PUBLIC HEARINGS ON THE DIVISION OF REVENUE BILL

Slides:



Advertisements
Similar presentations
Rolling out the Strategic Framework for Water Services Mike Muller: DG: DWAF SALGA and DWAF Water Summit 17 October 2003.
Advertisements

Regional Bulk Infrastructure Grant / Programme (RBIG) Grant and Policy
BUCKET ERADICATION PROGRESS SELECT COMMITTEE ON LAND AND ENVIRONMENTAL AFFAIRS HEARINGS 22 & 23 February 2007 Presented by Ms. T. Mpotulo Department of.
Water Services Bulk Infrastructure Programme January 2008.
Department of Water Affairs and Forestry SELECT COMMITTEE INTERGOVERNMENTAL FISCAL REVIEW CHAPTER 10:WATER & SANITATION 6 September 2004.
1 Outcome of Conditional Grants & Capital Expenditure as at 30 November 2005 [Section 40(4) of PFMA] Select Committee on Finance National Council of Provinces.
1Confidential and Not for Publication PROGRESS ON DELIVERY AGREEMENT FOR OUTCOME 8: SUSTAINABLE HUMAN SETTLEMENTS AND IMPROVED QUALITY OF HOUSEHOLD LIFE.
Municipal Water Infrastructure Grant Standing Committee on Appropriations Presenters: Marissa Moore and Steven Kenyon | National Treasury | 5 March 2013.
REPORTING, MONITORING AND PERFORMANCE EVALUATION PROVISIONS ON NON-FINANCIALS – 2013/14 1 MIG Quarterly Workshop 3 – 4 September 2013.
Briefing on Progress made with regard to Prevention and Management of Child Abuse and Neglect Especially Child Sexual Abuse Presentation at the Portfolio.
1 Water Services to Schools and Clinics Programme 20 June 2007 Presentation to Select Committee on Education and Recreation By DWAF.
DCoG Presentation to the Appropriations Committee HEARINGS ON THE MEDIUM TERM BUDGET POLICY STATEMENT 2 November 2010.
1 Presentation to the Portfolio Committee: Water & Environment Presentation by Mr Trevor Balzer Programme Manager: Special Projects 16 – 17 March 2010.
Sport Infrastructure Grant. Pre-2004 there was a national grant for municipal sports infrastructure managed by SRSA This funding was incorporated into.
Themba Wakashe Director - General Department of Arts and Culture 2009 / 10 DIVISION OF REVENUE BILL PRESENTATION TO SELECT COMMITTEE ON FINANCE NCOP 3.
DEPARTMENT OF EDUCATION EDUCATION INFRASTRUCTURE PROGRAMME OF ACTION Portfolio Committee Presentation Cape Town 15 February 2005.
1 Department of Water Affairs and Forestry PRESENTATION TO SELECT COMMITTEE ON FINANCE – DoRA & CONDITIONAL GRANTS Presented by DWAF 12 March 2002 Water.
1 Local Government Budgets and Expenditure Review 2001/02 – 2007/08.
NATIONAL DEPARTMENT OF HEALTH National Health Insurance Grant Select Committee on Appropriations Hearing on 3 rd and 4 th Quarter Expenditure 4 th June.
INSTITUTIONAL REFORM OF WATER SERVICES PROVISION Portfolio Committee on Water Affairs and Forestry 22 June 2005 V.227.
QUARTERLY PERFORMANCE OF THE MUNICIPAL INFRASTRUCTURE GRANT (MIG) – 2005/06 AND 2006/07 FINANCIAL YEARS Presentation to the Select Committee On Finance.
Presentation to the Portfolio Committee on Provincial & Local Government Branch: Free Basic Services and Infrastructure Mr Yusuf Patel 19 ~ 20 February.
Public Hearings on Division of Revenue Bill, 25 February 2009 Presentation by Department of Water Affairs and Forestry 1.
Parliamentary submission on the eradication of the Bucket Toilet System 22 & 23 February 2007 Cllr. Derrick Ndlovu.
1 PORTFOLIO COMMITTEE PROGRESS REPORT NATIONAL SANITATION TASK TEAM 31 August 2005.
1 Regions strategic outputs Presented by Ms T Mbassa Deputy Director- General Department: Water Affairs (DWA) 12 August 2009.
INSTITUTIONAL REFORM OF WATER SERVICES PROVISION
DEPARTMENT OF COOPERATIVE GOVERNANCE AND TRADITIONAL AFFAIRS PORTFOLIO COMMITTEE ON SPORTS AND RECREATION 4 August Plein Street.
Municipal Water Infrastructure Grant (MWIG)
Portfolio committee May 2007 MEC JF van Wyk
Eastern Cape :2016/17 Stopping Considerations
PRESENTATION TO THE PORTFOLIO COMMITTEE
Presentation by Department of Water Affairs
Legislation Constitution of the Republic of South Africa, 1996 (Act No. 108 of 1996) Housing Act No.107 of 1997 The Housing Consumers Protection Measures.
Parliament and the National Budget Process
Presentation to the Portfolio Committee: Water & Environment
DEPARTMENT OF WATER AFFAIRS & FORESTRY
Select Committee on Finance: DoR Bill- Public Hearing
Trevor Balzer: Acting CFO Helgard Muller : CD Water Services
SALGA Comments on LG Grants Division of Revenue Bill, 2011
Division of Revenue Bill 2008 [B4-2008]
MANDATE   The Housing Development Agency (HDA) has been established to facilitate and expedite the development of large scale integrated, sustainable human.
REVIEW AND IMPROVEMENT OF PED REPORTING SYSTEMS
Money Bills Amendment Procedure and Related Matters Bill [B 75–2008]
STRATEGIC FRAMEWORK FOR WATER SERVICES
Presentation by Department: Water Affairs 22 March 2011
PRESENTATION TO THE PORTFOLIO COMMITTEE ON WATER AFFAIRS AND FORESTRY
2016/17 STOPPING & REALLOCATION CONSIDERATIONS: OR Tambo District Municipality 06 June 2017.
PRESENTATION ON THE CONDITIONAL GRANT TO THE SELECT COMMITTEE
Portfolio Committee On Sports and Recreation 7 November 2017
27 November 2018 PRESENTATION ON THE CONDITIONAL GRANT TO THE SELECT COMMITTEE ON APPROPRIATION 16 MAY 2018 MANCO.
2018/19 ANNUAL PERFORMANCE PLAN FOR MISA
Deputy Director- General: Regions Department: Water Affairs (DWA)
Select Committee on Finance Water Services Operating and Transfer Subsidy 10 May 2006 Department of Water Affairs and Forestry Jabulani Sindane : DG Trevor.
Select Committee on Finance National Council of Provinces
PROGRAMME 3 WATER SERVICES
PRESENTATION TO THE SELECT COMMITTEE ON APPROPRIATIONS
PRESENTATION TO THE STANDING COMMITTEE ON APPROPRIATION
Select Committee on Appropriations Dinaledi Schools Grant, 3rd and 4th quarter Expenditure /13 Presenter: Edgar Sishi | Chief Director – Provincial.
Progress on the Bucket Eradication Programme
Provincial Budgets and Expenditure as at 31 March 2008: Housing and Local Government 2007/08 Financial Year NCOP 20 May 2008.
PROGRESS REPORT ON THE RURAL HOUSEHOLD INFRASTRUCTURE PROGRAMME (RHIP) 17 AUGUST 2012 By MR T ZULU DIRECTOR GENERAL.
Water Services Targets
BRIEFING THE PORTFOLIO COMMITTEE OF WATER AND SANITATION
PROGRAMME 2 CONT - NATIONAL WATER RESOURCES INFRASTRUCTURE BRANCH.
DEPARTMENT OF HEALTH AND SOCIAL SERVICES
Director-General: Mr. E Africa
PRESENTATION TO THE PORTFOLIO COMMITTEE ON WATER AFFAIRS AND FORESTRY
PRESENTATION ON THE CONDITIONAL GRANT TO THE SELECT COMMITTEE
PORTFOLIO COMMITTEE ON HUMAN SETTLEMENT UPDATE ON ACCREDITATION
Presentation transcript:

PUBLIC HEARINGS ON THE DIVISION OF REVENUE BILL Select Committee on Finance 7 March 2007 PUBLIC HEARINGS ON THE DIVISION OF REVENUE BILL

DOR Bill Comments This presentation will focus on the following: Comments on certain clauses in the DoR Bill Ring-fenced allocation in MIG for bucket sanitation The new Water Services Regional Bulk Infrastructure Grant (WSRBIG), The new Water Services to Schools and Clinics Grant. The Water Services Operating Subsidy.

DOR Bill Comments: clauses 20 &23 DWAF engaged with National Treasury on DoR Bill and want to thank NT for accommodating the DWAF suggestions in Section 20.(Bulk WS Grant) Section 23 (2) (a) still creates a serious problem for DWAF because it will hamper the monitoring and oversight role—all around the principle of project registration. The Bill says “may” but with such conditions that project registration may not happen in practice. Sect 25 (b) Motivation for project registration: MIG is a conditional grant and as required by the Bill, the transferring officer must ensure compliance of the conditions in partnership with sector departments. Professional project management requires knowledge of projects. Sector targets and goals with the associated management demands knowledge of projects. Regulatory role of DWAF requires knowledge to ensure performance e.g. access to basic services, drinking water quality etc. The present format and existence of this section forbids and undermines these actions by the transferring officers and sector departments

DOR Bill Comments Why project registration? Project registration is not an approval by DWAF In order to measure performance and ensure that conditions are in place DWAF must “know” about a project and have the details of such a project. It will be impossible to measure performance against the water and sanitation backlogs without a register of such projects. It gives a practical window for DWAF to exercise the Minister’s responsibility to ensure that municipalities address the backlogs. It also makes it possible for the Minister to report on progress-without registration it would be impossible to report especially to Parliament. Cabinet Lekgotla confirmed that DWAF should be more hands-on in order to ensure that targets are met. Sect 25 (b) Motivation for project registration: MIG is a conditional grant and as required by the Bill, the transferring officer must ensure compliance of the conditions in partnership with sector departments. Professional project management requires knowledge of projects. Sector targets and goals with the associated management demands knowledge of projects. Regulatory role of DWAF requires knowledge to ensure performance e.g. access to basic services, drinking water quality etc. The present format and existence of this section forbids and undermines these actions by the transferring officers and sector departments

Conditional Grants Ring-fenced Bucket Eradication (last year and part of MIG) Bulk Infrastructure (New and not part of MIG) Schools and Clinics Water & Sanitation (New) Operating Subsidy

Summary of Conditional Grants over MTEF period Bucket Eradication R 1,000 billion Bulk Infrastructure R 1,400 billion Schools and Clinics R 0,665 billion Total for the 3 Capital Grants :R 3,065 billion Operating Subsidy R 3,025 billion

Bucket eradication Ring-Fenced allocation in MIG Multi year allocation: 2006/07 - R400 m 2007/08 - R1 000 m Targets for the MTEF Eradicate all remaining buckets (132 671), by Dec 2007

Bucket eradication Specific conditions: The allocation is for bucket eradication in established areas (i.e. formal townships). Expected outputs: - Eradication of all buckets in established areas by Dec 2007

Bucket eradication Specific Challenges: Community expectations (VIPs vs waterborne) Inadequate water resource & bulk sewerage infrastructure to support waterborne sanitation Procurement processes of municipalities (take time to appoint contractors) Unavailability of local contractors due to many infrastructure projects underway

Bucket eradication progress Province Feb 2005 backlog Buckets eradicated April 05 March- 06 Buckets April 06-June 06 Buckets Eradicated (July 06-Sep 06) Buckets eradicated Oct 06-Dec 06 Buckets eradicated Jan 2007 Backlog ( as at end Jan 2007) EC 48,417 11,742 13,154 4,200 2,691 16,630 FS 127,658 16,685 8,831 5,768 1,120 6,463 88,791 GT 5,169 3,844 200 1,125 KZN 750 LP 80 MP 15,172 11,737 3,435 NW 35,189 8,220 670 3,449 2,744 232 19,874 NC 16,691 8,221 1,149 950 1,649 107 4,615 WC 3,128 927 332 223 10 1,636 Total 252,254 62,206 24,136 18,002 8,427 6,812 132,671

Bulk Infrastructure What is Regional Bulk Infrastructure? The infrastructure required to connect the water resource, on a macro or sub-regional scale, (over vast distances), with internal bulk and reticulation systems. “Macro” is defined as large bulk infrastructure serving extensive areas across multi-municipal boundaries “Sub-regional” is defined as large bulk infrastructure serving numerous communities over a large area normally within a specific district or local municipal area.

Bulk Infrastructure Multi year Allocations Grant Conditions 2007/8 R300 million 2008/9 R450 million 2009/10 R650 million Grant Conditions Only funding of social development components (economic components to be funded by loans, own sources etc) Regional bulk Water & San infrastructure only

Bulk Infrastructure Grant Conditions (see Section 20 of DoRB) All municipalities that can benefit be invited to participate in the Feasibility study. Feasibility studies take account of the IDP and WSDP All participating municipalities to agree and understand All participating municipalities to enter into an agreement setting out rights and obligations.

Bulk Infrastructure Challenges Cooperation between a number of stakeholders and especially several municipalities will require resources and time Feasibility Planning of some schemes may not be in place yet. Funding arrangements for economic elements (loans or own funding) can be time consuming- the PPP unit in NT willing to help.

Bulk Infrastructure Progress Targets Discussions were held with municipal and provincial stakeholders Policy and criteria booklet has been compiled Document on detail application procedure to follow Process well underway to compile a project list. Targets The full budget for 2007/8 will be allocated and spent Quarterly reports will be provided.

Schools and Clinics This grant has been created to eliminate backlog in access to water and sanitation at schools and clinics. An amount of R 665 million is available over the MTEF cycle. Ensure access to all identified clinics by 2007/08 and all identified schools by 2009/10 allocated as follows: 2007/08 R 105 million 2008/09 R 210 million 2009/10 R 350 million

Schools and Clinics Agreed Principles : Governance & Structure R665 m will be additional to funds already available through the Provincial Infrastructure Grants. Although funds controlled by DWAF, project planning and implementation will be a collaborative team effort between DWAF, DoE, DoH, PDE and PDH. National Governance Structure to be operational by end March 07 which will include a dedicated Program Manager within DWAF. Provincial structures are being established. (The E. Cape structure is already functioning) 9 Regional Program Managers & Support Offices being established. Schools and Clinics

Schools and Clinics Agreed Principles: Backlog Definition Backlogs have been classified as “facilities with no access” and “facilities with inadequate access” In the rollout of this program backlog definitions should be structured as follows: No Services at all Insufficient number of service facilities Unacceptable technical service type Unsustainable Service Unacceptable condition Unacceptable Health & Hygiene practices & management

Schools and Clinics Agreed Principles: Priorities Clinic Backlog will be eradicated within the available funds in 2007/08. Thus agreed with DoE that Clinics will be prioritised above Schools in the first year. Within the schools backlogs, schools with no facilities will be prioritised where practical and feasible in the context of the total solution. Allocations will be made in relation to the existing backlogs Schools and Clinics

Schools and Clinics Agreed principles : Implementation Various implementation models will be used. These will include: Using existing contracts / Implementing Agents of Provincial Departments Using MIG projects (municipalities) to connect schools to new water and or sanitation schemes currently being rolled out Using various organisations as Implementing Agents on behalf of DWAF Using contractors appointed directly by DWAF Schools and Clinics

Schools and Clinics Agreed Principles: Fund Allocation This allocation will be dealt with as a Schedule 7 allocation. The prioritisation of projects is being done in collaboration with the Departments of Health and Education (national and provincial) and these allocations are expected to be ready at the end of March 2007 and will be published in terms of section 22 of the DoR Bill. Schools and Clinics

Schools and Clinics Expected Outputs: Provide acceptable and sustainable water and sanitation services to All Clinics that currently have no services in 2007/08 period. All Schools that currently have no services. Some Schools that currently have unacceptable services, within budget constraints Specific Challenge As the program develops more detailed information, final funding requirements will be determined. Schools and Clinics

Operating Subsidy Multi year allocations Conditions 2007/8 R 1,040 billion 2008/9 R 1,130 billion 2009/10 R 0,855 billion Conditions All receiving WSA’s to conclude formal agreements by 31 March 2007 Transfer of appropriate staff by 31 March 2008 The necessary capacity must be in place in the receiving WSA’s for implementation of the grant DWAF to continue monitoring implementation till 2011/12

Operating Subsidy Output Challenges Operating of water services schemes and improved revenue collection Schemes refurbished to standards outlined in the agreed policy framework and transferred All affected staff transferred Challenges Finalising the staff transfers by end of March 2008. Formalising of refurbishment plans by WSA’s.

Operating Subsidy Progress 52 agreements signed (90%) 1734 staff transferred (21%) 4434 staff seconded (54%) 1628 schemes with a total asset value of R 5,880 million transferred (91%) Refurbishment total expenditure R 319 million (45%) Targets Six outstanding agreement signed 38 schemes refurbished and transferred 5748 affected staff transferred

Thank you