Georgia Inert Landfill Regulations

Slides:



Advertisements
Similar presentations
LEGISLATIVE UPDATE Robert A. Tardif, P.E., Administrator Subsurface Systems Bureau New Hampshire Department of Environmental Services.
Advertisements

Department of Environmental Protection CLEAN FILL POLICY
Certification of Compliance By Evita Lagard
Role of Activity & Use Limitations in Clean Energy Development at Disposal Sites Elizabeth Callahan Acting Division Director, Policy and Program Planning,
Chapter F.A.C. Updates F. Thomas Lubozynski, P.E. Waste Program Administrator.
 ideally the disposal methods should meet the following condition:  environment friendly  cause no health hazard  economically less demanding  maximum.
EPA CONSTRUCTION & DEVELOPMENT EFFLUENT LIMITATIONS GUIDELINES Tim Ryan, P.E. Water Resources Engineer Water Resources Engineer Wisconsin Department of.
Environment Engineering I
2011 Changes to Solid Waste Management Act. Solid Waste Stats (FY10) million tons disposed in MSW landfills ▪16.5% of waste disposed in MSWs is.
CE 326 Principles of Environmental Engineering Prof. Tim Ellis February 4, 2008 Municipal Solid Wastes
S-1925 Subsection t Stakeholder Meeting November 9, :30-2:30pm NJDEP Public Hearing Room 1 st Floor, 401 East State Street Trenton, NJ.
EXAMINATION OF MODERN SANITARY LANDFILLS W. Gregory Vogt Chair, Sanitary Landfill Working Group, ISWA Vice President, SCS Engineers.
On-site Sewage Facility (OSSF) Trends in Texas
Ohio’s Solid Waste and C&DD Program Annual Meeting May 9, 2013 Ohio’s Composting Program Barry Chapman and Jen Hagar.
Mid-Florida Materials (MFM) (Division of Hubbard Construction) C&D Debris Disposal Facility Renewal of C&D Permit.
SPDES General Permit for Stormwater Discharges During Construction Activity GP Mike Jurkowski, CPESC, NYSDOT - Summary of Changes From GP
Chapter F.A.C. Updates Solid Waste Program.
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN PLANNING APPROACH Issued May 2009 Level II: Introduction to Design Education and Certification for Persons.
EnE 301: ENVIRONMENTAL ENGINEERING
Overview of Regulatory Changes, Policy and Implementation Colleen Brisnehan Colorado Department of Public Health And Environment Hazardous Materials and.
Creating a Storm Water Pollution Prevention Plan For Construction Activities.
CCR Final Rule Utility Perspective on Key Compliance Items
Idaho Solid Waste Facility Record Keeping June 20, 2006 Idaho Department of Environmental Quality.
Renewable Energy at Closed Landfills Workshop: Landfill Post Closure Use Permitting Guidelines January 19, 2010 Daniel Hall, Solid Waste Section Chief.
SMALL CONSTRUCTION STORMWATER PERMITTING. STORMWATER GENERAL PERMIT FOR SMALL CONSTRUCTION ACTIVITIES Construction activities regulated under this permit.
David Dippel, P.G. Frank Zeng, P.E. Waste Permits Division Municipal Solid Waste Permits Section 2015 TCEQ Environmental Trade Fair.
Adem.alabama.gov ADEM Land Division Update Chip Crockett Chief, Industrial Hazardous Waste Branch Air & Waste Management Association Southern Section Pine.
October Mary Louise Hendrickson Solid Waste Section – Technical Lead
Renewable Energy at Closed Landfills Workshop: Landfill Post Closure Use Permitting Guidelines June 17, 2009 Mark Dakers, Environmental Analyst Massachusetts.
Lynne Welsh Massachusetts Department of Environmental Protection.
Cumberland Park CCB Project Virginia Department of Environmental Quality October 9, 2007.
 Storm Water Pollution Prevention Plan (SWPPP)  All dischargers over 1-acre must develop a SWPPP  6 major portions of every SWPPP Site Evaluation and.
Solid Waste Management Plans Update Webinar Training March 5, 2014.
Corrective Action Program: Working with Your Local Agency to Solve Local Problems James Clay County of San Diego Department of Environmental Health Site.
Proposed Amendments to Chapter 32 Article V Solid Waste Management and Chapter 38 Zoning 5:01 P.M. Public Hearing Presented by the Orange County Environmental.
Landfill Odor Action Plan Utilities Department October 6,
1 Draft Final Safe Fill Regulations Major Changes/Revisions Presented to the CSSAB November 8, 2002.
Department of Environmental Quality Life-of-Site Permitting Required Changes to Solid Waste Management Rules 15A NCAC 13B March 10, 2016.
Missouri Waste Control Coalition Environmental Conference July 14, 2015 CCR Rule What Location Restrictions Mean for Missouri.
Urban Runoff Pollution Ordinance 2017 Proposed Update
Chapter Nineteen: Waste
Department of Environmental Quality
permitting & compliance in hillsborough county
Upland Landfill Waste Discharge Application 7295 Gold River Highway
Lecture (5): Waste treatment and disposal
Numfon Eaktasang ,Ph.D Thammasat University
Homeowner Responsibility
LAND RECLAMATION MARVIN BOATRIGHT Land Reclamation Specialist
Landfilling in the Slovak Republic – legislation and actual situation
Division of Waste Management
Average person produces 1700 lbs of MSW per year
Solid Waste Handling Standards
Land Use and Zoning Committee Special Workshop
Sacramento County Stormwater Quality Program
Stormwater Management Program
Georgia Update Jeff Cown Land Protection Branch
Scientific or Engineered Landfilling of Waste
Municipal Solid Wastes (continued)
Ch. 19: Waste.
Municipal Solid Wastes
Overview of US EPA & State Manure Management Regulations
Homeowner Responsibility
TPDES Construction General Permit Compliance
WASTE DISPOSAL No matter what processing is done, there will be some residue that needs to be disposed of safely Options for disposal Modern, engineered.
Solid and Hazardous Waste Chapter 21
Closure and Post-Closure
the path less traveled Termination of Post Closure Care
Sacramento County Stormwater Quality Program
Stormwater Construction General Pemit (CGP) TXR150000
Rule 5/6/13 Conversion to General Permits
Presentation transcript:

Georgia Inert Landfill Regulations The transition away from permit-by-rule status Michael Smilley, PG Golder Associates Inc. Atlanta, Georgia

OUTLINE Background Permit-By-Rule Permit-By-Rule Result Amended Rules Potential Impacts of Regulations Important Dates Questions

BACKGROUND Thousands$ Millions$ Low Perceived Risk High Perceived Risk Inert Solid Waste Construction and Demolition (C&D) Waste Municipal Solid Waste (MSW) Hazardous Waste Cover Soil Reporting Site Controls Cover Soil Reporting Site Controls Monitor Explosive Gas Groundwater Post Closure Care Liners Cover Soil Reporting Site Controls Monitor Explosive Gas Groundwater Post Closure Care Liners Cover Soil Reporting Site Controls No Gas Requirements Groundwater Post Closure Care Double Liners Required Investment Thousands$ Millions$ Explosive Gas Monitoring! Not control! No Gas control at Haz. Change colors No treated wood in Inert MSW-, gas control, GHG Outside of Site Specific Considerations--- Inert Solid Waste: Waste with no active chemical or biological component….. Construction and Demolition Waste: Solid component of waste stream arising from construction and demolition waste. C&D waste is considered C&D waste as opposed to inert waste if it has between 5-25% maximum per volume of foreign materials (green wastes, plastics, electrical wiring, timber, paper insulation, tins, things like that) Municipal Solid Waste: Solid component of waste stream originating from mainly domestic but also commercial, industrial, governmental and public premises. Hazardous Waste: Waste that is listed or has characteristics defined by RCRA (resource conservation and recovery act)

BACKGROUND INERT SOLID WASTE LANDFILLS Earth-like products, concrete, cured asphalt, rock, bricks, yard trimmings and land clearing debris Not likely to produce leachate of environmental concern Liquid that percolates through or is generated by the decomposition of waste material Inert Solid Waste: Construction and Demolition Waste: Municipal Solid Waste: Hazardous Waste: No treated wood

PERMIT-BY-RULE PERMITTING OF INERT SOLID WASTE LANDFILLS IN GA Permit by rule provision (GA EPD 391-3-4.06) – since 1989 Notification within 30 days of operation Map Documentation from local jurisdiction of compliance with E&S Operational requirements Permitted Facilities Documented Online Over 2000 inert landfills in Georgia as of March 2011 (2285 based on 2011 list) Over 1100 inert landfills in Georgia as of August 2012 (1133 on EPD Database as of August 2012)

PERMIT-BY-RULE

Layers of Least Practical Volume PERMIT-BY-RULE Inert Waste Only Property Line Layers of Least Practical Volume 1’ Cover Soil Grading Final Cover – 2’ 100’ Buffer In addition to notification, permit-by-rule facilities must follow the following rules: Only accept inert waste – earth and earth-like products, concrete, cured asphalt, rock, bricks, yard trash, and land clearing debris are acceptable No portion of waste disposal area shall be within 100 linear feet of any property line or enclosed structure Materials placed in inert waste landfills shall be spread in layers and compacted to the least practical volume. Clean earth cover no less than 1 foot depth shall be placed over all exposed inert material at least monthly The inert waste landfill shall be graded and drained to minimize runoff onto the landfill surface, to prevent erosion and to drain water from the surface of the landfill CLOSURE: A final cover of not less than 2 feet in depth of a vegetative cover shall be put in place not later than one month following final waste placement. DEED INCLUSION Waste Measurement

PERMIT-BY-RULE REGIONAL PERSPECTIVE (US EPA Region 4) Permit By Rule – Land Clearing and Inert Debris (LCID) Landfills (<2 acres) Permit By Rule – Structural Fill Landfills Clean Debris Land Clearing Debris General Permits http://water.epa.gov/scitech/swguidance/standards/criteria/nutrients/region04.cfm

PERMIT-BY-RULE RESULT - How common are these? - Recognized Environmental Condition (REC)?

PERMIT-BY-RULE RESULT Go slower No aerial

PERMIT-BY-RULE RESULT

PERMIT-BY-RULE RESULT PROPER CLOSURE??

PERMIT-BY-RULE RESULT ACCORDING TO EPD RECORDS: Proper closure - 225 1210 are individual subdivision lot inert waste pits that have been abandoned without notifying the homeowner. 1100 still operate or have failed to notify the EPD of closure. Fewer than 100 submit the quarterly disposal reports. Many other environmental impacts exist. CHANGE DATE!!!!!!!

PERMIT-BY-RULE RESULT Weatherwood Subdivision Evacuated 30 families after elevated methane levels were detected in homes. Methane levels were generated by a construction debris landfill under homes.

PERMIT-BY-RULE RESULT INERT WASTE REALITY Inert Solid Waste: Construction and Demolition Waste: Municipal Solid Waste: Hazardous Waste: Env. Sci. Technol. 1997, 31, 911-917

REQUIRES A PROFESSIONAL ENGINEER AMMENDED RULES NEW RULES FOR INERT LEVELS: Buffers Survey Controls Siting Requirements Explosive Gases Control Sequence of Filling (Documentation) Spreading/Compaction/Monthly Cover E&S Vegetation Fire Protection Limited Access Final grading Final Cover Post-Closure Care Insurance Requirements REQUIRES A PROFESSIONAL ENGINEER Amendment to Solid Waste Rules was made on January 23, 2013

Layers of Least Practical Volume AMMENDED RULES Inert Waste Only Property Line Layers of Least Practical Volume 1’ Cover Soil Grading Cover Monitor Explosive Gas 100’ Buffer Survey Controls Siting – shall not be located in wetlands or floodplains and 5 feet of the permanent water table. (from waste) Explosive Gas Control Planning Reporting

AMMENDED RULES Survey Controls Siting – shall not be located in wetlands or floodplains and 5 feet of the permanent water table. Explosive Gas Control Planning Reporting

AMMENDED RULES Survey Controls Siting – shall not be located in wetlands or floodplains and 5 feet of the permanent water table. Explosive Gas Control Planning Reporting

AMMENDED RULES TOTAL ADDITIONAL COSTS Published estimated by Hawkinsville City Manager – $150,000 initially and $12,000 per year. Post-Closure Care The design must provide post-closure care for 30 years. Can be reduced but cannot be less than 5 years. http://www.romenews-tribune.com/view/full_story/18906698/article-Inert-landfill-operators-object-to-rule-change?instance=home_news_lead_story

AMMENDED RULES GEORGIA HOUSE BILL 320 Subsection (k) – Any inert waste landfill which, as of January 1, 2014, has been certified by a professional engineer registered in accordance with Chapter 15 of Title 43 as being in full compliance with all permit by rule requirements established in the rules and regulations of the division as they existed on January 1, 2012, may continue to operate under such permit by rule requirements. Yea – 159 Nay – 8 Not Voting – 8 Excused - 5

AMMENDED RULES Inert Landfill Compliance Certifications PE will review the historical facility documents and certify compliance. “ I ________ (certifying P.E.) certify that the inert landfill listed above is/was in compliance with the following sections of the Rules for Solid Waste Management in Georgia (Rules), as they existed on January 1, 2012….”

AMMENDED RULES INFORMATION REQUIRED DURING SUBMISSION Copy of required initial notification Assurance that only earth-like products….placed in landfill. 100 feet of property line or structure [Survey Plan] Field evaluation concerning layering of materials [photos] Grading and drainage plans Fire prevention measures Copies of all tonnage reports Other documents demonstrating compliance [zoning, erosion and sediment control plans; NPDES; community affairs regional impact. September 18, 2018

AMMENDED RULES ? New Inert Landfills Existing Inert Landfill [In Compliance] Existing Inert Landfill [Out of Compliance] ? Certification Submittal [December 31st 2013] DENIED APPROVED Cease Accepting Waste [December 31st 2013] NEW RULES OLD RULES Survey Controls Siting – shall not be located in wetlands or floodplains and 5 feet of the permanent water table. (from waste) Explosive Gas Control Planning Reporting Complete Closure [June 1st 2015]

POTENTIAL REGULATION IMPACTS POTENTIAL IMPACTS Operator Opinion: Takes many existing inert landfills out of compliance Makes them cost prohibitive Increases incentive for illegal dumping EPD Opinion: Decreases the number of inert solid waste operators Emphasizes the beneficial reuse of materials Market opportunities for waste companies? have no portion of the waste disposal boundary located within one hundred (100) linear 1. Buffers: facilities which have previously operated under permit by rule status shall feet of any property line or enclosed structure. Any areas permitted under this provision shall have no portion of the waste disposal boundary within two hundred (200) linear feet of any property line or enclosed structure. After April 1, 2014, no inert waste shall be placed within 200 linear feet of a property line or enclosed structure. 2. Survey Control: site survey control shall be provided to ensure the operation will be on permitted lands. Survey control will be accomplished through use of permanent, accessible benchmarks, survey control stakes, and/or boundary markers which designate and/or delineate all permitted areas. Survey control shall be as indicated on the design and operational plan. Where necessary for construction or operational purposes, vertical as well as horizontal survey control will be established and maintained to delineate fill boundaries, buffers, and property boundaries 3. Siting: waste shall not be located in wetlands or floodplains, and waste shall not be placed within five feet of the permanent water table. A demonstration must be included in the design and operational plan on how these requirements will be met. 4. Explosive Gases Control: the plan must implement a routine methane monitoring program to ensure that the concentration of methane gas generated by the facility does not exceed 25 percent of the lower explosive limit for methane for on-site enclosed structures and does not exceed the lower explosive limit for methane at the facility property boundary. The type of monitoring must be determined based on the following factors: soil conditions; the hydrogeologic conditions surrounding the facility; the hydraulic conditions surrounding the facility; and the location of facility structures and property boundaries. The minimum frequency of monitoring must be quarterly. If methane gas levels exceeding the limits specified in this section are detected, the owner or operator must: immediately take all necessary steps to ensure protection of human health and notify the Director; within seven days of detection, place in the operating record the methane gas levels detected and a description of the steps taken to protect human health; and within 60 days of detection, implement a remediation plan for the methane gas releases, place a copy of the plan in the operating record, and notify the Director that the plan has been implemented. The plan shall describe the nature and extent of the problem and the proposed remedy. 5. Sequence of Filling: the plan must define a sequence of filling showing a detailed progression of filling the entire site that minimizes any problems with drainage and all weather access roads to the working face. 6. Spreading/Compaction/Monthly Cover: materials placed in inert waste landfills shall be spread in layers and compacted to the least practical volume; and, a uniform compacted layer of clean earth cover no less than one (1) foot in depth shall be placed over all exposed inert waste material at least monthly. 7. Erosion and Sedimentation Control: all surface runoff from disturbed areas must be controlled by use of appropriate erosion and sedimentation control measures or devices. Best management practices (BMP’s) from the Manual for Erosion and Sediment Control in Georgia should be utilized. 8. Vegetation: the plan must call for the vegetation of any disturbed area that will remain exposed for more than three (3) months. Vegetation of final cover must take place within two (2) weeks after final cover placement. 9. Fire Protection: suitable means shall be provided to prevent and control fires. Stockpiled soil is considered to be the most satisfactory fire fighting material. A minimum of one month of cover material must be maintained within 200 feet of the working face for fire fighting purpose, unless other acceptable means have been provided and approved by the Director. 10. Limited Access: access to inert waste landfills shall be limited to authorized entrances which shall be closed when the site is not in operation. 11. Final Grading: the inert waste landfill site shall be graded and drained to minimize runoff onto the landfill surface, to prevent erosion and to drain water from the surface of the landfill. The grade of the final surface of the facility may not be less than 3 percent nor greater than 33 percent. 12. Final Cover: a uniform compacted layer of final cover not less than two (2) feet in depth and a vegetative cover shall be placed over the final lift not later than one month following final placement of inert waste within that lift.

POTENTIAL REGULATION IMPACTS Recession Start* Recession End* Waste tonnage really never recovered with the market – especially in the Southeast. * National Bureau of Economic Research September 18, 2018

POTENTIAL REGULATION IMPACTS BENEFICIAL REUSE Composting Facilities Mulching Facilities Concrete Recycling Windrows at the ACC Commercial Compost Facility Waste tonnage really never recovered with the market – especially in the Southeast. September 18, 2018

POTENTIAL REGULATION IMPACTS UNKNOWNS Does the EPD have the capacity to oversee these changes? State budgets continue to shrink EPD office closures in Savannah and Columbus 920 employees in 2002 reduced to 852 in 2011 Proper closure?

SCHEDULE IMPORTANT DATES Deadline to receive compliance certification December 31, 2013 Deadline to stop accepting waste if you don’t receive a waste handling permit December 1, 2014 Deadline to complete closure of inert landfill if permit was not obtained June 1, 2015

? QUESTIONS? Turtle Mound Shell Midden http://upload.wikimedia.org/wikipedia/commons/7/7e/TurtleMound1915_ge0496.jpg