Matching Injector To Linac. Caveats This is all loose and fuzzy – sort of religion We dont have real tight control over and knowledge of the machine –

Slides:



Advertisements
Similar presentations
Emittance dilution due to misalignment of quads and cavities of ILC main linac K.Kubo For beam energy 250 GeV, TESLA-type optics for 24MV/m.
Advertisements

5/3/2015J-PARC1 Transverse Matching Using Transverse Profiles and Longitudinal Beam arrival Times.
MCDW 2008, JLAB, Dec 8-12, Multi-pass Droplet Arc Design Guimei WANG (Muons Inc./ODU) Dejan Trbojevic (BNL) Alex Bogacz (JLAB)
1 ILC Bunch compressor Damping ring ILC Summer School August Eun-San Kim KNU.
Commissioning August & September. 2 Agenda 11:20 Coffee 11:30 Introduction Sue S 11:35 Controls (an overview) Brian M 10:55 Controls & Data Acquisition.
Author - Title (Footer)1 LINEAR LATTICE ERRORS AT THE ESRF: MODELING AND CORRECTION A. Franchi, L. Farvacque, T. Perron.
M. LindroosNUFACT06 School Accelerator Physics Transverse motion Mats Lindroos.
Wilson Lab Tour Guide Orientation 11 December 2006 CLASSE 1 Focusing and Bending Wilson Lab Tour Guide Orientation M. Forster Mike Forster 11 December.
Recirculating pass optics V.Ptitsyn, D.Trbojevic, N.Tsoupas.
Aperture Considerations in the FEL Upgrade Accepted design process –generate design  known –set aperture = N  + W N typically 4 to 6 W is “beam handling.
July 22, 2005Modeling1 Modeling CESR-c D. Rubin. July 22, 2005Modeling2 Simulation Comparison of simulation results with measurements Simulated Dependence.
BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnetic Specifications and Tolerances Weiming Guo, NSLS-II Project In this presentation I briefly introduced the.
Analysis of ATF EXT/FF Orbit Jitter and extrapolation to IP (Data of ) ATF2 Project Meeting K. Kubo.
Searching for Quantum LOVE at the Australian Synchrotron Light Source Eugene Tan On behalf of Rohan Dowd 120/10/2010Eugene Tan – IWLC 2010, Genega ASLS.
LCLS-II Transverse Tolerances Tor Raubenheimer May 29, 2013.
1 Lattice Measurement Jörg Wenninger CERN Accelerators and Beams Department Operations group May 2008 CERN Accelerator School : Beam Diagnostics, 28 May.
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
Eric Prebys, FNAL.  Let’s look at the Hill’ equation again…  We can write the general solution as a linear combination of a “sine-like” and “cosine-like”
Injector Setup/Mini-phase  Description of injector setup  sources of drift  Mini-phase procedure for injector  Checking the rest of the machine. Stephen.
March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 1 Low-Emittance Tuning Issues and Plans Yunhai Cai, Kiyoshi Kubo and Michael S. Zisman.
Y. Ohnishi / KEK KEKB-LER for ILC Damping Ring Study Simulation of low emittance lattice includes machine errors and optics corrections. Y. Ohnishi / KEK.
The Overview of the ILC RTML Bunch Compressor Design Sergei Seletskiy LCWS 13 November, 2012.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
J. Turner 02/07/05 SLAC PEPII Accelerator Physics LER WIGGLER PLAN J. Turner, M. Donald, M. Sullivan, U. Wienands, J. Yocky Motivation and Concerns Details.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
EMMA Horizontal and Vertical Corrector Study David Kelliher ASTEC/CCLRC/RAL 14th April, 2007.
1 FFAG Role as Muon Accelerators Shinji Machida ASTeC/STFC/RAL 15 November, /machida/doc/othertalks/machida_ pdf/machida/doc/othertalks/machida_ pdf.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
Optics considerations for ERL test facilities Bruno Muratori ASTeC Daresbury Laboratory (M. Bowler, C. Gerth, F. Hannon, H. Owen, B. Shepherd, S. Smith,
July 19-22, 2006, Vancouver KIRTI RANJAN1 ILC Curved Linac Simulation Kirti Ranjan, Francois Ostiguy, Nikolay Solyak Fermilab + Peter Tenenbaum (PT) SLAC.
Bruno Muratori (for the EMMA team) STFC, Daresbury Laboratory EMMA commissioning 02/09/08.
Vertical Emittance Tuning at the Australian Synchrotron Light Source Rohan Dowd Presented by Eugene Tan.
June 2006LHCCWG / J. Wenninger1 Orbit response measurements and analysis J. Wenninger AB-OP Principle Software status Example from SPS ring and lines Potential.
1 EMMA Tracking Studies Shinji Machida ASTeC/CCLRC/RAL 4 January, ffag/machida_ ppt & pdf.
Y. R. Roblin Hall A beamline and accelerator status.
LER Workshop, October 11, 2006LER & Transfer Line Lattice Design - J.A. Johnstone1 LHC Accelerator Research Program bnl-fnal-lbnl-slac Introduction The.
By Verena Kain CERN BE-OP. In the next three lectures we will have a look at the different components of a synchrotron. Today: Controlling particle trajectories.
Advanced Optics Control, CERN, Masamitsu Aiba, PSI Recent optics measurements at SLS M. Aiba, M. Böge, Á. Saá Hernández, D. Mayilyan and.
… Work in progress at CTF3 … Davide Gamba 01 July 2013 Study and Implementation of L INEAR F EEDBACK T OOLS for machine study and operation.
Beam Based Optics Measurements CTF3 Collaboration meeting CERN Yu-Chiu Chao, TJNAF.
DRAFT: What have been done and what to do in ILC-LET beam dynamics Beam dynamics/Simulations Group Beijing.
Tools in CTF3 Simona Bettoni for the CTF3 operation team.
Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz,
Corrections for multi-pass eRHIC lattice with large chromaticity Chuyu Liu ERL workshop 2015 June 7, 2015.
11/18/2004 FNAL Advanced Optics Measurements at Tevatron Vadim Sajaev ANL V. Lebedev, V. Nagaslaev, A. Valishev FNAL.
A.Saini, K.Ranjan, N.Solyak, S.Mishra, V.Yakovlev on the behalf of our team Feb. 8, 2011 Study of failure effects of elements in beam transport line &
Experience with Novosibirsk FEL Getmanov Yaroslav Budker INP, Russia Dec. 2012, Berlin, Germany Unwanted Beam Workshop.
Progress in CLIC DFS studies Juergen Pfingstner University of Oslo CLIC Workshop January.
Ultra-low Emittance Coupling, method and results from the Australian Synchrotron Light Source Rohan Dowd Accelerator Physicist Australian Synchrotron.
Beam Commissioning Adam Bartnik.
ILC DR Lower Horizontal Emittance, preliminary study
Orbit Response Matrix Analysis
Sextupole calibrations via measurements of off-energy orbit response matrix and high order dispersion Nicola Carmignani.
Beam Dynamics in Curved ILC Main Linac (following earth curvature)
Slice Parameter Measurements at the SwissFEL Injector Test Facility
Andrei Shishlo ORNL SNS Project Florence, Italy November 2015
Coupling Correction at the Australian Synchrotron
SuperB ARC Lattice Studies
ELENA Extra Low ENergy Antiproton Ring
Electron Rings Eduard Pozdeyev.
Orbit response measurements and analysis
MEBT1&2 design study for C-ADS
High Level Physics Applications for LCLS Commissioning
Optics Measurements in the PSB
Physics 417/517 Introduction to Particle Accelerator Physics
Update on MEIC Nonlinear Dynamics Work
Status and plans for crab crossing studies at JLEIC
G.H. Wei, V.S. Morozov, Fanglei Lin Y. Nosochkov (SLAC), M-H. Wang
JLEIC Electron Ring Nonlinear Dynamics Work Plan
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
Presentation transcript:

Matching Injector To Linac

Caveats This is all loose and fuzzy – sort of religion We dont have real tight control over and knowledge of the machine – functional modularity, beam based methods, etc => dial it in, rather than lock it down We have gotten it to work well enough to lase hard and reliably Yall are a test sample – well all try to figure out how to tell people what weve done and how it works – Ask questions – Give advice

Issues Inaccuracies/ambiguities in model-based predictions Drive laser variations Cathode model approximations Injector, accelerator magnets not well characterized – Field calibrations, current control – Field inhomogenieties Simplified field models in cavities – 3-d field details needed for accuracy – Gradient calibrations loose Can model trends very well, and values well - but only with extremely tight configuration control Must provide beam-based tuning algorithms

Methodology Set phases (spectrometer, miniphase) Calibrate model – Quads dont set with good precision – Use difference orbits to check focusing – Modify model to produce agreement with observation Change magnet (usually quad) set-points to make model match reality Perform multi-monitor emittance measurement – Gives notional beam properties at front end of machine Rematch – Resets beam properties to fit within downstream acceptance

Machine Model Analysis of beam and accelerator properties requires a means of evaluating transfer matrix elements, beam envelopes, etc Typical machine models are home-brewed, machine specific, but generally are – based on matrix-multipliers – Read parameters directly from the machine – Run fast – Have a high degree of interactivity Can modify easily Pull in/push out data Optimize optics solutions, orbit corrections, etc

Difference Orbits When we phased, we zeroed the BPMs and looked at the effect of changing phase – The signature was the change in position at the spectrometer observation point Method works for other parameters: zero the BPMs and see what happens when we kick beam Can be used to establish transfer matrix elements (esp. M 12, M 34, M 62, …) – Twiss parameter representions (betatron amplitudes) – Phase advance – Momentum compactions M 55,T 555, … Basic method: – Zero BPMs – Change something and look at response Corrector (M 12, M 34 ) Beam energy (M 16 ) Injection phase (M 55, T 555, …) Analysis of data can – Set BPM scale factors – Trap focusing errors (quad, dipole, screwdrivers, allen wrenches…) – Measure/correct compactions This measurement characterizes the lattice - and helps you use the lattice to measure the beam

Multi-monitor Emittance Measurements Beam envelopes at an observation point are defined by their value at some upstream reference + the transfer matrix If the transfer matrix (matrices) are known, can measure spot sizes at several (more than three) places and determine beam envelopes and emittance Form sum of square deviations between projection & observation, and minimize by varying injected betas

Rematch After fitting initial beam envelopes to reproduce in model observed spot sizes, you can see the propagated Twiss parameters Adjust quads to make real betas match design acceptance values Iterate: – Remeasure, check propagated envelopes, see if agreement improves

The Dread Matchathon Wailing, cursing, gnashing of teeth… Apply same process to – linac-to-arc match, – dispersion management in arc(s), – arc-to-wiggler match, – momentum compaction (M 55, T 555 ) for bunch length compression, – wiggler-to-arc match, – arc-to-linac (reinjection) match, – energy compression (M56, T566, W5666), Iterate Then trim for loss suppression as you boot-strap lasing

To Consider Beam is very irregular – must consider just what you match on – Full beam size (stuff all the electrons through tight apertures) – Sigmas – fit to gaussian – Rms beam size Usually worry about the 1 st Hard to associate which gaussian goes with which other when you march down the line