2013 COBie Challenge Brian Lynch General Manager North America

Slides:



Advertisements
Similar presentations
ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
Advertisements

Visit the ccScan Website Scan, Import, and Automatically File documents to the Cloud SCAN, IMPORT, AND AUTOMATICALLY FILE DOCUMENTS TO SALESFORCE ® Introduction.
Introduction Project Management.
Bringing XBRL tax filing to the UK Jeff Smith, Customer Contact, Online Services,
INTERNAL USE ONLY Pre-Task Planning. INTERNAL USE ONLY 2 People See Things Very Differently “A New Process means seeing the good and bad Equally”
© Copyright High Performance Concepts, Inc. 12 Criteria for Software Vendor Selection July 14, 2014 prepared by: Brian Savoie Vice President HIGH.
SSIS Over DTS Sagayaraj Putti (139460). 5 September What is DTS?  Data Transformation Services (DTS)  DTS is a set of objects and utilities that.
 Cloud computing  Workflow  Workflow lifecycle  Workflow design  Workflow tools : xcp, eucalyptus, open nebula.
Classroom User Training June 29, 2005 Presented by:
CompuBase Data for CRM / PRM Integration How compuBase fits to an existing CRM / PRM system? Last review 25/03/2007.
This presentation is the property of Paradigm Information Systems It is confidential to the intended recipient for the purpose of evaluating FMS Any other.
Report Prepared for Envision Presented by: Kristen Vargas Rossana Figuera Yinka Osidein.
Calculation BIM Curriculum 07. Topics  Calculation with BIM  List Types  Output.
SANILAB THE LOGICAL INDUSTRY CHOICE. SANILAB Industry edition Risk management is costly and stressing for production, quality and any other people of.
SENG521 (Fall SENG 521 Software Reliability & Testing Software Product & process Improvement using ISO (Part 3d) Department.
1 CA202 Spreadsheet Application Publishing Information on the Web Lecture # 15 Dammam Community College.
Introduction Project Management. Projects A unique process, consisting of a set of coordinated and controlled activities with start and finish dates,
Altman IM Ltd | | process | verify | convert | route | connect Prism Software’s solutions provide advanced workflow.
1 Margaret Christison Head of Product Data Standards Product Information Standards Defence Logistics 2004.
ARCHIBUS, Inc. COBie Data Connectors Gary Siorek, Technical Applications Engineer 2013 COBie Challenge for Facility Managers112-Mar-2013.
TMA Systems WebTMA Kerry Joels, Government Affairs Gary Cox, Professional Services Manager 07-Dec-2011COBie CMMS/CAFM Challenge1.
EastCoast CAD/CAM IFC COBie Plus (via Fabrication for AutoCAD MEP) David E. Quigley, Chief Operating Officer Keith Brown, MEP Consulting Engineer 2013.
IBM Maximo Asset Management Doug Wood, Architect Tivoli CTO’s Office COBie CMMS/CAFM Challenge121-Dec-11.
4Projects 4BIM Andy Ward, CTO Jason Warde, SVP NA Sales 2013 COBie Challenge for Builders110-Jan-13.
AssetWorks AiM Will Kline, Senior Project Manager 2013 COBie Challenge for Facility Managers112-Mar-2013.
Quicx developed by Chinook Systems Inc. David Wampler, Software Manager Wanda Lenkewich, Owner 2014 buidlingSMART Challenge107-Jan-14.
DRofus Inc dRofus Ole Kristian Kvarsvik, Head of business & technology Company logo 2013 Building Programming information exchange Demo110-Jan-13.
Company Product Presenter 1, title Presenter 2, title Company logo COBie CMMS/CAFM Challenge121-Dec-11.
Enterprise Processes and Systems MIS 2000 Instructor: Bob Travica Updated 2016 Class 16.
Network and Server Basics. Learning Objectives After viewing this presentation, you will be able to: Understand the benefits of a client/server network.
How Sage ERP X3 Systems Can Benefit Businesses.  Sage X3 is an affordable and flexible ERP solution designed to help mid-sized companies manage business.
Integrated Consulting Solutions Module 2: Management Commitment, Responsibility and Review.
Introducing pdri for mega projects As a Planning quality Control tool
Systems Development Life Cycle
Company: EcoDomus, Inc. Product: EcoDomus PM
Ole Kristian Kvarsvik, Head of business & technology
Essentials of UrbanCode Deploy v6.1 QQ147
Presenter Date | Location
Introduction Project Management.
Key Features Advantages over PDF sharing Use Cases Clients
BIM EXECUTION PLANNING PROCESS
PLM, Document and Workflow Management
The Systems Engineering Context
Letsignit, an Automated Signature Solution for Microsoft Office 365 and Microsoft Exchange, Provides Efficiency in Branding and Customization OFFICE.
2013 COBie Challenge for Facility Managers
Copyright Scott Bloss, All rights reserved.
Balanced Scorecard Designer
Lloyd Pickering, BIM Team Leader John Adams, Product Manager
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
The Impact of Cloud Computing to Technology-Based Companies
Python Classes in Pune |
BIM EXECUTION PLANNING PROCESS
Making PowerShell Useful
Introduction to Software Testing
InLoox PM Web App product presentation
Your Facility Your Information
Project Information Management Jiwei Ma
Enterprise Program Management Office
Infra program Project outline Jouko Kankainen
Letsignit, an Automated Signature Solution for Microsoft Office 365 and Microsoft Exchange, Provides Efficiency in Branding and Customization OFFICE.
Introduction Project Management.
Chapter # 5 Supporting Quality Devices
TOWN OF PALM BEACH ELECTRONIC SOLICITATION SYSTEM
BAZaaR FOR HOSTING COMPANY
King Saud University College of Engineering IE – 462: “Industrial Information Systems” Fall – 2018 (1st Sem H) Introduction (Chapter 1) part.
Eagle Technology Proteus MMX
TOWN OF PALM BEACH ELECTRONIC SOLICITATION SYSTEM
Kaspersky Social Channel
Driving Successful Projects
Presentation transcript:

2013 COBie Challenge Brian Lynch General Manager North America NFMT, March 2013

Product description & User base AcceleratorTM users user count: facility count: public sector: private sector: customers name: > 200,000 > 20,000 40% 60% One of world’s largest energy companies Two of the world’s best known sports leisure companies. One of the world’s largest nutrition & health companies Planon delivers an full-suite IWMS solution to the market. This means that we provide a platform that covers the needs for real Estate professionals as well as for Facility managers including all hard-and soft services. Our platform is used by a large and growing group of Service Providers as well. The user base is significant. we service around 1800 Accounts around the world. We work for renowned international organizations. These types of organizations do not often grant their suppliers to use their logos, larger accounts for Planon are: One of world’s largest energy companies (Shell) Two of the world’s best known sports leisure companies (Nike, Adidas). One of the world’s largest nutrition & health companies (Unilever) NFMT 2013 - COBie Challenge 2013 Challenge for Facility Managers 2

Tested product: COBieLite / Planon Enterprise Talk Product name, version: Planon Enterprise Talk Planon R2011 / R2013 PC & Cloud www.planonsoftware.com For this year’s challenge, Planon and bSa worked together to establish a first implementation of COBieLite. Where the COBie standard uses Excel as information carrier, the COBieLite standard uses an XML based file format to transfer data. Planon felt that the COBie implementation on Excel brings some drawbacks when one wants to automate data interchange between BIM systems and its own CAFM/IWMS systems: it involves additional programming to address the Excel sheet tabs and columns. Secondly, it requires the users to own excel product versions that are mandatory for data transfer. Finally, also the data structuring as provided by COBieLite is more suitable for the purpose of data exchange. Why COBieLite? COBieLite (XML) COBie (Excel) based on Spreadsheet XML 2003 NFMT 2013 - COBie Challenge 2013 Challenge for Facility Managers 3

Tested product: COBieLite vs. COBie COBieLite is based on XML structured data transfer. XML is the industry-preferred technology for machine-2-machine communications. COBieLite data structure is hierarchical, allowing for easy parsing and processing. Checking consistency and testing of the processing itself is facilitated well. (advice: use the CAMed XML editor from the bSa website!). First of all, COBieLite is based on a hierarchical data structure: Facilities ‘decend’ to floors, which ‘decend’ to spaces, and so on… As we have experienced in our development sessions, it was quite easy to check system import results with the data as had been delivered in the COBieLite file: using the CAMed XML file editor, it was quite simple to search for data elements and inspect its hierarchical relations (e.g. spaces to floors). Also questions like: ‘is a specific data element put available at all’? , was answered in seconds by just inspecting the COBieLite file. In comparison: this is quite more tedious in the Excel file data structures. Processing this types of hierarchical XML structures has become common-place in today’s IT industry so it provides little to no problems or overhead. NFMT 2013 - COBie Challenge 2013 Challenge for Facility Managers 4

Tested product: COBieLite vs. COBie For Planon, it was a ‘natural fit’ with its Enterprise-Talk technology1. Planon worked with bSa to put COBieLite to a first production version. We want to express our gratitude to bSa but especially Angela Lewis, Bill East and Chris Bogen in working with us to establish this result. We expect COBieLite to receive revisions over time. The ‘natural fit’ of COBieLite for Planon stems from the technology we selected to create the interaction with: Planon Enterprise Talk. The concept behind Enterprise Talk is that it does data Extraction Transformation and Loading, based on what we call a ‘Chain of Workers’. A ‘Worker’ is a little program, that performs a specific task: for example getting data out of an Excel file or transforming an XML structure and call a platform API (Application Programming Interface) to load that data in the system. One can ‘link’ those Workers to form a ‘Chain’: each Worker executes after the previous one terminated, taking up the result of the previous one and passing its results again to the next ‘Worker’. Although supporting COBie on Excel was quite feasible too 5

Configuration Concept of ‘Workers’: BIM System No direct (SQL) access to the database: all standard business logic applied automatically Small programs, each performing a specific transformation Workers can be linked into a ‘chain’ Standard ‘Workers’ available in a library New Workers can be added with ease An interface using Workers is configured in the system Enterprise Edition Platform COBieLite.XML Planon Enterprise Talk BO So, data as provided by a BIM system in COBieLite format is processed by two ‘Workers’: one Worker to retrieve the additional (namespace) COBie standard data with the XML file, one to extract and load the data as parsed in the XML file. Note that the COBieLite XML ‘tags’ (like COB.Facility and COB.Floor) point to the objects to be updated in the system. Planon provides a library of ‘Workers’ and new ones are added on a regular basis: of those being the COBieLite ones anew. EE Database Bi-directional: Not in the COBie challenge but clearly a feasible option.

Challenge scope: COBieLite information COBie.Sheet Imported spaces and equipment Space, Type, Component  PM schedules Job  safety procedures systems System materials, tools, training Resource associated documents Document replacement parts Spare space and equipment properties Attribute space zones Zone We expected high overhead for stabilizing the COBieLite standard. As a fact we have been iterating its implementation between bSa and Planon several times indeed before we jointly concluded this exercise. In view of this, we up-front decided to limit our scope on the project, but adding that other data elements does not pose a problem to us. We have prioritized on establishing a production version of COBieLite with bSa. Addressing all remaining data elements is well feasible. NFMT 2013 - COBie Challenge 2013 Challenge for Facility Managers

COBie value proposition: to the lifecycle ? Service provider Facility management Sustainability Maintenance Space management Health & safety Reconstruction .... Contracting (Performance based) pricing KPI’s ... Service Level Agreement Design & Engineering $ SAAS / Cloud $ Logistics $ Construction Clear business case for BIM has been established for the design and construction phases of facilities. So, why is BIM a topic of interest for the FM community? Since Facility Managers manage the lifecycle of the facilities, the BIM technology should provide benefit to be used over the lifecycle. We believe BIM can provide such value: Using the Facilities' bill-of-material for maintenance (budget) planning – this is the first application of COBie! Contracting: providing sound basis for scope and SLA agreements Activity preparations: health and safety issues, tool requirements etc. Space management simulations (space typing, occupational patterns in 3D showing occupancy of the full facility i.s.o. only on a per-floor basis) Lower costs of reconstruction: all construction data available and existing model to work from, saving lots of time, costs and risks in future projects NFMT 2013 - COBie Challenge 2013 Challenge for Facility Managers

BIM offers tangible value for facility management. Value proposition BIM offers tangible value for facility management. At the same time its lifecycle adoption in the industry is just starting. COBie provides the means to manage consistency of information between CAFM / IWMS and BIM. Note that Planon believes that the way to go here is in ‘unattended two-way data exchange’ between the IWMS and the BIM systems. data changes as made in the IWMS should propagate to BIM as well as BIM data propagating to the IWMS. Unattended by means of either triggered exchange based on end use actions or exchange based on scheduled exports and imports. The Enterprise Platform provides this capability, but it was not implemented for this challenge. NFMT 2013 - COBie Challenge 2013 Challenge for Facility Managers

NFMT 2013 - COBie Challenge 2013 Challenge for Facility Managers Contacts COBie support Marketing POC Nelson Yan phone: +1 7813560999 email: nelson.yan@planonsoftware.com Brian Lynch phone: +1 7813560999 email: brian.lynch@planonsoftware.com Jos Knops phone: +31 24 6413135 email: jos.knops@planonsoftware.com Thank you for your attention. NFMT 2013 - COBie Challenge 2013 Challenge for Facility Managers 10