ISCCP and GSICS NOAA/NCEI Ken Knapp (& ISCCP Team)

Slides:



Advertisements
Similar presentations
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO Barbara J. Ryan Director, WMO Space Programme.
Advertisements

Sustained Coordinated Processing of Environmental Satellite Data for Climate Monitoring Sustained Co-ordinated Processing Of Environmental Satellite Data.
Satellite SST Radiance Assimilation and SST Data Impacts James Cummings Naval Research Laboratory Monterey, CA Sea Surface Temperature Science.
Cooperative Institute for Meteorological Satellite Studies University of Wisconsin - Madison Steve Ackerman Director, Cooperative Institute for Meteorological.
CALIBRATION AND RE-PROCESSING STATUS Calibration Status –VIS will be completed in September –IR will be completed in October –Microwave ready back to 98,
R. T. Pinker, H. Wang, R. Hollmann, and H. Gadhavi Department of Atmospheric and Oceanic Science, University of Maryland, College Park, Maryland Use of.
ISCCP Calibration 25 th Anniversary Symposium July 23, 2008 NASA GISS Christopher L. Bishop Columbia University New York, New York.
Prepared by Ken Knapp, NOAA/NCDC 3/19/2015.  ISCCP Background  Activities in 2014  Plans for 2015  Potential interactions with other SCOPE-CM projects.
Retrieval Algorithms The derivations for each satellite consist of two steps: 1) cloud detection using a Bayesian Probabilistic Cloud Mask; and 2) application.
MOLLY E. BROWN, PHD NASA GODDARD GIMMS Group Challenges of AVHRR Vegetation Data for Real Time Applications.
EUMETSAT, version 1, Date 06/06/2016 Coordination Group for Meteorological Satellites - CGMS Status report and recommendations from SCOPE-CM Chair: Ed.
Data Distribution/dissemination Method
Japan Meteorological Agency, June 2016 Coordination Group for Meteorological Satellites - CGMS Non-Meteorological Application for Himawari-8 Presented.
A Rising Expectation for ISCCP to produce Long-Term Climate Data Records on Satellite Cloud Climatology over 30 years prepared by Toshiyuki KURINO, JMA.
EUM/OPS/VWG/10/2623 GSICS meeting, March 2013, Williamsburg USA SCOPE-CM: Inter-calibration Projects Rob Roebeling, Jörg Schulz, Sebasien Wagner, and Tim.
NOAA GPRC Report 2013 GSICS Annual Meeting Williamsburg, VA 03/04/ /08/2013.
Japan Meteorological Agency, June 2016 Coordination Group for Meteorological Satellites - CGMS Japan Meteorological Agency JMA report on the status of.
Visible vicarious calibration using RTM
Users' Requirements During Algorithm Development
Masaya Takahashi Meteorological Satellite Center,
A. Lattanzio, R. Roebeling (EUMETSAT)
NOAA Report on Ocean Parameters - SST Presented to CGMS-43 Working Group 2 session, agenda item 9 Author: Sasha Ignatov.
PATMOS-x Reflectance Calibration and Reflectance Time-Series
Contents GSICS activities Visible channel calibration
NESDIS-JMA AHI Collaboration
Progress toward DCC Demo product
Extending DCC to other bands and DCC ray-matching
Spectral Band Adjustment Factor (SBAF) Tool
Meteorological Satellite Center Japan Meteorological Agency
Vicarious calibration by liquid cloud target
DCC inter-calibration of Himawari-8/AHI VNIR bands
JMA’s GSICS and SCOPE-CM activities Presented to CGMS-43 Working Group II session, agenda item 3 (from MTSAT-2) Japan Meteorological Agency.
Verifying the DCC methodology calibration transfer
Cal/Val Activities at CIRA
Masaya Takahashi on behalf of Kazumi Kamide
Fangfang Yu and Fred Wu 22 March 2011
SCOPE-CM: IOGEO GSICS GRWG & GDWG, March 2017, Madison, USA
GOES-R Hyperspectral Environmental Suite (HES) Requirements
Geostationary Sounders
Closing the GEO-ring Tim Hewison
Reprocessing of Atmospheric Motion Vector for JRA-3Q at JMA/MSC
Characterizing DCC as invariant calibration target
Manik Bali Jonathan Mittaz
JMA Agency Report 2017 Arata Okuyama, Masaya Takahashi and Hidehiko Murata Meteorological Satellite Center, Japan Meteorological Agency.
SCOPE-CM: IOGEO GSICS GRWG & GDWG, March 2018, Shanghai, China
Building-in a Validation cycle for GSICS Products
VIS/NIR sub-group discussion
Implementation of DCC at JMA and comparison with RTM
Planning comparison study SCM IOGEO and GSICS
GSICS Collaboration with SCOPE-CM IOGEO
Update on GSICS Product Development
Infrared Inter-Calibration Product Announcements
Generation of Cloud Products from NOAA’s Operational Satellite Imagers
SCOPE-CM: IOGEO GSICS GRWG & GDWG, March 2018, Shanghai, China
Inter-calibration of the SEVIRI solar bands against MODIS Aqua, using Deep Convective Clouds as transfer targets Sébastien Wagner, Tim Hewison In collaboration.
Andrew Heidinger and Michael Pavolonis
Dorothee Coppens.
Strawman Plan for Inter-Calibration of Solar Channels
Progress toward DCC Demo product
Implementation of DCC algorithm for MTSAT-2/Imager
Inter-band calibration using the Moon
GSICS Data and Products Servers
Andrew Heidinger JPSS Cloud Team Lead
SCM-06: Update on Inter-calibration of imager observations from time-series of geostationary satellites (IOGEO) 4 and 8 March 2019, Frascati, Italy Rob.
SCM-06: Update on Inter-calibration of imager observations from time-series of geostationary satellites (IOGEO) 4 and 8 March 2019, Frascati, Italy Rob.
Na XU Xiuqing HU Lin CHEN Ling SUN NSMC CMA
G16 vs. G17 IR Inter-comparison: Some Experiences and Lessons from validation toward GEO-GEO Inter-calibration Fangfang Yu, Xiangqian Wu, Hyelim Yoo and.
SCOPE-CM #10: Atmospheric Motion Vectors (AMV) and Clear/All Sky Radiances (CSR/ASR) from historical meteorological satellites in geostationary and polar.
Special Issue of the IEEE TGRS on “Inter-Calibration of Satellite Instruments”: 21 May 2019 Special session on re-calibration/re-processing – Discussion.
How good is IASI-A as an in-orbit reference in GSICS in LWIR and IR
Presentation transcript:

ISCCP and GSICS NOAA/NCEI Ken Knapp (& ISCCP Team) Future collaborations between GSICS and the ISCCP project NOAA/NCEI Ken Knapp (& ISCCP Team) Meteorologist, NOAA National Centers for Environmental Information March 2017 National Oceanic and Atmospheric Administration | National Centers for Environmental Information

Overview ISCCP Reprocessing ISCCP Calibration ISCCP Future Discussion Plans, Status, ISCCP Calibration Visible, IR Window ISCCP Future Discussion

ISCCP History B1 data rescue began Data collection for 5-year project begins Release of first set of cloud products (C) Pinatubo causes a pause New cloud products developed (D) B1 data rescue began Last year processed for ISCCP

ISCCP Processing

History is repeating: 1982 and 2017 ISCCP designated SPCs to produce B1/B2 SPCs could develop products for B1/B2 Full resolution was too much for most users ISCCP GPC Merged B2 data globally Created merged global products Similar problems being discussed here... Provide adjustments or Level 1B What do Agencies provide vs. GSICS/IOGEO?

ISCCP Reprocessing: Improvements New satellite data inputs Using full resolution AVHRR GAC data (moved to 4 km data from 32 km) Using ISCCP B1 data (moved to 10 km data from 30 km). New resolution Higher resolution inputs allow 1 deg products (previously, 2½ degree) New products ISCCP HXG - 10 km global merged product (radiances, cloud flag, cloud parameters)

ISCCP Reprocessing: New Types DX HXS Hi-res, piXel, Single-sat HXG Hi-res, piXel, Global (new product) DS HGS Hi-res, Gridded, Single-sat D1 HGG Hi-res, Gridded, Global D2 HGH Hi-res, Gridded, Hourly-monthly mean D3 HGM Hi-res, Gridded, Monthly mean GridSat-like

ISCCP Reprocessing: New Types HXS HXG HGS HGG (240x monthly) HGH (8x monthly) HGM

ISCCP Reprocessing: Schedule Phase I Base Period [7/1983 - 12/2009] May 2017 Phase II Extended Period [1/1982-6/1983 and 1/2010-6/2015] Aug 2017 Phase III Routine Updates [ 6/2015 - ’present’] 2018?

ISCCP Calibration

ISCCP Calibration: Use the Earth ISCCP uses the Earth as its calibration reference.

ISCCP Calibration: Use the Earth

ISCCP Calibration: Current capability Replicate original ISCCP Use heritage process to calibrate

ISCCP Calibration Nominal (NOM) Normal (NORM) Absolute (ABS) Calibration from the satellite provider Pre-launch calibration Normal (NORM) Inter-satellite normalization Absolute (ABS) Temporally stable

What are we calibrating? POES AVHRR GAC GEO - B1U data All meteorological GEO satellites GOES 4-15 GMS 1-5, MTS 1R-2, HIM-8 MET 2-10 FY2 30 GEOs in all

ISCCP Calibration:Process AVHRR/GAC Monitor VIS Monitor IR Absolute calibration tied back to NOAA-9 IR - 10th and 90th percentiles VIS - 28 Earth targets (various surface types) LEO/GEO normalization Collocation comparisons - IR & VIS Comparison of retrieved properties: IR: Sfc. Temp & Cloud Temp. VIS: Sfc. Reflectance & Cloud Opt. Depth Adjust calibration if necessary

ISCCP Future

ISCCP Future GOES 16, Himawari-8, others? JPSS/VIIRS Indian Ocean GEO replacement? How and what to incorporate from GSICS

ISCCP Discussion ISCCP and GSICS Calibration(s)? ISCCP and the GEO Ring? Can calibration be divorced from algorithms? ISCCP’s final check is on retrieval Know your users/uses Start with the end in mind.