©2012 RAY SVENSON CONSULTING, INC.
OUTSOURCING AN EFFECTIVE LEARNING & DEVELOPMENT STRATEGY ISPI 2012 TORONTO, CANADA Sample PHASE 4: Future L&D System Architecture 1 ©2012 RAY SVENSON CONSULTING,
Phases, Tools, and Techniques Chapter 6 System Development Phases, Tools, and Techniques Shen Bo The Systems Development Life Cycle.
By Muyowa Mutemwa Supervisor B. Tucker Co-Supervisor Prof: I. Venter.
IMPLEMENTATION PLAN OUTLINE
3R activity in the Republic of Kazakhstan. Current situation on the policy level “Concept of transition of the Republic of Kazakhstan to Green Economy”
Logistics Assessment & Planning
New Accounts Payable System
Lower Lakes Towing – Prophix story
Entrepreneurship Basic Structure
Bytegrow - Web, Android And Iphone App Development Company Jaipur
Thank You! For More Details Visit us at Mobile Phone Accessories Market.pptx Follow Us On.
Floor & Decor Outlets of America – Prophix story
Interviewee: Interviewer: Date:
COMMUNICATION PLAN DESIGN GUIDE
Interface: Interviewee: Interviewer: Date:
Source Document: Analyst: Date:
BUSINESS-DRIVEN STRATEGIC PLANNING FOR LEARNING & DEVELOPMENT
“WAR ROOM” CONCEPT Purpose: Post on the Walls: Use for: Need:
Initiative: Interviewee: Interviewer: Date:
ANALYSIS REPORT OUTLINE
Future L&D System Architecture
Developing a Business Plan
How do you build a common agenda?
EXECUTIVE STEERING TEAM – DESIGN REVIEW MEETING AGENDA
POPULATION DYNAMICS FORECAST
Business Plan Document: Analyst: Date:
Unit 5: Planning Process, IAP, and Operations Briefs
PRODUCTS/SERVICES DEPLOYMENT BY GEOGRAPHY AND CHANNEL
Company: Interviewer: Date:
LEARNING & DEVELOPMENT STRATEGY: PROCESS OVERVIEW
Unit 5: Planning Process, IAP, and Operations Briefs
Common strategy development process I
LEARNING & DEVELOPMENT STRATEGY: PROCESS OVERVIEW
IT Transformation Strategic Plan and Pilot Project Closure
Presentation transcript:

Future L&D System Architecture PHASE 4: Future L&D System Architecture APRIL 18-23, 2012 Sample EXECUTIVE BRIEFING FUTURE LEARNING & DEVELOPMENT SYSTEM ARCHITECTURE DESIGN REVIEW RETAIL EMPIRE, INC. LEARNING & DEVELOPMENT STRATEGIC PLAN ©2012 RAY SVENSON CONSULTING, INC. RAY SVENSON CONSULTING, INC. • 112 Two Mile Bridge Road • Roberts • MT • 59070 www.raysvensonconsulting.com • e-mail: ray@raysvenson.com Office phone: 406-446-1861 • Mobile phone: 406-425-4013 1

Executive Briefing PROJECT APPROACH PHASE 4: Future L&D System Architecture Project Process Map Project Plan Development Data Collection and Analysis Design Phase Implementation Plan Business Needs Analysis Analysis Findings and Conclusions Design High-Level Learning & Development System Architecture 3-5 Year Implemen- tation Plan and Business Case Project Plan Assess Current Capabilities Executive Review Executive Review Executive Review Research Best Practices Develop Population Forecast Develop Specifications and Design Details 3 Months

Executive Briefing KEY ANALYSIS FINDINGS AND CONCLUSIONS PHASE 4: Future L&D System Architecture

Executive Briefing PROJECT PURPOSE PHASE 4: Future L&D System Architecture The purpose of this project is to Analyze and anticipate the learning needs of Retail Empire’s employees Assess the capabilities of the current Learning and Development System to meet the anticipated needs Propose a future-state Learning and Development System Develop an Implementation Plan to transition to the new system

Executive Briefing HIGH-LEVEL L&D SYSTEM ARCHITECTURE PHASE 4: Future L&D System Architecture