?? 16 November 16 Action plan.

Slides:



Advertisements
Similar presentations
A3 Reports. Aims & Objectives Target Audience : Anyone who has to write a report or proposal Purpose of Module : To confirm understanding and benefits.
Advertisements

Title: The title should accurately describe the issue to be addressed and can never contain a proposed countermeasure. Overview Note: Remember that the.
Supplier Development Kaizen Implementation Kit
Tumolo’s Toolbox 7 Step Improvement Process.
Total Productive Maintenance OVERVIEW. Target Audience : Senior Management Purpose of Module : To understand the need for TPM and the commitment required.
1 Presentation Template: Instructor Comments u The following template presents a guideline for preparing a Six Sigma presentation. An effective presentation.
PROJECT TITLE Name Date Etc. PROJECT OVERVIEW & PROGRESS: SLIDE 1 Bullet.
Brochure outline Group Name: Marcom Source: ETSI Meeting Date: Agenda Item: N/A.
Traditional Economic Model of Quality of Conformance
Seven Old Tools of Quality Management
1 Chapter 6 Quality Tools. 2 The Seven Basic Quality Tools. Flowcharts Check Sheets Histograms Pareto Analysis Scatter Diagrams Control Charts Cause-and-Effect.
KANZEN INSTITUTE ASIA PACIFIC 1 What is OEE ? OEE Overall Equipment Effectiveness Why is a high OEE important for the department ? OEE Calculation How.
Kaizen Focused Improvement Teams (F.I.T.) Training Pack.
Presentation Title.
Presentation Title.

Quality Management Gábor Árva
Practical Problem Solving
SCOPE & PLAN FOR HORIZONTAL DEPLOYMENT
Toll Gate Review: Define
Problem Solving Sheet Guidelines
SUPPLY.
PROBLEM SOLVING MODULE
Engagement Discussion A3
Type the title of your book here
Initiative Name Initiative Leader Target Go Live Date: Reporting Date
Fundamentals of Statistical Process Control
Black Belt Project Storyboard Template Can be used in combination with Black Belt Storyboard Submission Guide Visit GoLeanSixSigma.com for more Lean Six.
GETTING TO ROOT CAUSE / COUNTERMEASURES
Scope & Plan for Horizontal Deployment
Title: Owner: Ver: Date:
مديريت كارورزي پزشكي اجتماعي.
Title: Owner: Ver: Date:
Title: Owner: Ver: Date:
<PROJECT NAME> THEME STAKEHOLDERS BACKGROUND CURRENT CONDITION
8 Step Problem Solving Step 1: Clarify the Problem
Solve: 1. 4<
Value Stream Mapping (VSM) Training
Board Components Title – This is the largest and clearest text on your board. It should be legible from about twenty feet away. Pre–cut letters are a good.
Other Current Conditions:
A3-Status Report Title: Owner:
Subcomponents 8D for Problem Solving
Create a title for your timeline
In your packs.... Two pieces of Learner work. Note: based on live examples Unit Specification Marking Sheet (blank) Standardisation Activity Unit.
*Maintenance Sheet 8.5 Due Friday *Please complete Thursday’s Sub Work
A3 Title A3 Leader: A3 Editor: Reference Number: Function:
Group 1 Group 1 Group 1 Group 1 word word word word word word word word word word word word word word word word word word word word word word word.
Lot No – 1 VARIOUS TYPES OF USED MACHINES AVAILBALE IN 3 SHED’S (DETAILS AVAILABLE IN EXCEL SHEET) QUANTITY : 156 Nos Auction Date :
ECONOMICS: August 31 Warm-up #1 (SLO)
Issue Escalation – Trigger Points
Q.R.Q.C Quick Response Quality Control
Unit 5- Age of Imperialism Timeline
Relations, Domain and Range
1. Define 4. Implement 2. Measure 3. Analyse 5. Control YOUR LOGO
Possible Analysis Tools to Insert into your A3
EVALUATION OF COUNTERMEASURES PDCA
Drawing Graphs The straight line Example
Volunteer Tutoring Today and Tuesday!
Presentation Title Your information.
EVALUATION OF COUNTERMEASURES PDCA
Thing / Person:____________________ Dates:_________________
1. Define 4. Implement 2. Measure 3. Analyse 5. Control YOUR LOGO
1. Define 4. Implement 2. Measure 3. Analyse 5. Control YOUR LOGO
1. Define 4. Implement 2. Measure 3. Analyse 5. Control YOUR LOGO
HISTORY OF THE EARTH ANSWER SHEET
© 2018 Durivage Management Solutions Limited
AP ECONOMICS: September 5
CCM A3 “P” “D” “C” “A” Date: Title / A3 Theme: Owner: Stakeholders:
Presentation transcript:

?? 16 November 16 Action plan

A3 Problem Solving ROOT CAUSE Problem Title Problem & Countermeasure Report Date: Initiator: Director Manager T/L Problem Title Concern Cause Analysis Item Status Illustration Man Machine Material 1. Date: Quantity Range Downtime Defect Type Fault diagnosis 2. 3. Method Maintenance Environment Problem History Factual Data: Sudden impact Problem develop over time Single shift concern (stratification) Pareto analysis Point of Cause Root Cause WHY? – WHY? - ROOT CAUSE Target Countermeasures Graphical representation of reduction over time Impact and Result Who, What, and When Locate the Origin Follow up / Standardisation / Yokoten Countermeasure(s) applicable to other areas? Process confirmation sheets Kami Shibai Logical process flow – at what point is the concern first evident