The 5S numbers game..

Slides:



Advertisements
Similar presentations
EcoTherm Plus WGB-K 20 E 4,5 – 20 kW.
Advertisements

Números.
1 A B C
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
PDAs Accept Context-Free Languages
AP STUDY SESSION 2.
Reflection nurulquran.com.
1
EuroCondens SGB E.
Worksheets.
Slide 1Fig 26-CO, p.795. Slide 2Fig 26-1, p.796 Slide 3Fig 26-2, p.797.
Slide 1Fig 25-CO, p.762. Slide 2Fig 25-1, p.765 Slide 3Fig 25-2, p.765.
& dding ubtracting ractions.
Sequential Logic Design
Addition and Subtraction Equations
David Burdett May 11, 2004 Package Binding for WS CDL.
Create an Application Title 1Y - Youth Chapter 5.
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
CHAPTER 18 The Ankle and Lower Leg
突破信息检索壁垒 -SciFinder Scholar 介绍
A Fractional Order (Proportional and Derivative) Motion Controller Design for A Class of Second-order Systems Center for Self-Organizing Intelligent.
Numerical Analysis 1 EE, NCKU Tien-Hao Chang (Darby Chang)
Break Time Remaining 10:00.
The basics for simulations
PP Test Review Sections 6-1 to 6-6
MM4A6c: Apply the law of sines and the law of cosines.
2013 Fox Park Adopt-A-Hydrant Fund Raising & Beautification Campaign Now is your chance to take part in an effort to beautify our neighborhood by painting.
Regression with Panel Data
Dynamic Access Control the file server, reimagined Presented by Mark on twitter 1 contents copyright 2013 Mark Minasi.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Progressive Aerobic Cardiovascular Endurance Run
Biology 2 Plant Kingdom Identification Test Review.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
Facebook Pages 101: Your Organization’s Foothold on the Social Web A Volunteer Leader Webinar Sponsored by CACO December 1, 2010 Andrew Gossen, Senior.
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
When you see… Find the zeros You think….
2011 WINNISQUAM COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=1021.
Before Between After.
2011 FRANKLIN COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=332.
2.10% more children born Die 0.2 years sooner Spend 95.53% less money on health care No class divide 60.84% less electricity 84.40% less oil.
Subtraction: Adding UP
Numeracy Resources for KS2
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Static Equilibrium; Elasticity and Fracture
Converting a Fraction to %
Resistência dos Materiais, 5ª ed.
Clock will move after 1 minute
& dding ubtracting ractions.
Lial/Hungerford/Holcomb/Mullins: Mathematics with Applications 11e Finite Mathematics with Applications 11e Copyright ©2015 Pearson Education, Inc. All.
Select a time to count down from the clock above
WARNING This CD is protected by Copyright Laws. FOR HOME USE ONLY. Unauthorised copying, adaptation, rental, lending, distribution, extraction, charging.
A Data Warehouse Mining Tool Stephen Turner Chris Frala
1 Dr. Scott Schaefer Least Squares Curves, Rational Representations, Splines and Continuity.
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Introduction Embedded Universal Tools and Online Features 2.
úkol = A 77 B 72 C 67 D = A 77 B 72 C 67 D 79.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
The 5S numbers game. 1 1.
The 5S numbers game..
The 5S numbers game..
The 5S numbers game..
Presentation transcript:

The 5S numbers game.

This sheet represents our current work place. Our job during a 20 second shift, is to strike out the numbers 1 to 49 in correct sequence. Example: 1 2 3 The team score will be represented by the lowest individual score achieved. Give the sheets out face down and have someone keep time. Ask each person to call out their individual scores and mark them on a flipchart. Circle the lowest and therefore team score. Ask if they are happy with the score

48 87 45 30 33 72 3 27 69 51 21 24 75 57 18 9 6 78 54 36 60 63 12 15 81 42 39 66 84 90 2 53 68 74 77 86 80 62 29 65 5 41 20 23 56 32 35 44 89 8 83 50 47 26 11 17 38 14 59 71 31 64 49 61 34 28 54 7 40 16 52 58 76 10 22 88 73 1 85 82 4 43 25 37 13 19 67 79 46 70

For our first action, we are going to implement 5S in this area. The first step of this is “Sort” and so we have removed from the area all the numbers from 50 to 90 which are not needed. Same rule apply. Strike out numbers 1 to 49 in sequence during a 20 second shift.

48 45 30 33 3 27 21 24 18 9 6 36 12 15 42 39 2 29 5 41 20 23 32 35 44 8 47 26 11 17 38 14 31 49 34 28 7 40 16 10 22 1 4 43 25 37 13 19 46

Having achieved some improvement, we now need to move onto the next step ”Set In Order”. We have installed some racking, and we have organized the items so that with Number 1 in the bottom left hand corner, the numbers are located from left to right and bottom to top - examples 1 in the bottom left, 2 in the middle, and 3 in the top left. Same rules apply 20 second shift, lowest individual score equals team score etc…

48 45 30 33 3 27 21 24 18 9 6 36 12 15 42 39 2 29 5 41 20 23 32 35 44 8 47 26 11 17 38 14 31 49 34 28 7 40 16 10 22 1 4 43 25 37 13 19 46

Having now made a significant step forward, and having ignored “Shine” for this exercise, we must “Standardize”. Since we are dealing with numbers 1 to 49 in sequence, it seems logical to re-organize them in a standard way that makes the completion of the work task as easy as possible. This should ensure that everyone is able to complete the task (and therefore produce a team score of 49.)

Numbers from 1 to 49 2 4 7 10 3 5 6 8 1 9 16 20 11 15 17 18 19 12 13 14 21 22 24 25 26 27 28 23 30 29 32 31 33 36 37 34 39 35 38 40 41 43 44 47 45 49 42 48 46

To show respect for Standards it is necessary to make the “management” of the area visual. Returning to our original work area, we have for this assignment two numbers missing. We cannot complete the task without these numbers - so first we have to find them. Start a clock running and every 20 seconds, tell them how many “shifts” they have been down looking for the appropriate numbers.

48 87 45 30 33 72 3 27 69 51 21 24 75 57 9 6 78 54 36 60 63 12 15 81 39 66 84 90 2 53 68 80 74 77 86 62 29 65 5 41 20 23 56 32 35 44 89 8 83 50 47 26 11 17 38 14 59 71 31 64 49 61 34 28 54 7 40 16 52 58 76 10 22 88 73 1 85 82 4 43 25 37 13 19 67 79 46 70

Now how much easier is it to find the quality problems?

Numbers from 1 to 49 2 4 7 10 6 8 1 3 5 9 16 20 11 15 17 19 12 13 14 21 22 24 25 26 27 28 23 30 29 32 31 33 36 37 34 39 35 38 40 41 47 43 44 45 48 49 46