Pebble Smartstrap Weekly Update #8

Slides:



Advertisements
Similar presentations
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Advertisements

Organics Compartment OUT OF SERVICE When Lit staff maintenance When power off during night = “Unlit” Select Organics Button Organic Button lights All.
Using Activity Descriptions to Generate User Interfaces for ERP Software 22 nd July 2009.
Team: Jesse Salazar Rajeev Sharma Mitch Luban Owen Jarrett.
Office of the Dean of Students Michael Alexander Sak Mahasuverachai Bryn Nealis Advisor: Prof. David EbertAdvisor: Prof. David Ebert TA: Jared FritzTA:
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
Webtrain Decoupling Adam Kadolph EE451 Bradley University Advisors: Dr. Irwin, Dr. Schertz Week 5 Monday 11/13.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
System for Engine Location Of a Web Train Paul Wimmer and Adam Weintrop Dr. Irwin and Dr. Schertz 11/21/05.
Click & Fix 12/1/10 James Cui Janam Jhaveri Paul Mongold.
Office of the Dean of Students Brian Eng Matteo Mannino Jonathan Timura Advisors: Prof. David EbertAdvisors: Prof. David Ebert Kirk Riley Kirk Riley TA:
Gantt and PERT charts. Representing and Scheduling Project Plans Gantt Charts Useful for depicting simple projects or parts of large projects Show start.
Today Validation 9/24/2014 Minimal Prototype 12/20/2014 Integrated Prototype 4/1/2015 Integration 5/21/2015 Kick-Off 6/18/2014.
University of Delaware Information Technology User Services.
1. Presenters: Constantine Grantcharov Ryan Burbidge 2.
 Weekly Report Sean Donoghue Daniel Meighan Lamar McFall Tramayne Thomas.
Anees Elhammali Michael Malluck John Parsons Namrata Sopory
RFID Pet Door Andrew Parr Conner Rocole Ben Peetz Eric Sturm EE 494, Fall 2006.
Problem 2 week 18. Question A basketball coach wants to hang 3 plaques on a wall. She wants to hang the three plaques side by side so that they are centered.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Activity 5 Drawing a Gantt chart for the development of a school attendance system Suppose when developing a school attendance system, the following activities.
Project Portfolio Management MaestroTec, Inc. Project Portfolio Management Providing the tools and resources necessary to effectively.
Problem Statement Expanding the capabilities of an auto repair paint drying system that uses newly developed ultraviolet (UV) light activated paint. This.
Team Churro: Sharon Grimshaw, Maggie Su, Louis Yi, Morgan Zheng.
Multi-Robot System Application
 Weekly Report Sean Donoghue Lamar McFall Daniel Meighan Tramayne Thomas.
 Weekly Report Sean Donoghue Daniel Meighan Lamar McFall Tramayne Thomas.
WEEK 1 You have 10 seconds to name…
Adding SubtractingMultiplyingDividingMiscellaneous.
Com.Tech 3104 Outcome 12 By: Evan And Mark Progress Report.
Group # 4 Mohammed Ali Al-Hulail Abdulaziz Adnan Al-Aqeel Fahad Salem Al-Qailani Team Progress Report #7.
AprJulOct2014AprJulOct2015Apr Kick-Off 5/1/13 Minimal Prototype 9/30/13 Submission 11/25/13 Release Web Prototype 3/1/14 Online Testing 5/20/14.
Slide 1 Critical Success Factor : Project Management Project Management is the process of _______ the development of a system with a specified _____ frame.
Revisimo Remote Vital Sign Monitor TM. About us Dr. Thomas Morris Advisor Cory Zywno EE Design Refining Matthew Galloway EE Design Refining Matthew Gallups.
Statistical Analyzer for Golf Senior Design May08-07 Team Itiel DiazCpr E Tim HasselCpr E Ryan BillerCpr E Brett ScottCpr E Client John Whitmer Faculty.
Source insight with Z-Stack 김백규. Review Z-Stack Structure.
FINANCIAL BID OPENING. BID OPENER 1 LOGS IN Bid opener 1 Logs in 1. Enter the Login id and Password 2. Click login.
Evolving the Project Plans Adding more detail Page 167 A2 ICT.
Firm SCALE Mid-term Report. What happened in the past 2 weeks Improved landing page design & code Better front-end visualization with chart feature More.
Patient Monitoring System Mobile Ad Hoc Network
Project Management Chapter 3.
Status Report 7 CAPS Cynthia Reyna David Rodriguez Cynthia Salas
Design and Development of an Autonomous Surface Watercraft
FUNDAMENTAL ALGEBRA Week 7.
Risk Reduction Strategies Funct. & NF Requirements Summaries
Minimal Prototype Integrated Prototype Integration Validation
Engineering Project.
GANTT CHART Text Text Example
ECE4006 Group 6 – Presentation 9
Pebble Smartstrap Weekly Update #4
' d' :- '" L I _ I r 1.
Development Commitment Package
Logic Gates Practical Objective: to develop an understanding of logic circuits and truth tables.
Minimal Prototype Integration Integrated Prototype Validation

FINANCIAL BID OPENING.
Physics-based simulation for visual computing applications

Case Study on requirements, design, and evaluation: NATS
a week-by-week Bible study for 2017 week 9: Romans 3:1-8
Pebble Smartstrap Weekly Update #3
5000 – Environmental Quality Graph Tool
Adding with 9’s.
Adding with 10’s.
Adding ____ + 10.
Week 1 – Low-Fidelity Prototypes
Mark Week 23 Mark 3 Prep.
FINANCIAL BID OPENING.
Mark Week 31 Mark 4 Prep.
Capstone Design Update Week 9 ECE 4006 – Group 1
Presentation transcript:

Pebble Smartstrap Weekly Update #8 Mathew Hart Josh Lanxner Ryan Meyer Aaron Morgan

What We’ve Accomplished Refinement and Testing Cleaned up code Added in an LED for visual confirmation of code Distance test Ordered pogo pins Began looking over User Manual examples

Added LED The newly added LED will chage states based on the current lock status ON status is simulated with a lit LED OFF with a unlit LED

Distance Test We used the 2nd floor hallway as our environment, no walls or other obstructions. The test showed us that we have a range of about 60 feet without an antenna

Tasks for this week Work on prototype Clean up issues with GUI Distance test with antenna

Updated Gantt Chart

Questions? Comments? Concerns?