Pressurisation Systems Colt Technical Seminar. I J OHea. Colt Founder I J OHea OBE ( ) 2009 Group Turnover £170 million Manufactures in the.
Initiating Devices Manual Fire Alarm Boxes Ionization Smoke Detectors
TESTING AND BALANCING IN HEALTHCARE FACILITIES. What is Test & Balance The art of establishing air and water flows to meet design criteria. Total System.
Lodging HVAC and Refrigeration
Heating, Ventilating, and Air-Conditioning
The Role of Controls for Indoor Air Quality Kent W. Peterson, PE, Fellow ASHRAE P2S Engineering, Inc. Mid Columbia ASHRAE Chapter.
Air & Smoke Movement in and around High Rise buildings (Air Tracks) Mark Fishlock 2011.
Basic Fire and Smoke Training Basic Fire and Smoke Actuators & Dampers.
PTCS Aeroseal Specification Approval Measure Proposal Presentation to the Regional Technical Forum June 28, 2011.
Smoke shafts vs pressurisation
P R E S E N T I N G The Formidable Air Barrier HIMCURT’Z AIR CURTAINS.
Ventilation solutions for overheating corridors in apartment buildings
C oncerns Ltd ool Energy Efficient Refrigeration Jane Gartshore, Cool Concerns Ltd.
Buildings and Structures 2 Natural and Mechanical Ventilation.
Design Envelope Pumps – Value Proposition 2012 Lowest Installed Cost Lowest Life Cost.
Energy efficient ventilation solutions Paul Compton.
“People feel better in Colt conditions” | “People feel better in Colt conditions” | Colt International Ltd Smoke curtains.
Colt International Ltd
“People feel better in Colt conditions” | “People feel better in Colt conditions” | Colt International Ltd Pressurisation.
A Guide to Fire Alarm Service and Maintenance Requirements.
“People feel better in Colt conditions” | “People feel better in Colt conditions” | Colt International Ltd Commissioning.
How to pass the test Stephen Shorrocks David Starr.
“People feel better in Colt conditions” | Colt International Ltd Car Park Ventilation Colt CPD Technical Seminar.
“People feel better in Colt conditions” | “People feel better in Colt conditions” | Colt International Ltd Smoke and.
2013 NATEF Task Area A-7 Heating, Ventilation, and A/C A. A/C System Diagnosis & Repair B. Refrigeration System Component D & R C. Heating, Ventilation.
Brought to you by: Connecticut Energy Code Frederick F. Wajcs Senior Energy Engineer Northeast Utilities February 10, 2011.
Product Ratings and Performance Certifications Presented by: Tom Gustafson, Hartzell Fan, Inc. AMCA International Technical Seminar 2009.
AIR QUANTITY REQUIRED TO TRANSFER HEAT IN A FORCED AIR SYSTEM In all four mechanical systems considered, the transfer of heat, either by taking it out.
1 HVACR416 – Design Principles Air Exchange. 2 HRV’s (Heat Recovery Ventilators)
Iouri Ivaniouchenkov RAL Safety considerations at RAL July 9, RAL MICE Collaboration Meeting 1.
Hawke’s Bay Refrigeration
World Health Organization
Improved Precision Leading to Improved Energy Efficiency Edward Decker AE 790 – Intelligent Buildings June 6, 2006.
World Health Organization
VENTILATION PRINCIPLE FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 28/7/2009 Already presented by C. Martel/ J Inigo Golfin on15 th October 2008 CLIC WORKSHOP.
Neil Cooper Fire Safety Residential Implementing the Changes.
No content in the brand signature area No content in this area CYAN RGB= 000,153,255 DARK GREY RGB= 075,087,095 DRAKA BLUE RGB= 000,051,153 DRAKA Colors.
“People feel better in Colt conditions” | feel better in Colt conditions” | Colt International Ltd Smoke control.
Kendal at Oberlin Energy Conservation & Sustainability Initiatives.
1 1 Weatherization & Indoor Air Quality Impacts of Weatherization on Air Quality and Comfort Inside Your Home Prepared with the assistance of Jed Harrison,
7/15/2002PP.AFD.09 1 of 43 Yaskawa Electric America Variable Frequency Drives In HVAC Applications.
Plant Maintenance Experts CPM Engineering offers diagnosis and repair of electrical and mechanical equipment. From pump, gearbox & motor repairs, machining.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – August 2010 eere.energy.gov Duct Sealing and Insulation TRAIN THE TRAINER WEATHERIZATION.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
Renson and Dampers. Natural Ventilation Dampers Dampers are used to control airflow from one space to the other. Often referred to as ventilators. Used.
“People feel better in Colt conditions” | “People feel better in Colt conditions” | Colt International Ltd Fundamentals.
NHS PAM Electrical Systems 2 nd June ) Policy & Procedures Does the Organisation have a current, approved Policy and an underpinning set of procedures.
Drive systems for livestock
Colt International Ltd
HVAC Replacement Case Study
. Level 3 Air Conditioning Inspections for Buildings
Colt International Ltd
Building Environmental Systems
Colt International Ltd
Internal Training Module
Fans & Heaters technical seminar
Fans & Heaters technical seminar
Toolbox talk on fire risk assessment by Marc Cork
Emergency Electrical Power Supply for Buildings
Reducing Risk with Competency and Compliance
Adding Zones to Existing Systems
VITALITY Large Splits Johnson Controls PowerPoint Guidelines | July 21, 2009.
February 2019.
Interactive Source: Fire Statistics Great Britain,
Accountability • Competence • Traceability
Presentation transcript:

Colt International Ltd Welcome This is a CPD Certified presentation by Colt International Ltd on Pressurisation Systems. Commissioning and maintenance of smoke control systems Colt CPD Technical Seminar “People feel better in Colt conditions” | www.coltinfo.co.uk

Private Company founded in 1931 I J O’Hea OBE (1897 - 1984) Current Group Turnover £156 million Manufacturing plants in the UK, Holland, Saudi Arabia, China and Singapore I J O’Hea - Founder Titles Arial Black 20pt

Current UK Business Markets Residential common corridors Fire Fighting Shaft Systems SHEVS – Shopping Centres, Atria, Warehouses, Factories, etc Smoke Curtains Fire Curtains Pressurisation Custodial Car Parks Standard Brise Soliel louvres Fixed and movable Fins Fixed and movable Glass Louvres Sliding and rotating systems Photovoltaic systems Factories Schools Healthcare Offices Power Stations Energy from Waste Smoke Control Solar Shading Natural Ventilation Louvre Environmental Comfort Control (HVAC) Maintenance & Service Single bank screening louvre Single bank performance louvre Double and Triple bank high performance louvre Mechanical Extract Mechanical air input Heating and cooling Evaporative cooling By investing in innovation, products, services and people, Colt International has established itself as an international leader in the fields of: Smoke Control Solar Shading Natural Ventilation Louvre Environmental Comfort Control (HVAC) Air Handling Systems Routine planned maintenance 24 hour emergency call out

Commissioning and maintenance of smoke control systems

Commissioning and maintenance of smoke control systems Legislation, Standards and Guidance BS 7346-8: Components for Smoke Control Systems – Code of Practice for planning, design, installation, commissioning and maintenance. Commissioning: The act of ensuring that all components and the smoke control system are installed and operating as planned. BS 9999: Code of practice for fire safety in the design, management and use of buildings Regulatory Reform (Fire Safety) Order (see Colt whitepaper)

Commissioning and maintenance of smoke control systems Process: Complete installation Check for conformity to approved drawings and design Electrical installation Checks Continuity/Impedance Insulation Resistance Network

Commissioning and maintenance of smoke control systems Shaft: Fire rated Non combustible Well sealed – 3.8m3/hr/m2 at 50 Pa Free from services and obstructions Fans: Temperature Rated F300 minimum (CE Marked EN12101-3) Provide required duty + leakage Overcomes system pressures /resistance Right way round Smoke Vents: CE Marked - EN 12101-2 Correct control method Known ventilation performance

Commissioning and maintenance of smoke control systems

Commissioning and maintenance of smoke control systems Process: Electrical Performance Tests (fans): Test incoming voltage to MCC Panel from Primary and secondary supplies Record resistance and current across phases Rotational check – speed and direction where required 5. Mechanical: Airflow Tests Pressure tests Balancing

Commissioning and maintenance of smoke control systems Air Systems Airflow Manometer + pitot tube Rotary Vane Anemometer Balometer/Hood Pressure Manometer

Ventilation using shafts Commissioning Airflow Tests Standing out of air stream place RVA across grille/opening Avoid locations where air flow across head is non-uniform Measure velocity at evenly spread positions Do not move the anemometer during readings Take arithmetic average of readings, multiply by area and correct if necessary A rotating vane anemometer is used to measure the air velocity across the doors and calculate the average.

Ventilation using shafts Commissioning 6. Cause and Effect Testing

Ventilation using shafts Commissioning 6. Cause and Effect Testing Primary / secondary fan switchover Primary / secondary supply switchover – Black Building 7. Smoke Test - where specifically required

Commissioning and maintenance of smoke control systems Handover Demonstration and Training Documentation Test Record sheets Commissioning Certificate Operation and Maintenance Manuals As Built Drawings Warranty Certificate

Commissioning and maintenance of smoke control systems Colt Doorman Actuator with fire door to shaft: Equivalent to E30S Fire rated construction Requires a safety grille across shaft at each level Units on other levels must lock closed to prevent smoke transfer Local reset Alternatively fire doors can be used but must be locked closed when not in use and have a safety grille across shaft.

Commissioning and maintenance of smoke control systems Mechanical Shafts Internal Damper to shaft, concealed by decorative grille: Equivalent to E30S Fire rated construction Motor open/closed Mounted as high as practicable?

Commissioning and maintenance of smoke control systems Should be Fire Alarm/Application Specific. Designed with resilience, backup and reliability Not BMS, BAS or HVAC/process control systems Open/Closed Protocol? Only operate on first activation (subsequent signals are locked out) Key enabled Firefighters override

Commissioning and maintenance of smoke control systems Cabling: Fire Rated – BS 8519 Tested for Heat Water Jet Impact Power cables - FP600 Control/230Vac - FP Plus or similar from AEI or Draka

Commissioning and maintenance of smoke control systems Testing and maintenance Smoke control is a life safety system, covered by the RRO. Testing and maintenance is covered by BS 9999 Annex V Regular testing – weekly Three monthly full test Annual inspection and maintenance by a competent person BS 9991 BS 9999 SCA Guide BS 7346-8 Documentation

Commissioning and maintenance of smoke control systems Post Handover Service “A tailored maintenance regime to ensure optimum product/system performance while ensuring legislative obligations are met” Programmed preventative maintenance Design implications for accessibility Non-routine maintenance/plant replacement Continued certified performance

Commissioning and maintenance of smoke control systems Post Handover Maintenance

Commissioning and maintenance of smoke control systems Post Handover Maintenance

Commissioning and maintenance of smoke control systems Designing for maintenance Removable access panels Access walkway Cable entry Lifting lugs and support frame for ease of replacement

Commissioning and maintenance of smoke control systems Design Commissioning Maintenance Equipment/Controls Installation The first presentation “Shafted” by Ron Diaper.

Q&A Session… Pressurisation Systems – Performnce testing Ventilation In Car Parks Q&A Session… “People feel better in Colt conditions” | www.coltgroup.com