Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.

Slides:



Advertisements
Similar presentations
National typologies - reports Presented by Sandra Poikane Joint Research Centre Institute for Environment and Sustainability.
Advertisements

Intercalibration Guidance: update Sandra Poikane Joint Research Centre Institute for Environment and Sustainability.
WG 2A ECOSTAT Meeting 4-5 March 2004 Meeting of the WFD CIS Working Group 2A ECOSTAT summary Presented by Anna-Stiina Heiskanen Joint Research Centre The.
ECOSTAT 8-9 October 2007 River GIGs: Future intercalibration needs/plans Presented by Wouter van de Bund Joint Research Centre Institute for Environment.
Jorge RODRIGUEZ ROMERO 1 EU Water Framework Directive Improving the communication of the intercalibration exercise WG A ECOSTAT meeting Ispra, March.
ECOSTAT 1-2 October 2008 Intercalibration – status of ongoing work – Coastal/Transitional Presented by Wouter van de Bund Joint Research Centre Institute.
Framework for the intercalibration process  Must be simple  Aiming to identify and resolve big inconsistencies with the normative definitions and big.
WG2A meeting 7-8 October 2004 Working Group 2A ECOSTAT Agenda item 9b Discussion on final Intercalibation register.
Updating the intercalibration process guidance Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Working Group 2A ECOSTAT Finalisation of the intercalibration register Presented by Wouter van de Bund Joint Research Centre Institute for Environment.
Overview and first analysis of the IC register
NE ATLANTIC GEOGRAPHICAL INTERCALIBRATION GROUP (NEA GIG)
Task on Harmonisation of Freshwater Biological Methods
Intercalibration excersice progress report Presented by Palle Haastrup Joint Research Centre Institute for Environment and Sustainability Inland.
Intercalibration Results 2006
Common Implementation Strategy for the Water Framework Directive Working Group A ECOSTAT Ecological Status 7th Meeting Stresa, Lago Maggiore, Italy
IC network selection process
Results of the metadata analysis Meeting of the Working Group 2A on Ecological Status (ECOSTAT) March 4-5 , 2004, Ispra, Italy Peeter Nõges Anna-Stiina.
WG 2A Ecological Status Drafting group: Guidance on the process of the intercalibration excercise 2nd meeting WG2A, 15-17/10/03.
Synthesis of the intercalibration process Working group 2.5.
Working Group 2A ECOSTAT Objectives & Agenda of the meeting March 2005
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
Development of guidelines
Intercalibration Report on State - of - play and way forward Presented by Anna-Stiina Heiskanen Joint Research Centre The Institute for Environment.
WG 2A Ecological Status First results of the metadata collection for the draft intercalibration register 2nd meeting WG2A, 15-17/10/03.
River GIGs: Future intercalibration needs/plans Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Draft Commission Decision on Intercalibration
Task 1 - Intercalibration WG 2A ECOSTAT - Intercalibration
River GIGs: Checking and completing the Decision Annex Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Working Group 2A ECOSTAT Summary progress report River GIGs Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
Report on WISE Art.8 and GIS issues
Working Group 2A ECOSTAT Intercalibration process - state of play Wouter van de Bund & Anna-Stiina Heiskanen Joint Research Centre Institute for Environment.
Working Group A Ecological Status - ECOSTAT WFD CIS Strategic Coordination Group meeting, October 2005 Progress in the intercalibration exercise.
Water Directors’ Meeting Common Implementation Strategy
Progress report ATG Hymo 1 May – 20 October 2016
Working Group A ECOSTAT Summary Milestone Reports: River GIGs Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Discussion agenda Summary & proposals (30 min)
Common Implementation Strategy for the
Update on progress since last WG meeting (13-14 June 2002)
Meeting of the WFD CIS Working Group 2A ECOSTAT Introduction & objectives Presented by Anna-Stiina Heiskanen Joint Research Centre The Institute.
Working Group A ECOSTAT Update on intercalibration Prepared by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Working Group A Ecological Status - ECOSTAT State of play in the intercalibration exercise Water Directors Meeting, November 2005.
on a protocol for Intercalibration of Surface Water
Meeting of Water Directors Eutrophication Guidance
Natura 2000: points of information
Progress Report Working Group A Ecological Status Intercalibration (1) & Harmonisation (3) Activities Presented by Anna-Stiina Heiskanen EC Joint Research.
WFD – CIS Working group A ECOSTAT
Activities of WG A Ecological Status
Water Directors’ Meeting Working Group D (Reporting) activities
WG A Ecological Status Progress report April-October 2009
EU Water Framework Directive
Working Group A ECOSTAT progress report on Intercalibration Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Water Directors meeting Warsaw, 8-9 December 2011
IC remaining gaps: overview and way forward
Water Directors meeting Spa, 2-3 December 2010
Working Group 2A ECOSTAT Guidance for the intercalibration process Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Metadata analysis.
WFD CIS 4th Intercalibration Workshop
Status of the Nutrient Best Practice Guide
Lake Intercalibration – IC Decision Annexes + what to do in future
Working Group A Ecological Status - ECOSTAT WFD CIS Strategic Coordination Group meeting, 22 Febraury 2006 Progress Report.
Common Implementation Strategy for the
WG A Ecological Status Progress report April-October 2010
Reporting template for milestone reports
Common Implementation Strategy for the
EU Water Framework Directive
WFD CIS WG ECOSTAT meeting on 8-9 October 2007 Objectives What do we need to achieve during this meeting?
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
WG A Ecological Status Progress report October 2010 – May 2011
Presentation transcript:

Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland and Marine Waters Unit

Issues Status and finalisation of the intercalibration register Intercalibration process GIG organisation Guidance development and process planning Eutrophication (see agenda item 10.2)

Intercalibration register

Previous SCG meeting: recommendations for finalisation of draft register More sites needed from some countries that have not submitted at all or not for all categories for the draft register for some lake types and all Mediterranean and Baltic Sea types. Allow submission of sites with wider quality range (Moderate-High) However, still need to have sites identified to be provisionally at the boundaries

Timetable for finalisation of the register April 28, 2004: Revised web-based metadata entry opened (4-week delay) http://wfd-reporting.jrc.cec.eu.int 25 May 2004: deadline for adding/ revising intercalibration site entries to the register

“List of sites proposed for the final intercalibration register“ Overview of sites submitted by the agreed deadline (25 May): Submission through web interface Supplemented by tables where technical problems prevented MS from using the web interface Tables need to be checked – may contain errors

Numbers of sites submitted for final register

Rivers (status 26 May 2004) no sites from: CZ, IE, LU, MT 879 sites 24 countries no sites from: CZ, IE, LU, MT

Rivers: numbers of sites by country (submitted though web interface in green)

Rivers: numbers of sites by GIG

Lakes (status 26 May 2004) 389 sites 21 countries no sites from BG, CZ, EE, GR, LU, MT, SK

Lakes: numbers of sites by country (submitted though web interface in green)

Lakes: numbers of sites by GIG

Coastal/ Transitional (status 26 May 2004) 204 sites 18 countries no sites from BE, FR, LT, MT, PL

Coast/Trans: numbers of sites by country (submitted though web interface in green)

Coastal: numbers of sites by GIG

Intercalibration register – main issues (1) Most countries have submitted sites; still missing: Rivers: CZ, IE, LU, MT Lakes: BG, CZ, EE, GR, LU, MT, SK Coastal/Transitional: BE, FR, LT, MT, PL

Intercalibration register – main issues (2) Electronic submission of all sites Completion of metadata questionnaire before the agreed 15 September deadline

Timetable (1) June - Aug. 2004: Member States submit remaining sites through web interface (JRC-EEWAI) Member States’ revision and finalisation of the draft register on the basis of the comments of SCG and WFD Committee – deadline 15 September

Finalisation continued.. Timetable (2) 30 September: Submission of final register for SCG and WFD Committee (meeting on Oct. 27/28) November-December 2004: translations January 2005: Meeting of WFD Committee, voting of decision on intercalibration register (all languages)

Intercalibration process: organisation and planning of the process

Proposed organisation for the preparation of the intercalibration process ECOSTAT Working Group Intercalibration Steering Group JRC Lake Expert Group rep. River Expert Group rep. Coast Expert Group rep. Lake experts/GIGs River experts/GIGs Coast experts/GIGs C BA N AT N C AT NEA BS AL EC AL EC M M

Proposed process options for intercalibration WFD compliant Shared assessment method used by all countries within GIG WFD compliant Common metric(s) specifically identified for intercalibration Direct comparison of WFD compliant national methods at IC sites

Next WG 2A meeting Next WG2A meeting first week of July, JRC Ispra; GIG coordinators present Preferred Option proposals for GIGs Presentation of first pilot results New draft guidance on Intercalibration process: Organisation of the work (WGL & DG ENV make proposal) Proposals on practical implementation of intercalibration options