1 Manufactured Home Installer Course Introduction to Manufactured Housing.

Slides:



Advertisements
Similar presentations
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advertisements

Terms. 1. Globalization 2. Financing 3. Inputs.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
UNITED NATIONS Shipment Details Report – January 2006.
RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) Customer Supplier Customer authorizes Enrollment ( )
and 6.855J Spanning Tree Algorithms. 2 The Greedy Algorithm in Action
We need a common denominator to add these fractions.
State of New Jersey Department of Health and Senior Services Patient Safety Reporting System Module 2 – New Event Entry.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Prepared by: Workforce Enterprise Services For: The Illinois Department of Commerce and Economic Opportunity Bureau of Workforce Development ENTRY OF EMPLOYER.
Exit a Customer Chapter 8. Exit a Customer 8-2 Objectives Perform exit summary process consisting of the following steps: Review service records Close.
Local Customization Chapter 2. Local Customization 2-2 Objectives Customization Considerations Types of Data Elements Location for Locally Defined Data.
Create an Application Title 1Y - Youth Chapter 5.
Create an Application Title 1A - Adult Chapter 3.
Custom Statutory Programs Chapter 3. Customary Statutory Programs and Titles 3-2 Objectives Add Local Statutory Programs Create Customer Application For.
1 Associate Test Coordinator Duties and Responsibilities.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 5 second questions
Year 6 mental test 10 second questions
Module Floor Systems.
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
Introduction to building Estimating in South Australia 1.
1. 2 Objectives Become familiar with the purpose and features of Epsilen Learn to navigate the Epsilen environment Develop a professional ePortfolio on.
Richmond House, Liverpool (1) 26 th January 2004.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Intel VTune Yukai Hong Department of Mathematics National Taiwan University July 24, 2008.
Module Reading Plans and Elevations
This is a sample set of slides from one of our fifteen pre- pack employment law seminars. For more information, visit:
Red Tag Date 13/12/11 5S.
PP Test Review Sections 6-1 to 6-6
VOORBLAD.
Identifying Our Own Style Extended DISC ® Personal Analysis.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
SLP – Endless Possibilities What can SLP do for your school? Everything you need to know about SLP – past, present and future.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Subtraction: Adding UP
H to shape fully developed personality to shape fully developed personality for successful application in life for successful.
Januar MDMDFSSMDMDFSSS
Page 1 of 36 The Public Offering functionality in Posting allows users to submit requests for public offerings of Petroleum and Natural Gas(PNG) and Oil.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Concrete Construction Part 1
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Weekly Attendance by Class w/e 6 th September 2013.
Energy Generation in Mitochondria and Chlorplasts
St. Paul Public Television Quality Workshop - July 8-9, 2010
RefWorks: The Basics October 12, What is RefWorks? A personal bibliographic software manager –Manages citations –Creates bibliogaphies Accessible.
Profile. 1.Open an Internet web browser and type into the web browser address bar. 2.You will see a web page similar to the one on.

Presentation transcript:

1 Manufactured Home Installer Course Introduction to Manufactured Housing

2 The Home, the Site and You To be a professional manufactured home installer you need to understand HUD Code homes, how to deal with site conditions and what you need to do to maintain your license.

3 So Just What is a Manufactured Home? Built to a federal building code A nationally preemptive code Code is based on performance 3 rd party inspection system Built in sections Delivered to the site Some site constructed elements such as decks Industry grew out of the Mobile Home business

4 Preemptive Code This means that no local or state government can increase or decrease the code requirements for the construction of a manufactured home. The preemption applies to the box Wisconsins one- and two-family building code applies only to the foundation, additions, steps and deck – not the home itself

5 Home Inspections The HUD Code calls for inspections in the plant for the home If there are unusual aspects of the home that cannot be inspected in the plant, then a field inspection is done for the home. Wisconsin law requires all manufactured home installations to be inspected

6 Whats What Mobile Home – built prior to July 1976 Manufactured Home – built to HUD Code after July 1976 Modular Home – built to state building code (UDC in Wisconsin) Using the term modular home is only proper if it relates to a home built to the state code. A HUD Code home is never a modular home.

7 Todays manufactured housing delivers outstanding quality and performance due to the systems approach to its construction Manufactured homes benefit from economies of scale A wide range of styles and exterior finishes are available

8 Flexibility in the production process still permits customization to meet your lifestyle and needs Smart buyers are also looking for the Energy Star label

9 Who Lives in Manufactured Homes Age of Household Head Less than 30 8% % % % % 70 or over 8%

10 Who Lives in Manufactured Homes Employment Status of Household Head Full time 64% Part time 7% Retired19% Not employed 10%

11 Who Lives in Manufactured Homes Household Size 1 15% 2 36% 3 or 4 36% 5 or more 13%

12 The Product Mix Two or more home sections 72% One section28% Multi-section homes create special issues for installers. Be alert to: Marriage line pier locations Electrical, HVAC and Plumbing crossovers Proper connection of the halves

13 Home Placement On land owned by homeowner71% Located in MH Community29% Placements in MH communities result in special considerations. Be alert to: Permission to work on land not owned by the homeowner Buried electrical wires and plumbing that may not be located on site drawings

14 What does a Manufactured Home look like? Could be a single section home with vinyl skirting. Proper foundations to avoid buckling of skirting is important for these homes

15 What does a Manufactured Home look like? Could be a two section home with an attached garage on a full basement. Attached garages require prior consultation with the home manufacturer. related to fire breaks, structural support and foundation considerations.

16 What does a Manufactured Home look like? Could be log cabin Attached decks must be properly supported and not hung onto the home

17 What does a Manufactured Home look like? Could be this two-story in Milwaukees Lindsey Heights. A two story home is possible but the second floor still has a chassis

18 Whats What? A HUD Code Home must have a red HUD label on each home section.

19 Understanding the HUD Code Adopted by Congress in 1976 A nationally preemptive code Administered nationally by HUD and locally by the Department of Commerce Code covers the box

20 HUD Code in the Plant Home is designed and then approved by a 3 rd party Design Approval Primary Inspection Agency (DAPIA) Home is constructed and then inspected by 3 rd party In-plant Approval Primary Inspection Agency (IAPIA) Home must be habitable when leaving the plant – all systems must be in working order when the home leaves the plant. (electrical, HVAC, plumbing)

21 Characteristics of the HUD Code Home Permanent chassis which cannot be removed Red seal on each section Dataplate details all of the system details of the home

22 Each HUD Code Home Section has a Label

23

24 Data Plate Inside the home located near the electrical service is the Data Plate The 8.5 by 11 inch document include vital information on the home including roof load, wind zone, thermal zone and mechanical system details.

25 Data Plate also includes Manufacturers Name Trade/Model Name Year of Manufacturer Serial Number HUD Construction Zones The construction zone information is key for installers!

26 Beyond the HUD Code If the home has non-standard items the home might be subject to an alternative construction letter and extra inspection Additions, decks, steps and landings are subject to the Wisconsin one- and two-family dwelling code (UDC)

27 AC Process Manufacturers can apply to have certain items inspected in the field that are impossible to do in the plant. Alternative Construction process or AC approval Typical item – roof penetrations in hinged roofs

28 Whats next? Basics of the HUD Code Installation standard for existing homes New HUD Code Installation Standard Licensing law for installers Acceptable Slab Design

29 Whats in your workbook? Key to the Code Did you know? Commerce contacts Web links Older home installation standard info New installation standard Resources

30 Critical Websites See page 6 of your wookbook You can retrieve up to date information by bookmarking these sites.

31 4 Codes – 1 Industry Installers need to be alert four codes that affect their professional work: HUD Code – cover the home construction Installation Code for April 1, 2007 or after homes Installation Code for Pre April 1, 2007 homes UDC for site built components of the home

32 Take Exam 1 At this time, print out Exam 1 and complete this test. After completion of Exam 1, open Presentation 2. Click the link below to return to the course page: Internet Installer Course