Conformity Assessment Activities of the IOD-NoBos

Slides:



Advertisements
Similar presentations
WP4 – Task 4.4 LCA Activities
Advertisements

MODULE B - PROCESS B1. ASME Organizational Structure B2. Standards Development: Staff and Volunteer Roles and Responsibilities B3. Conformity Assessment:
Prepared and presented by Paul French AJA Registrars Operations Director AJA are a multi-accredited International Certification Body based in Portishead.
Reference Document Management 1 European Railway Agency (ERA) Cross-Acceptance Unit P. Mihm 17/11/2010.
“DV 29” COMMISSION RECOMMENDATION on the authorisation for the placing in service of structural subsystems and vehicles under Directive 2008/57/EC.
Accreditation 1. Purpose of the Module - To create knowledge and understanding on accreditation system - To build capacity of National Governments/ focal.
CE Regulation Service PROLAB Tech Rev 1 Machinery Directive Flow Chart A brief guide.
The Future – the “Roadmap” SIMPLIFICATION. The Road Map 2 TSI in Place Hi Speed Conv Loc & pass Off TENS TSI Conformity New Vehicles Networks Open pointsUpdates.
Accredited Third Party Certification and Food Safety Management Systems Jill Hollingsworth, DVM Group Vice President Food Marketing Institute.
EMS Auditing Definitions
ISO/IEC Winnie Chan BADM 559 Professor Shaw 12/15/2008.
IAQG OPMT OP Assessor Training Oversight Assessment of Training Provider Approval Bodies February 2015 Module 14.
ASPEC Internal Auditor Training Version
ISO 9000 Certification ISO 9001 and ISO
S3: Module D Physikalisch-Technische Bundesanstalt Session 3: Conformity Assessment Module D Peter Ulbig, Harry Stolz Belgrade, 31 October.
Codes, Standards & Conformity Assessment GP Russ Chaney CEO, The IAPMO Group
NOTIFIED BODIES EC MARKING. index  Notified Bodies. Activities  Notification procedure  Role of accreditation  Notified Bodies cooperation  Notified.
Company Confidential 1 AS9104/1 Transition and Oversight Assessment of Accreditation Bodies Tim Lee 12 March 2012.
Prof R T KennedyEMC & COMPLIANCE ENGINEERING 1 EET 422 EMC & COMPLIANCE ENGINEERING.
ISO. ISO 9000 is a family of standards for quality management systems. ISO 9000 is maintained by ISO, the International Organization for Standardization.
WHY CONFORMITY ASSESSMENT?. What is conformity assessment?  Conformity assessment is the name given to processes that are used to demonstrate that a.
Overview of existing assessment schemes Rolf Bienert, John Lin.
How does the ECA assess Member States’ internal control systems? Workshop on Audit/Evaluation of Public Internal Financial Control Systems (PIFC) Ankara,
2008 New York - Member Forum Council for Responsible Jewellery Practices, Ltd. Overview of CRJP.
UIC ERTMS World Conference Certification and Assessment of GSM-R Begoña DOMINGO, GSM-R Project Officer Istanbul, 3/04/2014.
Recommendation 2014/897/EC (DV29bis) Key Principles.
The New Approach and GPSD. Council Resolution of 7 May 1985 on a new approach to technical harmonization and standards [OJ C136 of June 1985] New Approach.
1 Standardisation, Assessment, and Certification Legal Framework, Standards  Measurement Instrument Directive (2004/22/EC)  Interoperability Directive.
Webinar Auditor Qualification. “To be the world’s leading, independent, GFSI recognized, ISO based food safety and quality management system for the entire.
CERTIFER 1 J.P PRONOSTP.OZELLO UCI ERTMS CONFERENCE BUDAPEST.
Training workshop on CSM-RA ERA PROPOSAL FOR A HARMONISED ACCREDITATION SCHEME FOR NOBOs Luca TRINCA, ERA Project Officer Valenciennes, 14 th APR 2016.
Workshop accreditation and recognition / conformity assessment Removing Technical Barriers - TSIs within New Approach and Safety Directive Dr.-Ing. Andreas.
1 EBA - Recognition procedure for AsBo´s according to CSM 402/2013 ERA – workshop CSM, April 2016 Michael Schmitz, Eisenbahn-Bundesamt,
Slide n° 1 Workshop to NABs & RBs on Reg. 402/2013 and Harmonised sectorial accreditation scheme for railway NOBOs - Valenciennes, April 2016 NAB/RB Training.
Harmonised use of accreditation for assessing the competence of various Conformity Assessment Bodies Dr Andreas Steinhorst, EA ERA workshop 13 April 2016,
EU Certification Systems Dr. Friedrich Lüdeke, GLOBALG.A.P. Cairo, 12 June 2012.
Module 02 Essential Requirements for ATCOs. Training Objectives  Appreciate the content of the essential requirements for ATCOs as described within EASA.
ISO Certification For Laboratory Accreditation ISO Certification For Laboratory Accreditation.
AUDIT EVIDENCE AND FINANCIAL STATEMENT ASSERTIONS 1.
What is ISO? ISO is that the world’s largest developer of voluntary International Standards. International Standards provide state of the art specifications.
Copyright © AEbt 2016 All Rights Reserved. AEbt Angewandte Eisenbahntechnik AEbt Angewandte Eisenbahntechnik (AEbt Applied Railway Technology) Further.
Building a Quality management System First question is: - Is the Certification Body part of a legal entity? Most CB’s are in fact part of another organisation.
CA 101 Certification and Registration
MODULE 8: GOVERNANCE AUDIT EVIDENCE AND REVIEW
Module 3 Information about the audit
NAB/RB Training Workshop In Valenciennes, April 2016
Body Of Knowledge for Other Party (OP) Assessors
Auditor Training Module 1 – Audit Concepts and Definitions
EET 422 EMC & COMPLIANCE ENGINEERING
Status of certification as to ISO 14001
Fundamentals of ISO.
Session II: System authority for ERTMS 4RP Trackside approval
UNIT V QUALITY SYSTEMS.
Michel BRENON IEC ExTAG Secretary
Quality Management Systems
FORMAL SYSTEM DEVELOPMENT METHODOLOGIES
ISO 9001:2015 Auditor / Registration Decision Lessons Learned
Highlights of SR003 Rules for AS 9100, 9120 and 9110 Transition
Overview of EMS and ISO Environmental Management Systems Development Course Raleigh, NC July 24, Beth Graves NC Division.
UNDERSTANDING FOR STANDARD
AS9104/1 Transition and Oversight Assessment of Accreditation Bodies
The new EU type-approval framework for motor vehicles
Agenda Why this group exists Who is behind it
How to conduct Effective Stage-1 Audit
Fourth Railway Package Technical Pillar Hearing at the European Parliament, Brussels 7 May 2013 José GORTAZAR Chief Technical Officer, CAF.
ESS approach and support for Declaration of Conformity (CE-marking) Fredrik Håkansson ESS Accelerator Collaboration Board Meeting Trieste
Denis Ward American TCB
DRAFT ISO 10015:20XX Revision Overview Quality management — Guidelines for competence management and people development ISO/TC176 TG 01.
National Legislation in the Pressure Sector and the PED
General principles of the New Approach legislation
Presentation transcript:

Conformity Assessment Activities of the IOD-NoBos Maik Wuttke Vice-Chairman of NB-Rail Association & Leader of the RST-Group at NB-Rail QM-Representative for three Organisations accredited to perform NoBo/ DeBo/ AsBo/ ECM-CB/ ISA activities: TÜV Rheinland InterTraffic, Cologne TÜV Rheinland Rail Certification (previously Luxcontrol Nederland), Utrecht TÜV Rheinland UK, Solihull

Conformity Assessment (incl. Conformity Certification) Step C - Certification 2a Inspection of Design/Product(s) relevant aspects of 17020 (third party independence) Step B - Evaluation 2b Audit on Design/Production Processes relevant aspects of 17021 (third party independence) Step A - Evidence 3a Selfassessed Design Evidence 9001 (Drawing / Calc / Simulation) 3b Type Test / Product Test Reports 17025 for the RELEVANT Scope of Testing or RFU-STR-022 + 9001 (independent to 17025 pt4.1.4) 3c Selfassessed Series Testing Evidence 9001 3d ISA Reports 50126series + 50128 Fig. 5 ISA-independance + often also 17020 A or B for the RELEVANT ISA Scope 3e Selfassessed Commissioning Evidence 9001 3f V&V Reports 50126series +50128 Fig. 5 V&V- independance + often also 17020 A or B/17025 for this V&V Scope) 18.09.2018

Conformity Assessment (incl. Conformity Certification) Step C C Certification Evaluation 2a Inspection of Design/Product(s) relevant aspects of 17020 (third party independence) Step B 2a Inspection of Design/Product(s) relevant aspects of 17020 (third party independence) B 2b Audit on Design/Production Processes relevant aspects of 17021 (third party independence) 2b Audit on Design/Production Processes relevant aspects of 17021 (third party independence) Evidence Selfassessed Design Evidence (Drawing / Calc / Simulation) Type Test / Product Test Reports to ISO 17025 or RFU-STR-022 + ISO9001 (independence to ISO17025 pt4.1.4) Selfassessed Series Testing Evidence ISA Reports to EN 50126series + EN 50128 Fig. 5 ISA-independance (+ often also ISO17020 Type A or B) Selfassessed Commissioning Evidence V&V Reports to EN50126series +50128 Fig. 5 V&V- independance (+ often also EN17020 type A or B) 18.09.2018

Conformity Assessment (incl. Conformity Certification) Step C C Certification Evaluation Inspection of Design/ Product to ISO17020 Audit on Design/Production Processes ISO17021 Evidence Selfassessed Design Evidence (Drawing / Calc / Simulation) Type Test / Product Test Reports to ISO 17025 or RFU-STR-022 + ISO9001 (independence to ISO17025 pt4.1.4) Selfassessed Series Testing Evidence ISA Reports to EN 50126series + EN 50128 Fig. 5 ISA-independence (+ often also ISO17020 Type A or B) Selfassessed Commissioning Evidence V&V Reports to EN50126series +50128 Fig. 5 V&V- independence (+ often also EN17020 type A or B) 18.09.2018

Conformity Assessment (incl. Conformity Certification) Certification Review & Desicition ISO17065 Certification Evaluation Inspection of Design/ Product to ISO17020 Audit on Design/Production Processes ISO17021 Evidence Selfassessed Design Evidence (Drawing / Calc / Simulation) Type Test / Product Test Reports to ISO 17025 or RFU-STR-022 + ISO9001 (independence to ISO17025 pt4.1.4) Selfassessed Series Testing Evidence ISA Reports to EN 50126series + EN 50128 Fig. 5 ISA-independance (+ often also ISO17020 Type A or B) Selfassessed Commissioning Evidence V&V Reports to EN50126series +50128 Fig. 5 V&V- independance (+ often also EN17020 type A or B) 18.09.2018

Conformity Assessment (incl. Conformity Certification) Certification Review & Desicition ISO17065 Certification Evaluation Inspection of Design/ Product to ISO17020 Audit on Design/Production Processes ISO17021 Evidence Selfassessed Design Evidence (Drawing / Calc / Simulation) Type Test / Product Test Reports to ISO 17025 or RFU-STR-022 + ISO9001 (independence to ISO17025 pt4.1.4) Selfassessed Series Testing Evidence ISA Reports to EN 50126series + EN 50128 Fig. 5 ISA-independance (+ often also ISO17020 Type A or B) Selfassessed Commissioning Evidence V&V Reports to EN50126series +50128 Fig. 5 V&V- independance (+ often also EN17020 type A or B) 18.09.2018

General Issues for Step B – Evaluation & Step C -Certification NoBos may only certify, AFTER ALL APPLICABLE TSIs for the Product/ Installation have been evaluated with positive outcome. Q1: What is the Product/ Installation to be certified? Q2: Which TSIs & which parameters in them apply? 18.09.2018

What is the Product to be certified? Consider: This may be a variant of previous authorised type This may be a modified vehicle There may be derogations (2008/57/EC Art. 9 & Art.20) 18.09.2018

What is the Installation to be certified? Consider: The bridge may have been „maintained“ + the track is new. Only the bridge may have been replaced. There may be derogations. (2008/57/EC Art. 9 & Art.20) 18.09.2018

General Issues for Step B – Evaluation & Step C -Certification Before starting any Evaluation, the NoBo must create a complete Requirements-Check-List and demonstarte the related competence of the Team. Q3: How are these Requirements defined? 18.09.2018

Requirements: Level1: „Essential Requirements“ from 2008/57/EC: Safety, Health, Environmental Protection, Reliability and Availability, Technical compatibility, Accessability (but limited to how they are contained in the TSIs) Level2: Text in TSI- if directly containing an assessable requirement: direct TSI requirement, may include a reference to a ‚Mandatory Standard‘ (or part of it) Level3: Text in TSI- not containing an assessable requirement: in-direct TSI requirement >>>> must be supported by a ‚Voluntary applied Standart‘ or ‚Alternative Solution‘ at the choice of the applicant Level4: Apply supporting information (ERA TO/ ERA TD/ ERA Mandatory Documents/ ERA Guides/ RFUs/ FAQs) 18.09.2018

Requirements Check-List Make a systematic Assessment Check-List to list all applicable Requirements. Update the list as required throughout the project > to have a complete and true list at the end. 18.09.2018

General Issues for Step B – Evaluation & Step C -Certification Q4:How is the NoBo Evaluation performed? 18.09.2018 Overview Conformity Assessment

Step B - NoBo-Evaluation Often expected – but not like this… 18.09.2018

Step B - NoBo-Evaluation Inspection ISO17020 Design-Inspection of Evidence documents + Prototype-/ Installation-Inspection Depending on the Moduls chosen by the Applicant, this may vary in focus Some TSIs/ Moduls have anomalies! (e.g. no Installation-Inspection) 18.09.2018

Step B - NoBo-Evaluation Audit ISO17021 Audit of the Seriesproduction of THIS TYPE of Product. 18.09.2018

General Issues for Step B – Evaluation & Step C -Certification Q5: What is the result of the NoBo Activities? 18.09.2018

Results of Step B – Evaluation & Step C -Certification These include: Check List of applied Requirements, Reports on the Evaluation (Inspection & Audit), Results of Evaluation, References to the Evidence documents, Conditions for Use These do not include: Assessements of Requirements, Conditions for Use, which were not in the Scope of the Assessment (as legally defined by IOD) 18.09.2018

In Summary Identify all mandatory and applicant-defined Requirements Prepare Checklist and define competent Team of NoBo-Inspectors and –Auditors (competent= knowledge& ability) Perform Evaluation = Inspection of Evidence + Inspection of Product/ Installation + Audit of Series Production Report on all Results Submit all Reporting to an independent Certification Review & Decision Prepare Certificate + Reports + References to Evidence Documents in the NoBo Technical File > Process must be documented, repeatable, traceable and should create the same result regardless of which NoBo is performing it 18.09.2018

Webpage: NB-Rail.eu 18.09.2018