System Tests at Lyon From Aachen: ICB for front petal side A, disks 4-6, rings 4 and 6 From CERN: CCU25 Tests (M. Ageron): FEC ring and I2C addressing.

Slides:



Advertisements
Similar presentations
TEC X5 Setup (1) 1 Front + 1 Back petal, fully equipped (28 modules F.P modules B.P. + AOH + DOHM) Petal assembly IPN-Lyon (F.P.), RWTH-Aachen I.
Advertisements

Kondo GNANVO Florida Institute of Technology, Melbourne FL.
TPC DETECTOR SEGMENTATION OF THE READOUT PLANE LATERAL VIEW OF THE TPC
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Juan Valls 1 TOB System Test Status Report  DS ROD System Test Setup  DAQ Software  DS ROD Characterization PLL, FED Timing Scans OPTO Scans  Noise.
Slide 1UCSB Rod Production presented by Jim LambDOE review, January 20, 2004 UCSB Rod Production UCSB Rod Production, Jan , presented by Jim Lamb.
CMS Tracker Week – Module Test Meeting – July 2003 – Patrick Gartung 1 Long term rod testing software Patrick Gartung University of California, Riverside.
Slide 1Rod Production presented by Jim Lamb (UCSB)April 9, 2004 Rod Production Rod Production, April , presented by Jim Lamb (UCSB)
CMS Tracker Week – Module Test Meeting – April 2003 – Patrick Gartung 1 Status of US long term module testing Patrick Gartung University of California,
New Features of APV-SRS-LabVIEW Data Acquisition Program Eraldo Oliveri on behalf of Riccardo de Asmundis INFN Napoli [Certified LabVIEW Developer] NYC,
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
18-Jan-021W. Karpinski System Test Design verification of petals and interconnect boards and control links without detectors a)mechanics b)electrical.
Noise studies: hardware tests and preliminary results Anna, Anton, Giovanni, Pigi, Silvia, A. Boiano, A. Vanzanella.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
System Test Status Report R. D’Alessandro 1 TIB System Test Report Where were we ….., Mechanics (layer 3 prototype) Mother Cable & Interconnect Board System.
RPC PAC Trigger system installation and commissioning How we make it working… On-line software Resistive Plate Chambers Link Boxes Optical Links Synchronization.
Pixel Pilot system Simon Kwan November 8, 2011 Pixel Upgrade Parallel Session CMS Upgrade Week, Nov 7-10,
Online Calibration of the D0 Vertex Detector Initialization Procedure and Database Usage Harald Fox D0 Experiment Northwestern University.
Waclaw Karpinski General meeting CMS TRACKER SYSTEM TEST Outer Barrel –TOB Inner Barrel –TIB End cap –TEC TIB TOB TEC Different Geometries One.
TriDAS Equipment database Equipment database is partially built (Oracle). Currently consists of 2 separate databases.  DB I – database containing.
1 PreFPIX2 Inner board and test beam triggering Gabriele Chiodini Fermilab - Jan 07, 02.
W. Karpinski, Nov CMS Electronics week CMS Microstrip Tracker grounding & shielding of the CMS Tracker R. Hammarstrom (CERN EP/CMT) & W. Karpinski.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
FED RAL: Greg Iles5 March The 96 Channel FED Tester What needs to be tested ? Requirements for 96 channel tester ? Baseline design Functionality.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
News on GEM Readout with the SRS, DATE & AMORE
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
TDAQ Experience in the BNL Liquid Argon Calorimeter Test Facility Denis Oliveira Damazio (BNL), George Redlinger (BNL).
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
General Tracker Meeting: Greg Iles4 December Status of the APV Emulator (APVE) First what whyhow –Reminder of what the APVE is, why we need it and.
Juan Valls - LECC03 Amsterdam 1 Recent System Test Results from the CMS TOB Detector  Introduction  ROD System Test Setup  ROD Electrical and Optical.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
Meeting CERN 28 Nov A.B.Lodge - RAL 1 ECAL CMS ECAL Mechatronics Task Force Meeting.. CMS ECAL Mechatronics Scheme Applicability to EE Meeting held.
INSIDE in-beam PET system assembly and test at INFN Torino
Markus Friedl (HEPHY Vienna)
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
T1 Electronic status Conclusions Electronics Cards:
Redundancy Switching Components
HCAL Data Concentrator Production Status
Electrical and electronic systems projects
SIT AND FTD DESIGN FOR ILD
Large CMS GEM with APV & SRS electronics
Design and fabrication of Endcap prototype sensors (petalet)
UCSB Testing Status Anthony Affolder
Work flow Lyon Karlshrue 14/11/2018 Nick Lumb Preparation (no TEC)
Services mock-up Full-scale mock-up of one half end-cap.
The digital read-out for the CSC system of the TOTEM experiment at LHC
Vienna Module Production
RPC Detector Control System
Overview of T1 detector T1 is composed by 2 arms
RPC Detector Control System
The digital read-out for the CSC system of the TOTEM experiment at LHC
Design Principles of the CMS Level-1 Trigger Control and Hardware Monitoring System Ildefons Magrans de Abril Institute for High Energy Physics, Vienna.
US Module Testing Progress Report
RPC Detector Control System
TEC assembly and commissioning at Lyon
US Module Testing Progress Report
US Rod Burn-in Readiness DAQ Hardware/Power Supplies
RPC Detector Control System
Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
TEC Ring 2 module prototypes J. Hrubec / Inst. für Hochenergiephysik
Proposal to modify the TEC control loop schema
Presentation transcript:

System Tests at Lyon From Aachen: ICB for front petal side A, disks 4-6, rings 4 and 6 From CERN: CCU25 Tests (M. Ageron): FEC ring and I2C addressing Test for voltage oscillations Data acquisition for system tests. 18/09/2018 Nick Lumb

Overall set-up 18/09/2018 Nick Lumb

Connection details 18/09/2018 Nick Lumb

FEC ring ICB has connectors for kapton cable from DOH. Don’t have DOH so built adapter board to allow clk and data to arrive/return directly to/from FEC. FEC CCU1 CCU2 ICB clk/data Cable/reset adapter DOH adapter board 18/09/2018 Nick Lumb

Raw data 18/09/2018 Nick Lumb

Over-voltage study Response to sudden application of power on 2.5V line. Smooth increase to maximum – no evidence of over-voltage problem. But only one module! 18/09/2018 Nick Lumb

Next Steps Test redundancy (“B” lines). Not entirely trivial: needs hardware and software modifications. Dark box to house full petal under construction. Contains metal plate to mount ICB and modules. Integrated cooling loop. Install 4 modules in ring 6 positions: We have 4 necessary opto-hybrids. Will receive 3 modules this week from Aachen; our old module must be repaired. Read out with XDAQ – pedestals, noise, etc. Check for dangerous LV oscillations. Further 4 hybrids at ring 4 positions: Need 4 additional opto-hybrids. Need LVDS buffers for ICB plus connectors. Need 4 hybrids (on frames?) 18/09/2018 Nick Lumb

Next Steps (cont.) Equip ring 3 positions: need ICB for front petal side B, plus hybrids and opto-hybrids. 18/09/2018 Nick Lumb

Data Acquisition “CMS-like” system developed by L. Mirabito et al. Recent integration into XDAQ framework facilitates task sharing between processors (Event Builder; FED, FEC, TSC control; Monitoring, etc). Java-based (JAS) monitoring developed at Lyon well suited to large number of histograms (tree-like directory structure). Successfully operated for May PSI test-beam: 12 modules -> 24 FED channels, high event rate. Runs for “old” CCU already in Lyon; will upgrade for CCU25. 18/09/2018 Nick Lumb

XDaqWin control 18/09/2018 Nick Lumb

Monitoring 18/09/2018 Nick Lumb

Monitoring (cont.) 18/09/2018 Nick Lumb

Conclusions Data from a single module on an ICB has been successfully read out via opto-hybrid. No problem running with 2 CCU25s (difficulties initially with one CCU plus bypass). No evidence of over-voltages when applying power. Will continue study with more modules for ring 4 and ultimately equip whole of group II. CMS-like data acquisition system works with CCU25. Next step: adapt PSI-style XDAQ implementation. 18/09/2018 Nick Lumb