New Options for DryCool Products

Slides:



Advertisements
Similar presentations
100% Outside Air and Dehumidification Management
Advertisements

100% Outside Air Systems for Light Commercial Applications ASHRAE Luncheon March 8, 2006 Outside Air Delivery Strategies Direct Reheat Reclaim (DX) Methods.
Chilled Beam Presentation
Presented by: Terry Stohs Viessmann Manufacturing Company Inc.
Engineer Presentation
ASHRAE Presentation: VRF Overview Mitsubishi Electric Presenter: Phone number ©2011 Mitsubishi Electric& Electronics USA, Inc.
Energy Recovery System Hadi Fattah Chris Korkuch Scott Lacey Ryan Neary Colin O’Neill.
Brett Graham Habegger Corporation Midwest Regional Sustainability Summit May 1, 2015.
Best Direction System Ltd.
COMMERCIAL REFRIGERATION
Active beams versus VAV with Reheat Analysis of May 2013 ASHRAE Journal article Ken Loudermilk Vice President, Technology & Developement.
 Install new air cooled high efficiency screw chiller (variable speed)  Install new fan coils with ECM motors and low temperature heating coils and proper.
Important variables Water: Air: Conversion:
Announcements Midterm Project Prepare groups of 3 to 4 students You can submit the list at the end of next class Midterm Exam 03/09/10 - In class Exam:
1 Medical Office Building. 2 Occupancy – 400 persons 8 a.m. – 5 p.m. Monday - Friday Building Characteristics Three stories 40,000 square feet (200’ x.
Lecture Objectives: Finish with HVAC Systems Discuss Final Project.
MCS’S MAGNUM DIAGNOSTICS PACKAGE Visit us at
Lecture Objectives: Specify Exam Time Finish with HVAC systems –HW3 Introduce Projects 1 & 2 –eQUEST –other options.
NOVO ETS IMPROVING YOUR ORGANIZATIONS’ ENVIRONMENTAL, HEALTH AND SAFETY PERFORMANCE ENERGY MANAGEMENT IN THE CONTEXT OF GREEN PRODUCTIVITY.
Engineer Presentation. Efficiency - GAS Clamshell Heat Exchanger 80% Efficient.
A Trane Air Conditioning Clinic Psychrometry Air Conditioning Clinic TRG-TRC001-EN © American Standard Inc
Pressure-Enthalpy and the Variable Refrigerant Cycle
Roof Top Unit Overview (MAGNUM) Visit us at Revision- 12/17/2015.
Objectives Finish DOAS Control Terminology Types of controllers
Introduction to Energy Management. Week/Lesson 13 Control Strategies for Occupant Comfort.
Learning Outcomes Upon completion of this training one should be able to: Identify hydronic chilled water system applications. Define the difference between.
Lecture Objectives: Learn about processes in AHU Swimming pool example Het recovery systems.
Alexander Radkoff Mechanical Option | Spring 2014 Advisor: Dr. Stephen Treado 123 Alpha Drive Pittsburgh, Pennsylvania
Advanced Humidity Control. Energy Efficient Desiccant Based Dehumidification New class of desiccants that regenerate at lower temperatures Now able to.
A New (Rational) Way To Condition Air (and Save Energy) AEE, Philadelphia February 18 th 2016 Andrew Mongar, President, AirGreen LLC.
What makes up a Unico System
Objectives Finish heat exchanger Heat exchanger performance
WELCOME. Glycol Refrigeration A most basic definition of refrigeration is taking heat from someplace we don’t want it and moving it to someplace where.
Design & Analysis of Psychrometric Processes Various ways of Generating A Comfort… BY P M V Subbarao Associate Professor Mechanical Engineering Department.
Pressure Regulators KVR + NRD Presentation , Jbm - Page 1.
Doug Jefferson, Business Development Engineer
Ritchie Yellow Jacket Instrument Applications
Munters DH Systems for Hospital Applications
Virginia Product Overview
Founder Munters AB Carl Munters (1899 – 1989) Swedish Inventor
Indoor Pool Design and Dehumidification
Indoor Pool Design and Dehumidification
Munters DOAS, Chilled Beams and VRV
Energy Efficiency in District Coiling System
Munters DOAS and Chilled Beams
Brian Wallingford, Applications Engineer
Chilled Beam Performance:
Cheryl Hughes Regional Sales Manager October 6, 2015
Munters DH Systems for Freezer Applications Presented by: Mike Sadosky
Project.
Variable Frequency Drive (VFD)
Roof Top Unit Overview (MAGNUM)
Engineering Presentation
Presented by Scott McGinnis June 2012
Variable Refrigerant Volume
Munters Heat Exchangers DOAS Review: Cost to Operate & Energy Analysis
Lecture Objectives: Discuss heat recovery systems
Frenger “Radiant” chilled beam performance at 1 Shelly St - Sydney
Objectives Learn about 1) Control for HVAC systems
Lecture Objectives: Discuss HW3 Learn about Heat recovery
Lecture Objectives: Finish swimming pool example
VITALITY Large Splits Johnson Controls PowerPoint Guidelines | July 21, 2009.
Objectives Finish with Heat exchangers
NRL NRL - Welcome to the NRL Sales Training Program
NRL NRL - Welcome to the NRL Sales Training Program
NRL NRL - Welcome to the NRL Sales Training Program
Objective Revie the Cooling Cycle Learn about air distribution systems
NRL NRL - Welcome to the NRK Sales Training Program
Liebert DSE High efficiency thermal management
NRL NRL - Welcome to the NRL Sales Training Program
Presentation transcript:

New Options for DryCool Products Presented by: Scott McGinnis Regional Sales Manager LEED® Associate

What market has asked for Digital Scrolls, even though they don’t always know why Discharge Air Dew Point control Limits of Desiccant Wheel Reheat Post cooling options More efficient HCU-ERV with less restrictions Lower Dewpoints No RA CFM limitations (old 70% rule) Plate Exchangers vs. wheels Larger Sizes (Greater than 16,000)

We have all that available All the new options and layout are available Require help form your AE Pricing Performance Layouts As these become more popular will be integrated into the Air Manager selection software

Digital Scroll Option Very popular technology Keeps compressor motor running Allows for part load (~10% minimum) Provides Modulating DX coil Munters has been experimenting with effect on Dh Wheels Munters also tested Danfoss VFD Proved too costly for benefit

First On / Last Off = Standard Scroll Must have Reheat

91F/65dp 82F/56dp 74F/51dp 71F/45 dp 50F 83F/72 dp H

79F/55dp__77F/53__75F/52 82F/56dp 74F/51dp 50F 83F/72 dp H

B compressor is digital Programmed to modulate up and down for two reasons 1. Discharge Air Dew Point control: Set a leaving air dewpoint and maintain that DryBulb will fluctuate 2. Set a maximum leaving discharge air temp Set at 75F to May over dry the air, but will limit the discharge air so not so high

Auto Mode – DH with SA maximum limit

Digital in B Energy Recovery Indoors without remote ACCU DryCool ERV

DryCool ERV B A B compressor is the Digital Always have 50% dehumidification Modulate then from 60% up to 100% Same control options Discharge Air Dewpoint Max Sensible Temp 82F/54 dp 79F/52dp 77F/50dp A B 75F/48 dp 72F/47 dp

Digital Scroll Availability and Adds 15 tons digital is the largest we will use right now Up to all 60 ton, 4 compressor machines Available on all HCUs, expect the 1680 DryCool ERV up to 1648 Split B compressor into 2 independent circuits (2 x 12 tons) DryCool Standard Add ALC controller Price add for Digital Comp and electronics DryCool ERV Add only for Digital Comp and electronics

HCU-ERV or “3” Fan ERV Take a DryCool Standard Air Cooled or Water Cooled System Reactivation Fan with OA inlet for Reactivation Standard CFM/Ton ration for Attach an enthalpy wheel Module to the back end Enthalpy Wheel EA Fan Recirculation Damper Actually the first HCU-ERV produced

ERV DryCool

3 FAN ERV No 70% RA rule, just standard enthalpy wheel rules ACCU or WCCU Lower dewpoints Better Staging with 4 compressors and digital options Uneven RA airflow Lower Winter Energy as there is no Reactivation Air in winter Works for all DryCool Standard Models

New 3 Fan Unit: New Design, on case by case basis Condenser Coils A: Standard B: Digital 3 2 1

New 3 Fan Unit: New Design, on case by case basis No 70% Rule, uneven airflows thru Enthalpy Wheel No Winter Pressure drop penalty Lower Dewpoints 2 compressors A = Standard B = Digital So, adds the discharge air dew point and max dry bulb control

New 3-Fan

Special DryCool Units Turn to DesChamps factory when needing something unique Plate Exchanger or Heat Pipe HCUs Hybrid Chilled Water/DX Post Cooling Coils (Water or DX)

Chilled Water / DX with Post Cool Chilled Water

DryCool Counter Flow Z-Duct HX

Total Tons: CW (56) + DX (84) + Post (13) = 153 Tons 57F 82F/80Gr 57F Dry Air After E Wheel 65F/80Gr 69/44Gr 56F/61Gr Total Tons: CW (56) + DX (84) + Post (13) = 153 Tons

Semco 182”w x 146”h x 448” L

Remember!!! Digital Scroll Availability and Adds 15 tons digital is the largest we will use right now Up to all 60 ton, 4 compressor machines Available on all HCUs, expect the 1680 DryCool ERV up to 1648 Split B compressor into 2 independent circuits (2 x 12 tons) DryCool Standard Add ALC controller Price add for Digital Comp and electronics DryCool ERV Add only for Digital Comp and electronics

HCU-ERV or “3” Fan ERV Take a DryCool Standard Air Cooled or Water Cooled System Reactivation Fan with OA inlet for Reactivation Standard CFM/Ton ration for Attach an enthalpy wheel Module to the back end Enthalpy Wheel EA Fan Recirculation Damper Actually the first HCU-ERV produced

Larger or Custom units Look to DCT for more answers Post Cooling with digital scroll or chilled water Larger cfm units DryCool with Plate Exchangers Work with your DCT Applications Enigineer

Regional Sales Manager Questions??? Saving the planet, one LESS btu at a time Scott McGinnis Regional Sales Manager