PSB Injection scheme in the Linac 4 era

Slides:



Advertisements
Similar presentations
Introduction to Alternating Current and Voltage
Advertisements

RFQ Tuning and RFQ Control Status
Sinusoidal Waves. Objective of Lecture Discuss the characteristics of a sinusoidal wave. Define the mathematical relationship between the period, frequency,
This lesson covers the following outcomes Unit 54 P1, P7, P8 Unit 6 P10, P11.
Sine waves The sinusoidal waveform (sine wave) is the fundamental alternating current (ac) and alternating voltage waveform. Electrical sine waves are.
Module 4: Analog programming blocks. Module Objectives Analyze a control task that uses analog inputs. Connect a potentiometer to LOGO! controller and.
Chapter 2: Fundamentals of Data and Signals. 2 Objectives After reading this chapter, you should be able to: Distinguish between data and signals, and.
PSB magnetic cycle 160 MeV to 2 GeV with 2.5E13 protons per ring A. Blas 2 GeV magnetic cycle 29/04/ Requirements 1.Present performance: 1E13p from.
22/03/1999A.Blas1 Hollow bunches A. Blas, S. Hancock, S. Koscielniak, M. Lindroos, F. Pedersen, H. Schonauer  Why: to improve space charge related problems.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, N.Kazarinov.
SNS Integrated Control System SNS Timing Master LA-UR Eric Bjorklund.
Booster Cogging Upgrades Craig Drennan, Kiyomi Seiya, Alex Waller.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
Linac4 FBCT’s 18/ L4 BI BCT review Lars Søby On the behalf of: M. Andersen, D. Belohrad, L. Jensen, Franco Lenardon and J. C. Allica Santamaria.
RF Cavity Simulation for SPL Simulink Model for HP-SPL Extension to LINAC4 at CERN from RF Point of View Acknowledgement: CEA team, in particular O. Piquet.
LLRF Cavity Simulation for SPL
PSB Injection Sequencing in the Linac 4 Era PSB Injection Sequencing in the Linac 4 era Alfred BLAS 1 Synthesized information from: M.E. Angoletta, P.
Energy calibration at LHC J. Wenninger. Motivation In general there is not much interest for accurate knowledge of the momentum in hadron machines. 
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
January 5, 2004S. A. Pande - CAT-KEK School on SNS MeV Injector Linac for Indian Spallation Neutron Source S. A. PANDE.
RF Cavity Simulation for SPL
1 FFAG Role as Muon Accelerators Shinji Machida ASTeC/STFC/RAL 15 November, /machida/doc/othertalks/machida_ pdf/machida/doc/othertalks/machida_ pdf.
Timing Requirements for Spallation Neutron Sources Timing system clock synchronized to the storage ring’s revolution frequency. –LANSCE: MHz.
New PSB Beam Control Upgrade of daughter cards Alfred Blas PSB rf Working group meeting 24/03/ Generation of REV clocks 2.Synchronization with.
Adapting the LHC 1TFB electronic circuit to other equipments The candidates are: PS 1TFB PS TFB PS CBFB PSB TFB PSB 1TFB 1 Alfred Blas Working group meeting.
Review on the PSB with Linac 4 - rf aspects - Review on PSB with Linac 4 / rf aspects1Alfred BLAS 15/01/2009  Beam loading in PSB cavities  PSB transverse.
LLRF FOR CHOPPER Grégoire Hagmann Philippe Baudrenghien BE/RF/FB February 24th, 2013.
PSB – Linac 4 Synchronization Alfred Blas PSB with Linac 4 Working group meeting 24/04/ Summary of discussions held with M.E. Angoletta, C. Carli,
Requirements for the PS/PSB TFB board 1 Alfred Blas Working group meeting - 07 December Sampling frequency 2.Required Delayed Clocks.
Bunch Numbering P. Baudrenghien AB/RF for the LHC/RF team.
PSB ring inhibit in the Linac 4 era A. Blas PSB LIU meeting 07/03/ Summary of discussions involving (mainly): Jose-Luis Sanchez Alvarez Philippe.
SPS 200 MHz LLRF upgrade Part 2: Implementation Philippe Baudrenghien, Grégoire Hagmann,
F D F November 8, 2006Alessandro G. Ruggiero1 of GeV 10-MWatt Proton Driver Target 200-MeV DTL 1.0-GeV FFAG H – Stripping Foil Injection Energy,
Longitudinal Painting S. Hancock p.p. G. Feldbauer.
Longitudinal aspects on injection and acceleration for HP-PS Antoine LACHAIZE On behalf of the HP-PS design team.
ELENA RF Manipulations S. Hancock. Apart from debunching before and rebunching after cooling, the principal role of the rf is to decelerate the beam and.
HP-PS beam acceleration and machine circumference A.LachaizeLAGUNA-LBNO General meeting Paris 18/09/13 On behalf of HP-PS design team.
Neutrino Factory by Zunbeltz, Davide, Margarita, Wolfgang IDS proposal.
23/06/2011 Linac4 BCC meeting. 23/06/2011 Linac4 BCC meeting Watchdog = Machine protection element whose function is to cut the beam if losses exceed.
LLRF regulation of CC2 operated at 4˚K Gustavo Cancelo for the AD, TD & CD LLRF team.
RF manipulations in SIS 18 and SIS 100 O. Chorniy.
Beam Manufacture in PS2 M. Benedikt, S. Hancock. LHC Beams in the PS by 2015 Typeh injε l inj [evs] h ejN bunch ej RF ej [MHz] ε l ej [evs] τ ej [ns]
RF acceleration and transverse damper systems
Challenges of Dual Harmonic RF Systems
L4-PSB working group meeting 25/06/2009
Status of the PS TFB Hardware Overview Machine results To be done
Impact of the current debuncher limitations (…can we get rid of longitudinal painting?)
402.5 MHz Debunching in the Ring
Alternative/complementary Possibilities
Tomography at Injection in the PSB
PSB rf manipulations PSB cavities
RF and Sequences Andy Butterworth BE/RF
PS 1TFB preliminary specifications
New AD Production Beam in the PSB
SNS Timing System EPICS Workshop April 28, 2005 Coles Sibley
Electric Circuits Fundamentals
electronics fundamentals
Thyristor Converters Chapter 6
Synchronization Process PSB example
Electronics Fundamentals
Beam dynamics requirements after LS2
November 14, 2008 The meeting on RIKEN AVF Cyclotron Upgrade Progress report on activity plan Sergey Vorozhtsov.
November 7, 2008 The meeting on RIKEN AVF Cyclotron Upgrade Progress report on activity plan Sergey Vorozhtsov.
Thyristor Converters Chapter 6
PSB rf Foreseen limitations with 2 E13 p at 2 GeV
PSB magnetic cycle 900 ms MeV to 2 GeV
PSB – Linac 4 Interfacing
Kicker and RF systems for Damping Rings
Kicker specifications for Damping Rings
Longitudinal Focusing & The Gamma Transition
Presentation transcript:

PSB Injection scheme in the Linac 4 era Introduction The presented scheme will allow injecting the beam either in an accelerating bucket or with a fixed rf frequency. Alfred BLAS 23/01/2009 PSB injection scheme with Linac 4 Alfred BLAS

Painting h1 Bucket limits h2 Buckets limits ΔT1 = f(ΔE, φS , V1, V2) ΔT2 = f(ΔE, φS , V1, V2) ΔT3 = f(ΔE, φS , V1, V2) ΔT4 = f(ΔE, φS , V1, V2) 4 timing values should be supplied for each injected turn Beam Revolution reference tics Alfred BLAS 23/01/2009 PSB injection scheme with Linac 4 Alfred BLAS

PSB injection scheme with Linac 4 Ring switching Ring X-1 Distributor field Ring X Chopping during one period to maintain rf synchronism T > 1 us -> too long Revolution Reference All rings cannot be kept in phase at injection due to the chopper BEAM-OFF duration limited to 1μs => different phase in each ring The dephasing will be chosen as a 1/10th of the revolution multiple to adapt to the present philosophy allowing injecting multiples of a 1/10th revolution. Alfred BLAS 23/01/2009 PSB injection scheme with Linac 4 Alfred BLAS

Equipment to be synchronized Pre-chopper +LEBT Debuncher RF Feedforward Source Distri 4*rf 180 m 45 keV Chopper Amplitude modulated for energy modulation (painting) RF feedforward, energy modulator, debuncher, distributor and rf have to be in phase with the Chopper Alfred BLAS 23/01/2009 PSB injection scheme with Linac 4 Alfred BLAS

Practical considerations - 1 The longest injection will take 100 μs in each ring The field increase will be 1.2 G/100μs This means ΔE = 154 keV/100 μs if following the ΔR =0 accelerating law (bucket height = 2.5 MeV). This increase of momentum corresponds to a shift in energy of the accelerating bucket. This means ΔR = -0.8 mm/100 μs if following the Δp = 0 frequency law. This is the radial steering error that will be obtained if injecting at a fixed energy. This means ΔE = -14.3 keV/100 μs and ΔR = -0.86 mm/100 μs if following the Δf = 0 This decrease of momentum corresponds to a shift in energy of the decelerating bucket. Δf = 31.6 Hz/0.1Gauss (ΔR = 0 law) = 379 Hz/100μs with 1.2 Gauss/100μs Alfred BLAS 23/01/2009 PSB injection scheme with Linac 4 Alfred BLAS

Practical considerations - 2 The chopper gates a beam that will arrive in the rf buckets 2μs (flight time) later. If there is a phase change in the rf buckets, the chopper needs to know 2 μs in advance At the end of the switching from one ring to the following, the rf signal of the latter needs to be in a pre-determined phase (although not necessarily at the same frequency) with respect to the previous ring rf. All rings will have the same rf frequency at the very start of the injection in each of them. After the start of the injection from this initial rf frequency and during the entire injection process, each ring is susceptible to follow an independent frequency law. Alfred BLAS 23/01/2009 PSB injection scheme with Linac 4 Alfred BLAS

Practical considerations - 3 All rings will be synchronized to a common reference before the start of the injection process with a dephasing determined by the injection conditions in the previous ring(s). All the process occurring during the injection in each ring needs to be predetermined as the synchronization phase of the following ring cannot be changed instantaneously (>>10 μs response time) If the chopper receives the common injection reference rf signal, it can calculate the phase advance due to the pre-determined frequency program initiated in each ring during injection. For the chopper timing to be in phase with the rf change, it must be aware of the frequency change timing (the foreseen beam-control changes its frequency at a rhythm dictated by a so-called “fast-loop-clock”. The frequency step (for the ΔR = 0 law) will be 19 Hz/5μs. (5μs is the foreseen “fast-loop-clock” period). Alfred BLAS 23/01/2009 PSB injection scheme with Linac 4 Alfred BLAS

Practical considerations - 4 Note that, due to the fact that the rf cannot change in between 2 “fast-loop-clock” tics, below 5 injected turns there will be no frequency change. For a perfect tracking of the frequency change, the injection process should be in phase with the “fast-loop-clock” . In case the acceleration is not at all taken into account the integrated phase error over one injection of 100 μs would be : 13.6 degree of the revolution signal In case the frequency increase is just averaged at the chopper level (the logic estimates an average frequency increase without checking the actual value), the peak phase error would be < 4.3 mo Averaged Frequency Frequency Updated every 5 μs 379 Hz 100 μs Alfred BLAS 23/01/2009 PSB injection scheme with Linac 4 Alfred BLAS

Practical considerations - 5 In case we want to update the rf frequency at the B-train rate (1 tic / 8.3 μs) and estimate its average value at the chopper level; the maximum phase error would be equal to 50 mo. (The initial rf would still need to be synchronized to a single reference) Estimated Frequency 31.4 Hz 8.3 μs Alfred BLAS 23/01/2009 PSB injection scheme with Linac 4 Alfred BLAS

PSB injection scheme with Linac 4 Injection in a stationary bucket at a fixed rf frequency Alfred BLAS 23/01/2009 PSB injection scheme with Linac 4 Alfred BLAS

PSB injection scheme with Linac 4 Injection in an Accelerating Bucket Alfred BLAS 23/01/2009 PSB injection scheme with Linac 4 Alfred BLAS

PSB injection scheme with Linac 4 Injection with a Δp = 0 rf frequency law Alfred BLAS 23/01/2009 PSB injection scheme with Linac 4 Alfred BLAS

Hardware layout Injection Sequencing control Application Pre-chopper +LEBT Debuncher Source Distri 4*rf 180 m 45 keV To Linac rf feed-forward Chopper ON/OFF Injection Sequencing control Voltage modulation Phase modulation Number of turns + VH1 BIXi.SDIS (One line with 5 pulses possible) Start injection pulse Ri (One line with 4 pulses possible) Linac rf Rev + 10* REV Rf reference source (h1 or h2) BIX. SINJ Fixed Injection reference source ΔE 4 rings Application 4 timing values for each injected turn Alfred BLAS 23/01/2009 PSB injection scheme with Linac 4 Alfred BLAS

Requirements for the rf Low-Level The beam control of each ring needs to be able to synchronize its rf to a signal that can be either h1 or h2, with a phase offset programmed at an application level and obtained in ppm. This synchronization will occur prior to injection At the instant of the beginning of the injection, each ring will receive an external start pulse, from which the beam control will start following a frequency law driven either by the B-train or by an internal process. In both case the frequency law will be known to the exterior. The reference rf could be issued from the R1 LLRF (last ring that will stay at a fixed frequency until it comes to its turn), but there is not much to gain using this approach. The economy of one extra rf source would be obtained at the price of having R1 treated as a special case with no injection synchronization and a specific treatment within the injection sequencing control (ISC) because the injection in ring 1 would become the only case where the reference train could be used without applying the phase advance corresponding to the accelerating law (There would also be a negligible time lag problem due to the fact that the rf will increase but the effect on the beam will be delayed by the rf-ISC-chopper-ring delay) Alfred BLAS 23/01/2009 PSB injection scheme with Linac 4 Alfred BLAS

Requirements for ISC Injection Sequencing Control The ISC will receive values indicating the number of turns injected in each ring, so it can provide the required pulses, using the reference rf. The ISC will receive delay values representing a time lag from a reference tic (see slide 2). These delay values will be available for each single turn. The unit should be able to create the required windows with an absolute precision in the range of 1 ns (1o of the rev = 2.7 ns) The remaining part of the circuit concerns the elements of the L4 line itself and will thus be treated by the team in charge. Alfred BLAS 23/01/2009 PSB injection scheme with Linac 4 Alfred BLAS

Requirements for the application layer Knowing the number of turns injected in each ring (including decimal values by 1/10th of a turn), knowing the Bdot at injection, knowing the injection reference frequency, calculate the initial phase (inj synchro phase value) of each ring with respect to the reference at injection, calculate the timing table (with respect to the reference rf) used to trigger the chopper for each single turn of each single ring. Alfred BLAS 23/01/2009 PSB injection scheme with Linac 4 Alfred BLAS