Scintillator Detector

Slides:



Advertisements
Similar presentations
n-DVCS/E status report
Advertisements

Expedition Talia Matthew MARS MARS.
Breakdowns and Trail Repairs A guide for preparedness.
All elements of this presentation are Fair Use and meet copyright laws for educational purposes. This presentation may not be copied, sold, or used for.
Manual Screwdrivers –used for driving screws into a material and/or taking out screws HAND TOOLS Hammer –used for driving nails into a material and/or.
Collaboration Meeting, Oct : Start Counter Start Counter Eric Pooser W. U. Boeglin L. Guo P. Khetarpal Experimental Setup SiPM Scan Attenuation Lengths.
w w w. z a n e e n. c o m z a n e e z a n e e n. c o m Decorative D8 Volume Feature Product: ALUMINIO features ALUMINIO.
Choose my guitar template for “Big Blue”. Cut out two pieces of woods from a long wood. (Then, little bit longer than my guitar body template scale.)
CRAnE: A JAS-based Data Acquisition System for Cosmic Rays Jennifer Docktor & Manuel Reyes Mentors Tom Glanzman & Willy Langeveld August 13, 2003 Department.
G.Barber Tracker Update, Berkeley 10 Feb Tracker Progress Contents:- Station Space Frame Patch Panel / Vacuum Seal Light Guide Map Position of Degrader/Support.
LCD Muon/PID Meeting Friday Oct 29, SUBSCRIBE FIRSTNAME LASTNAME There are "underscores" between: Fermilab, LC.
Progress Report Pedro Flores. Scintillator Case Set to hold four scintillator panels with instrumentation. Only three panels with instrumentation that.
How We Became Experimentalists Suzanne Levine Saba Zuberi Len Zheleznyak REU 2002.
Progress Report Pedro Flores. Scintillator Case Set to hold four scintillator panels with instrumentation. Only three panels with instrumentation that.
Abstract We constructed and tested seven scintillation counters using photomultiplier tubes, in order to create a fast electronic coincidence “trigger”
Jimmy McCarthy International Cosmic Ray Day 26 th September 2012 Detecting Cosmic Rays.
PIRALU Pre-Insulated aluminium panels Poliuretanos, s.a. -End cap CHAPTER 005-i.
Trend ground array 1 1.General considerations 2.Study on the prototype detector 3.Inclined ground array simulation 4.Making work plan in 2014.
CEDAR Support Structure and PMT Test Peter Sutcliffe 13 th July 2011 CERN via EVO.
1 ATLAS TileCal Production at UIUC Maggie Geppert, UIUC Dr. Steven Errede, project head July 9th, 2001.
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
Cosmic Rays: Ever Present and Useful Anthony Gillespie Denbigh High School Mentor: Dr. Douglas Higinbotham Cosmic Rays Using the Cosmic Rays Current Research.
PHOBOS TOF Construction Status
Site: R&B Wagner, Milwaukee, WI By: Ben Perreault.
THE UNDERDOG By Lexi Walsh and Maddi Savedra. The objective of the Can Challenge was to build a insulator box (10 cm x 10 cm x 20 cm) that can keep a.
PIRALU Pre-Insulated aluminium panels Poliuretanos, s.a. -Straight Duct CHAPTER 002-I.
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
CEDAR Support Structure Peter Sutcliffe 24 th January 2011.
PIRALU Pre-Insulated aluminium panels Poliuretanos, s.a. -Reduction or transition CHAPTER 004-i.
APS April Meeting Detector Construction of the Forward Proton Detector at D0 Michael Strang University of Texas at Arlington Diffractive Events FPD.
Joe the Windmill. Introduction Members – Adam Lindsey – Stephen Liebschwager – Stephen Bridges.
Activities Status and Plan for the week D. Giugni Monday Meeting
Turn in homework: “How the cell works” Paste this paper into your notebook on the left side. Setup the right side as follows:Number Name of structure Function.
1/10/2016Collaboration Meeting Feb 2011 Start Counter 1 Start Counter Update W. U. Boeglin L. Guo E. Pooser Measurements on EJ-212 scintillator bars Attenuation.
Installation of Shades and Scintillation Cube C.Woody, M.Durham, J.Kamin B.Azmoun, A.Caccavano HBD Meeting April 29, 2007.
WARM UP 10/20/15 1.Your Warm Up should be glued into your notebook immediately! 2.DO NOT TOUCH any of the materials at your table. If you do, you may lose.
The Babar Cherenkov Detector Detection of Internally Reflected Cherenkov Yuen-Jung Chang.
Coordinate Detector: prototype design General idea about the Coordinate Detector (CDET) so far: Three independent vertical planes with 15 cm plastic shield.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
… HiSPARC and LUCID. Students design and build detectors Students design and build detectors Simple design: Scintillator + PMT + HiSPARC electronics (SSF)
IMAGE ACQUISITION FILM SCREEN SYSTEM. PROCESSING THE LATENT IMAGE AUTOMATIC AUTOMATIC DARKROOM PROCESSOR DARKROOM PROCESSOR DAYLIGHT PROCESSOR DAYLIGHT.
Gamma Detector of Plastic Scintillator Oct. 2, 2009 IP-BSM Group 1.
Waxy areas will have a crackle texture GOOD FOR DOTS AND LINES.
Sanding is used to remove small amounts of material from surfaces, and to make them smoother.surfaces.
Western Saddles Presentation Part 3: Parts #8899-C.
Focal Plane Scanner Jie Pan * + for the scanner working group Laura Cobus*, Anna Micherdzinska* Jeff Martin*, Peiqing Wang + * University of Winnipeg /
Experience of a HiSparc participant Floor Terra. Who am I Former school: St. Michael college Former school: St. Michael college VWO - Natuur en techniek.
How to Fix Bitdefender Total Security Error -1022? Support Number
Electrical Symbols Carlin Bright.
Electrical Symbols Carlin Bright.
Status of Prototype Preparation and SiPM Characterization
* Experimental technique
Mechanical and Electrical Systems
Making Divine Mercy Chaplets
LNG Production - Point Fortin, Trinidad
Anything else? Final Exam Study Guide Quantity Control Microphones
M. Jones B. Wojtsekhowski
Gas Monitoring Chamber Production Status
BC Technology Education Association
CELLS RESPONSE OF DIFFERENT COATING/WRAPPING
Microscope Notes BRING IN 10 items from home
ACD transparency - gaps between tiles - holes in tile to attach them
Rocket Stability Building a Test Rocket LabRat Scientific © 2018.
Foil Relief Coin Design
Effect of magnetic field
BC Technology Education Association
Microscope Notes Turn in homework: “How the cell works”
SMART-CALLER BEDEXIT-PIR INSTRUCTIONAL PRESENTATION
BC Technology Education Association
Presentation transcript:

Scintillator Detector By: Jennifer Tighe

Past Problems Waiting for materials Gluing the Light Guides to the Scintillator Panels PMT Mount is too long PMT not secure

Building The Scintillator Detector Filing and Sanding Polishing Gluing Wrapping with Aluminum Sheet/Foil and electrical tape Testing and Fixing Light Leaks

Polishing Sanding Gluing

Wrapping The Detector Gluing

Accomplishments Building Four Working Scintillator Detectors Finished Scintillator Detector

Scintillator Detector By: Jennifer Tighe