ILH ED Door to Doc. Two Phase Improvement 1.Combine Triage and Quick Reg March 16, 2009 2.Implement ED KaT July 16, 2010.

Slides:



Advertisements
Similar presentations
Put the following numbers in order from greatest to least: 1) 2) 3)
Advertisements

Timeline and Product Development Aug-Oct 2007Recovery Plan completed and adopted Recovery Plan Adaptive Management Framework developed and adopted.
Status of Publications Papers written by Brad Timerson with numerous co-authors.
NANPA Oversight Working Group Status Report to the NANC April 17, 2001 Chair Pat Caldwell.
From 31 July 2009 To 01 August 2010 RC-W CERP PROJECTs REPORTED IN CIDNE IN THE LAST 12 MONTHS UNCLASSIFIED.
NTDB ® Annual Report 2010 © American College of Surgeons All Rights Reserved Worldwide National Trauma Data Bank 2010 Annual Report.
© 2010, American Heart Association. All rights Association of Hospital Primary Angioplasty Volume in ST-Segment Elevation Myocardial Infarction With Quality.
I-95/Route 630 Interchange, Alternative E FUNDING (Cumulative) SCHEDULE JULY 2007 JULY 2008 JULY 2009 JULY 2010 JULY 2011 JULY 2012 JULY 2013 JULY 2007.
December 15, Financial Overview of General Fund October State Adopted Budget Cash Flow Issues Multi-Year Projections Based on States October Budget.
Auto-Moto Financial Services- The Old Process
Door to Balloon Times: Achieving 90 Minutes and Less.
Evaluation of a new Health Code requirement for discharging infectious tuberculosis patients from NYC hospitals Michelle M. Macaraig, MPH Assistant Director.
Hydro Peaking Capacity Analysis & Northwest Regional Forecast Comparison Resource Adequacy Technical Committee July 28, 2010.
Because I said so… Objective: To identify and use inductive and deductive reasoning.
August 2009 by Mark O'Brien, CEO Hardship & Residential Tenants Presentation to Community & Financial Hardship Conference.
Jacqui Dowd Introduction to LibQUAL+ University of Westminster 5 th February 2010 LibQUAL+ v LibQUAL Lite at the University of Glasgow.
BEST 2014 BEST special topic 2013 Use of PT information channels Kjetil Vrenne, BEST Project Manager 2014.
For Educational Use Only © Factoring ax 2 + bx + c Brian Preston Algebra
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
Stroke Care in the UK Tony Rudd. Organisation of Services 120,000 new strokes per year Approx 200 hospitals treating acute stroke patients Most services.
Pembrokeshire County Swimming AGM Coaches’ Report 2009/2010.
Special Education Finance Beverly Public Schools December, 2010.
Romania Mean Wind Speed / metres per second Mast height – 80 metres Wind Data recorded over 2 years
UK Renal Registry 17th Annual Report Figure 5.1. Trend in one year after 90 day incident patient survival by first modality, 2003–2012 cohorts (adjusted.
Presented to IHA Quality Encounter “Delivering Measurable Results Through Process Improvement” June 16, 2009 Robin Oakley, Manager CCU Susan Eller, Manager.
EDIS Emergency Department Information System
Colleen Jarosz, Cathy Lai, Dan Post and Cathy Shipp
Nevada Taxable Sales Records and Jobs Reports for Restaurants and Bars Since the Implementation of the Nevada Clean Indoor Air Act  Restaurant & Bars.
Christopher DeLuca, MD, FACEP Vice President, Performance Improvement Emergency Resource Management, Inc. Clinical Assistant Professor, Emergency Medicine.
Phase Difference = Phase Difference = 0.05.
Surge Capacity Plan EMERGENCY DEPARTMENT.  Surge capacity strategies will be implemented when volume exceeds staffing and/or treatment space POLICY:
EMERGENCY ROOM OF THE FUTURE LEVERAGING IT AT WELLSTAR HEALTH SYSTEM: KENNESTONE EMERGENCY DEPARTMENT Jon Morris, MD, FACEP, MBA WellStar Health Systems.
Notes Over 12.7 Using a Normal Distribution Area Under a Curve.
Assoc Prof Dr Mohd Idzwan bin Zakaria
HIT Implementation Results David Anderson, Fermin Barrueto, Bruce Golden, Jon Mark Hirshon, Laura Pimentel, Ed Wasil 1 6/4/2013.
EFFECTS OF RESIDENTS ON EFFICIENCY IN AN EMERGENCY DEPARTMENT J. Silberholz, D. Anderson, E. Sze, J. Lim, E. Taneja, E. Tao, B. Kubic, K. Johnson, D. Kalowitz,
1 Ardavan Asef-Vaziri Oct. 2011Operations Management: Waiting Lines 1 80 patients per hour arrive at a hospital emergency room (ER). All patients first.
Door to Doc (D2D) Reduces ED Patient “Walkout” Rate
Emergency Department November 8, 2005 ”Wall time” No data collected –Current systems do not allow for collection of meaningful metrics –In process of.
LRS Progress Report and Action Plan Update to the Profiling Working Group July 24, 2006.
Modeling Discrete Variables Lecture 22, Part 1 Sections 6.4 Fri, Oct 13, 2006.
Evaluation of the TRICARE Program FY 2011 Data Sources (cont.) Thus, rates calculated from Version 3.0 responses are compared with benchmarks from the.
EMERGENCY ROOM SCHEDULING
This is an example text TIMELINE PROJECT PLANNING DecOctSepAugJulyJuneAprilMarchFebJanMayNov 12 Months Example text Go ahead and replace it with your own.
4 BIT ADC BIT STREAM THE SOUND IS MEASURED (SAMPLED) AT REGULAR INTERVALS AND GIVEN A VALUE FROM 0 TO 15. THIS BINARY VALUE IS SENT TO A PARALLEL TO SERIAL.
11 WAYS TO DECREASE DOOR TO NEEDLE TIME YOU CAN DO IT FASTER Jeff Nickel, MD FACEP ED Medical Director Parkview Regional Medical Center.
VERTICAL UNIT Emergency Department Case Studies. Objective Answer the following questions: –“What is a Vertical Unit?” –“Why did we implement?” –“How.
HOKLAS th Edition Implementation Schedule 21 Oct 0515 May 0615 Apr 0715 May 07 Assessments:8 th ed. 7 th ed. based applications, reassessment and.
High Level Process Mapping
School Leadership Development Second Quadrant
حول مفهوم الذبح الحلال في الإسلام؟
Safer Care Homes Collaborative

PAIN OUT network in Mexico
ADULT SWIM LESSONS 2017 MONTHLY SCHEDULE
ADULT SWIM LESSONS 2018 MONTHLY SCHEDULE
The Effect of Emergency Department Waiting Time
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
TGac Status and Timeline
USING SIMULATION TO IMPROVE ED INTAKE PROCESS - TEAM TRIAGE
RTA TIG Closing Report Date: Authors: November 2018
RTA TIG Closing Report Date: Authors: March 2019

Births as per Civil Registration System,
Month Rainfall (mm) Temp Jan Feb March 34 April 38 May June July
NEMSIS V3.5.0 Timeline developed at NEMSIS Annual Meeting 2017
IEEE Task Group r (Fast Roaming) Opening Report May 2008

Sep Oct Nov Dec Jan Feb Mar Apr May
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Presentation transcript:

ILH ED Door to Doc

Two Phase Improvement 1.Combine Triage and Quick Reg March 16, Implement ED KaT July 16, 2010

Before After

Serial to parallel

SMS Oct. intervals compared minutes medians significant Triage reg combined

SMS Nov. intervals compared (shows sustained for 2 months) minutes NEW DATA Not yet submitted significant Triage reg combined ED KaT

SMS to ED KaT Oct. comparison (arrival > triage > reg > physician) minutes

SMS to ED KaT Oct. comparison (arrival > reg > triage > physician) minutes medians 1440/5054

New Phenomena 1.Serial changed to parallel process (Quick reg. with triage) 0 minutes? Really? 2.Bedside registration

Results Combining registration and triage shortened some time intervals, but had no significant effect on door to doctor time. Implementation of ED KaT significantly shortened door to doc. (by 26 to 39 minutes) – (Other improvements may have had an effect. RTA, UCC) ED KaT times are longer than SMS times. – (ED KaT is probably more close to real time.) Results have sustained over at least 2 months.