Gabriele Grea, Ines Österle, Carlo Vaghi Gruppo CLAS S.p.A.

Slides:



Advertisements
Similar presentations
WP4 – 4.1 and 4.2 Preparatory activities for the creation of the WATERMODE permanent network 1 Technical Committee Meeting Venice, June 24-25, 2010 VENETO.
Advertisements

Information and Communication Technologies (ICT) in the Seventh Framework Programme Support actions.
Looking forward Innovative ideas and how to take advantage of them 12 November 2013, Stuttgart, Germany Siegfried Rupprecht, Rupprecht Consult.
Introduction to CIVITAS‘ Definition of “Collective Passenger Transport“ and a Snapshot of its Results 13 September 2011 Brussels, Belgium Siegfried Rupprecht,
Action Plan on Urban Mobility
C-LIEGE Contract N°: IEE/10/154/SI Project duration: from 1 st June 2011 to 30 st November 2013 Date of creation: 4 th July 2011 Clean Last mile.
Sustainable Transport Management at Local Level: The ARCHIMEDES Project Mette Skamris Holm, City of Aalborg Coordinator ARCHIMEDES The Single Market Act.
Urban-Nexus – Integrated Urban Management David Ludlow and Michael Buser UWE Sofia November 2011.
V.I.D.E.O. Video-CVto Increase and Develop Employment Opportunities THE RESEARCH ACTIVITIES OF THE V.I.D.E.O. PROJECT Marco Merlini First Transnational.
January THE ISSUE Launch Event. Leicester. THE ISSUE Traffic- Health- Environment. Intelligent Solutions Sustaining Urban Economies. Professor.
Gzim Ocakoglu European Commission, DG MOVE World Bank Transport Knowledge and Learning Program on Intelligent Transportation Systems (ITS), 24/06/2010.
Michalis Adamantiadis Transport Policy Adviser, SSATP SSATP Capacity Development Strategy Annual Meeting, December 2012.
1 THE CITY OF TOMORROW AND CULTURAL HERITAGE Thierry PROST EUROPEAN COMMISSION - DG RTD Directorate I - Preserving the Ecosystem Tel: +32/2/ Fax:
Strategic Priorities of the NWE INTERREG IVB Programme Harry Knottley, UK representative in the International Working Party Lille, 5th March 2007.
Biofuels – EU policy context Funding and Legislation Workshops Glasgow, 26 May 2011 Francesca Giannini Scotland Europa.
1 DG Enterprise & Industry European Commission Conference on Better Regulation: Practical Steps Forward Reykjavík 6 June 2006 OVERVIEW OF THE BETTER REGULATION.
Sustainable Urban Transport Planning General Presentation.
Vincent LEINER Clean Transport and Sustainable Urban Mobility The EU, urban mobility and Sustainable Urban Mobility Plans.
EU Activities on Urban Mobility Franz-Xaver Söldner Clean Transport and Urban Transport European Commission EUROPEAN COMMISSION.
5 th ITU Green Standards Week Nassau, The Bahamas December 2015 Rethinking Smart Sustainable Cities from the Ground Up: Challenges and Opportunities.
SMARTSET Sustainable MARketdriven Terminal Solutions for Efficient freight Transport Contract Nr: IEE/12/714/SI Duration:
URBACT IMPLEMENTATION NETWORKS. URBACT in a nutshell  European Territorial Cooperation programme (ETC) co- financed by ERDF  All 28 Member States as.
Summary of the State of the Art of Programme Implementation CENTRAL EUROPE PROGRAMME Project development seminar Prague, 1-2 February 2010 Monika.
Turin Final Conference 25 September 2014 Work Group 1 Cordelia Koenig Ministry of Urban Development and Environment Hamburg Turin Final Conference 25 September.
United Nations Statistics Division Developing a short-term statistics implementation programme Expert Group Meeting on Short-Term Economic Statistics in.
The Small Business Act for Europe – general overview Wojciech SOPINSKI SME Policy Unit SBA conference -Belgrade 06/03/2012.
| 1 Franz Söldner – Urban Mobility Action Plan – 6th European Bus and Coach Forum, Kortrijk, 16 October 2009 Urban Mobility Action Plan Franz-Xaver Söldner.
SIMONA MURRONI Bruxelles - June 27th 2013 Bridging lessons learned from the past with new planning and delivery approaches in the energy sector.
Building an ENI CBC project
Smart Industrial Villages Support SMEs innovation and initiatives within Smart industrial villages, an approach for renovating traditional urban industrial,
Legal Aspects Related to Brownfield Regeneration
Herman Smith United Nations Statistics Division
Project Cycle Management
European Commission “Intelligent Energy for Europe”
Welcome to CIVITAS.
EERA e3s and Energy Consumers
EU Ambassador Cities. EU Ambassador Cities Manifesto on Citizen Engagement The Manifesto on Citizen Engagement is the outcome of a co-creation process.
BEST PRACTICES IDENTIFICATION
CENTRAL EUROPE PROGRAMME
Turin Final Conference 25 September 2014
EU Ambassador Cities. EU Ambassador Cities Manifesto on Citizen Engagement The Manifesto on Citizen Engagement is the outcome of a co-creation process.
What is €5 billion worth? Magda Gunn, IMI Scientific Project Manager.
Department of Myanmar Education Research
German-Uzbek STI Cooperation
The French National Agency on Water and Aquatic Environments
18th European Ecoinnovation Forum – Barcelona May 2015 OUTCOMES
Testing Innovative Strategies for Clean Urban Transport: CIVITAS Plus
MOSH Leading Practices Adoption System
URBACT III LAUNCH EVENT Brussels, 16 March 2015
Schoemaker, Laparidou, Oesterle, Menge, Aditjandra,
CRUE – The Way Forward Vicki Jackson
Supporting Cities and Regions through Projects and Programmes
Animal Welfare EU Strategy
Helene Skikos DG Education and Culture
Albania 2021 Population and Housing Census - Plans
Recent developments in the EU transport policy
Towards a European Qualifications Framework for Lifelong Learning
EU Marine Strategy DG Environment B.1.
Information on projects
Fitness Check EU Water Policy
Pilot River Basin Water Framework Directive.
Towards a Work Programme for the Common Implementation Strategy for the Water Framework Directive (2000/60/EC) Water Directors Meeting 28 November.
FINANCING NATURA 2000 Agenda item 2.1 CGBN Co-ordination Group
Welcome to CIVITAS.
WORKSHOP “Emerging environmental pollutants: key issues and challenges” Stresa, Italy June 2006.
7th Environment Action Programme to 2020 Living well, within the limits of our planet Evaluation - COM (2019) May 2019.
SUSTAINABLE ENERGY SUPPLY
DG Environment, Unit D.2 Marine Environment and Water Industry
Civil Society Facility and Media Programme Call for proposals: EuropeAid/162473/DH/ACT/Multi Webinar no. 3: Preparing effective Concept Note.
Andrea Tilche Unit Head of the Water Key Action
Presentation transcript:

The involvement of stakeholders to define efficient and sustainable City Logistics solutions in Como Gabriele Grea, Ines Österle, Carlo Vaghi Gruppo CLAS S.p.A. XV Conference of the Italian Association of Transport Economics and Logistics (SIET) Venice - September 18-20, 2013

Contents FP 7 project Smartfusion Smartfusion activities in Como (IT) Design and Monitoring framework methodology DMF design process in Como Organisation of the process and main results Conclusions 18/09/2018

1. Smartfusion – project overview Main objective: to develop and demonstrate novel transport innovations that will improve the efficiency, as well as social and environmental sustainability, of urban freight operations and the related urban- interurban shipment processes Focus lies on the question of how to increase the market share of “green” vehicles and of their technical and logistical feasibility Co-funded under the 7th EU Framework programme April 2012 - March 2015 Private Public Partnership: 14 partners from 7 countries project is a private-public partnership linked to the European Green Car initiative

1. Smartfusion – outputs Innovations and development in 4 areas green vehicle technologies planning and routing devices for low emission vehicles urban consolidation centres urban freight policies Demonstrations of the innovations in a local context in 2014: Como (IT), Berlin (DE) and Newcastle (UK) Impact Assessment Transferability (Smart Urban Freight Designer) To deliver innovations: to advance beyond the state-of-the-art in four key innovative aspects fully electrical vehicles and second generation of hybrid truck technology reorganisation of logistics processes with an Urban Consolidation Centre The main project output will be a Smart Urban Freight Designer tool, that will allow to analyze the likely success and benefits of applying green vehicle technologies in any other European city-regions and supply chains. An improved impact assessment framework that links business with sustainability criteria for the demonstrated solutions will be applied. 18/09/2018

2. Demonstrations of the innovations in a local context: the case of Como Demonstration and test of full electric vehicle (short trial period) new routing system adapted to clean vehicles (extended trial period) modified UCC “Merci in Centro” (permanent) urban freight policies: change of the access rules to the city centre (permanent) The four elements are combined to increase the use of clean vehicles in the city centre and to tranship more goods through the UCC “Merci in Centro” Application of a logical framework approach for fine-tuning the demonstration to adapt to the local conditions

Como “convalle” - Route goes from the UCC currently used by Merci in Centro to the LTZ in Como - distance: 6-9 km

Como LTZ area (“città murata”)

3. Design and Monitoring framework approach Tool to design, implement, monitor and evaluate a project Designed and employed by the Asian Development Bank for development projects Methodology is a form of a Logical Framework Approach Key is the involvement of stakeholders in all stages of the project cycle The DMF methodology has been used in both ADB and World Bank development project and in European R&D projects. In Smartfusion the DMF methodology was used to best define and structure the demonstrations in Berlin, Como and Newcastle with the means of a highly-consultative process. Key to the DMF methodology is its participatory approach, involving stakeholders in all phases of the project from analysis and conceptualization through feasibility to final design and implementation. 18/09/2018

3. DMF: DMF design process and DMF matrix Four steps are needed to design the project and that are subsequentally carried out with the participation of the stakeholder: stakeholder analysis,… The stakeholder analysis aims to elaborate the stakeholder interests, perception of problems, available resources and mandates. The problem analysis engages the key stakeholder groups that were identified during the stakeholder analysis. It is aimed to identifying the major problem to be addressed by the project, the causes related to the problem as well as the effects caused by the problem on different levels. The next step is to translate the problem tree into an objectives tree, where the problems are transformed into objectives. As a result, the cause-effect relationship illustrated in the problem tree is transformed into a means-ends relationship. Finally, the alternatives analysis is carried out to identify alternative means of achieving the desired objective, assess the feasibility of each and agree on a project strategy. On the basis of the objective tree, the stakeholders agree on a objective of the project (the outcome), that may be the original main problem-turned-objective or an objective at a lower level on the problem tree. In reference to the selected project objective, stakeholders will then agree on the most appropriate means-ends branch(es) to reach this objective. However, achieving results is, to a large extent, dependent on stakeholder involvement, cooperation, and consensus. The participatory approach in developing the design and monitoring framework builds country ownership and helps to achieve results. 18/09/2018

4. DMF design process in Como Use of DMF approach in Como to fine-tune Smartfusion solutions (vehicle and ICT innovations, regulatory elements and UCC) Use of DMF approach to find consensus among stakeholders Four stakeholder consultation events in the past 12 months in order to go through the DMF design process Project design process planned on the basis of the publication from ADB (2007): Guidelines for Preparing a Design and Monitoring Framework 15 stakeholders involved in the DMF design process representing a local bus operator, freight forwarders and carriers, retailers and enterprises, citizens, public administrations, scientific bodies. I explain now step-by-step—the participatory process to develop the design and monitoring framework as we applied them in Como with reference to the guideslines issued by the. 18/09/2018

9/18/2018 Smartfusion

4. DMF design process in Como: 1. Stakeholder analysis (1) Analysis of stakeholders’ interests and perceived problems regarding freight transport in Como. 9/18/2018 Smartfusion

4. DMF design process in Como: 1. Stakeholder analysis (2) 18/09/2018

9/18/2018 Smartfusion

4. DMF design process in Como: 1. Problem analysis (1) Agreement on main problem regarding urban freight transport: Freight transport in Como is not sustainable and efficient Elaboration of causes and effects on different levels Desk analysis to elaborate problem tree 9/18/2018 Smartfusion

4. DMF design process in Como: 2. Problem analysis (2) 18/09/2018

4. DMF design process in Como: 2. Problem analysis (3) 18/09/2018

4. DMF design process in Como: 4. Alternatives analysis (1) “Concertation” process to agree on regulatory and organisational details of the demonstration 9/18/2018 Smartfusion

4. DMF design process in Como: 4. Alternatives analysis (2) Compilation of questionnaire: 13 questions regarding organisation of UCC and access rules to city centre: e.g. Where should the UCC be located? What kind of freight should the UCC service focus on? Do you agree that the UCC vehicles should be exempted from the LTZ? 9/18/2018 Smartfusion

Application to Smartfusion: 4. Alternatives analysis (3) 9/18/2018 Smartfusion

4. DMF design process in Como: 4. Alternatives analysis (3) 1st round of “concertation”: 4 work groups 2nd round of “concertation”: plenary discussion Outcomes from 2nd round “concertation”, include: Range of services by UCC: collection/pick-up (besides delivery) desired by stakeholders. It should be checked if storage area for shopkeepers could be made available at UCC. Last-mile delivery price: some stakeholders estimated 2,50 - 3 Euros/100 kilo as a suitable and competitive market price. Stakeholders agree prevalently to extend the geographic area of the LTZ, but gradually and only after concertation process with shopkeepers. Stakeholders agree prevalently to exempt ecologic vehicles of Merci in Centro from the LTZ ordinance. 9/18/2018 Smartfusion

4. DMF design process in Como: Conclusions (1) Stakeholder analysis: Main emphasis of interests differ, but widespread interest among stakeholders for increasing efficiency and sustainability of urban freight transport. Problem analysis: Unanimous consensus on inefficiency of urban freight system. DMF process: project design process does not focus on the verification of stakeholders’ problem perception, but this should not be omitted. Alternatives analysis: Wide-spread consensus reached for a range of issues. DMF process: Alternatives analysis had to be adapted from ADB approach because the solutions were pre-defined by the Smartfusion project.

4. DMF design process in Como: Conclusions (2) General: Loyalty to the ADB DMF approach: high, beside objectives analysis omitted and alternatives analysis adapted due to time reasons and predefined Smartfusion elements Time-consuming process: additional meetings had to be scheduled High commitment from stakeholders: expectation that the impacts of the Smartfusion trial in Como will reach beyond the project period due to a strong political support neutral lead of the process (coordinators Gruppo CLAS) Variety of stakeholders: Some key stakeholders could not get involved, but still high variety of stakeholders Consensus: high among stakeholders regarding need for action; widespread interest to increase efficiency and sustainability of freight transport in Como

Thank you for your attention! Contact details: Ines Österle i.oesterle@gruppoclas.it Gabriele Grea g.grea@gruppoclas.it Carlo Vaghi c.vaghi@gruppoclas.it 18/09/2018