Site Analysis ID 240 Spring 2017 01.23.17.

Slides:



Advertisements
Similar presentations
WHAT DOES THE CITY of New Orleans ZONING ORDINANCE DO?
Advertisements

Designing the Landscape Rainier High School Landscape Design Class.
THE “INs AND OUTs” OF ALLEYS FOR THE CITY OF HOUSTON.
First step in the City Parking Study Changes.
Architectural Drawing Sire Plan Drawings. Preliminary Planning How do I select a house and site that will fit my needs and format in AutoCAD?
Welcome to the Plumb Lane 2 nd Community Workshop November 28, 2011.
Civil Engineering & Architecture 2.3 Residential Design.
Commercial Building Project Portfolio
Height Recommendations September 25, 2008 Zoning Commission Case No The District of Columbia Office of Planning’s Comprehensive Review of Zoning.
CEA F INAL E XAM R EVIEW These are the topics that will be on the final.
City of Waynesboro Entrance Corridor Design Guidelines.
Blue Prints.
Chapter 14 Legal Descriptions and Site Plan Requirements.
Land Use Study for the Community of Winchester May 21, 2012.
Building Green Lesson 1 – Green Architecture © 2012 Project Lead The Way, Inc.Green Architecture.
© OnCourse Learning Chapter 25 : Land-Use Control.
1 HVACR116 – Trade Skills Plan Views Elevations Plan Views Elevations.
© 2006 ITT Educational Services Inc. CD230 Architectural Design & Drafting: Unit 10 Slide 1 Unit 10 Commercial Construction.
Shireen Abdelrahman Lecture 5. Individual development projects - new construction, expansion, or renovation - can affect the surrounding environment in.
Planning & Community Development Department Hillsides Residential Care and Educational Center Master Plan City Council July 20, 2015.
Mr. Brad Dearing 108 University High School Normal, IL (309) Architectural Design.
Construction Drawing Occupational Safety and Fundamentals
Preliminary Development Plan – Continuation of August 28, 2012 BoCC Hearing Board of County Commissioners September 18, 2012.
Site Plan Requirements © 2010 Project Lead The Way, Inc.Civil Engineering and Architecture.
Chapter 44 Building Codes and Commercial Design. 2 Links for Chapter 44 Building Codes Design Categories Using the Codes Related Web Sites.
Chapter 15 Site Plan Layout. Driveway style and Slope Design Considerations  Minimum lawn slope of 5% for first 10’ (5/8” per foot)  Minimum concrete.
HVACR116 – Trade Skills Plan Views Elevations. Plan Views.
Affordable housing project
7 Planning the Living Area Chapter. Permission granted to reproduce for educational use only.© Goodheart-Willcox Co., Inc. Objectives Identify the three.
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
Design Standards in Saint Paul Proposed Design Standards Zoning Amendments December 16, 2009 Department of Safety & Inspections / Department of Planning.
Design Standards in Saint Paul Proposed Design Standards Zoning Amendments October 16, 2009 Department of Safety & Inspections / Department of Planning.
Primary Considerations Site Considerations The community “Planned community” or no thought? Price range? Socio-economic category? Alive or dying community?
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
Public Hearing Seattle Ridge Preliminary Plat/ Planned Area Development PP December 18, 2013.
1 Zoning Application Tealwood. Tealwood : Aerial Subject.
The City of Santa Cruz ADU Program. Public Education ADUs as Part of Solution Supportive Zoning Homeowner Tools Manuals Prototypes Financial Assistance.
206 THIRD STREET DR/TRP Appeal of. Planning Commission Hearing March 12, 2014, P/C approved a Design Review Permit: - Demolition of the existing.
CISD Elementary School No. 5 Elevations Discuss the site plan elevation changes to the new CISD Elementary School located at 2520 and 2530 N. White Chapel.
Noyes Street 4-story mixed-use building 44 soft-loft style rental dwelling units 25% Studio, 27.5% One-BR, 27.5% Two BR, and 20% Three BR Units.
Fundamentals of Construction
City of East Palo Alto Planning Commission
Foundations of Technology Construction
Major Steps In Building a SFR
Will’s Trace Subdivision
Unit 6.05 and 6.06-Learning about blueprints
Heating Ventilation and Air Conditioning
AR-315 BUILDING CODES & BYE LAWS
Site Orientation & Linear Measurements
Construction Documents
RESIDENTIAL PLUMBING SYSTEMS (WASTEWATER)
Architectural Drafting
Public and Private Area Landscaping
Site study and Analysis
Fundamentals of Construction GTT – Unit 7 – Green Architecture
Commercial Building Project Portfolio
Commercial Construction Projects
Residential Site Plan Considerations
Site Plan Requirements
Fundamentals of Construction Gateway – Unit 7 – Green Architecture
Foundations of Technology Construction
Competency: Create site plan drawings
Site study and Analysis
Site study and Analysis
Site study and Analysis
Site study and Analysis Arch 203 Architectural Design III
City Commission Workshop
Creating Streetscapes With Conventional Zoning
Building Codes A building code, or building control, is a set of rules that specify the minimum acceptable level of safety for constructed objects such.
12 D. Variance Request – 211 Jennifer Lane
Presentation transcript:

Site Analysis ID 240 Spring 2017 01.23.17

Definition Investigation and evaluation of conditions within which the project will be completed. A form of due diligence in that the designer can only competently design the interior space after knowing the context of the project. Can be part of programming phase or a separate activity. A necessary part of the design process

Tasks within a site analysis Review architecture plans (if available) Walk through the space/ site Measure the space/ site Photograph the space/ site Determine views from and to the space/ site Understand neighborhood and social context Document drawings locating structures, utilities, built-ins, construction elements. Inventory of existing furniture Analyze codes and regulations Determine sustainability goals/ requirements

Tasks within a site analysis For a commercial project, verify: heating Ventilation Air conditioning Electrical systems For a residential project, determine constraints such as: Zonings setback limitations Heating and plumbing capacities Septic tank capacities

Sustainability considerations Environmental impact of buildings on a site Wise use of exterior and interior materials Energy conversation Use of alternative energy sources Adaptive reuse Indoor air quality Recycling Reuse Full life cycle of a building and its comprising materials: impact of raw extractions throughout fabrication, installation, operations, maintenance, and disposal.

Sustainability considerations (LEED) Storm water management plan (implemented or proposed) Located in an established walkable community within ½ mi of residential zone with pedestrian access to at least 10 basic services within ½ mi of a commuter rail or ¼ mi of 2 or more bus lines

Drawing Site Plans

Start with some schematic diagrams

What to include in a site plan? Roof plan of the building and surrounding property Site boundaries and adjacent street information Topographic information (changes in ground levels) North arrow to establish sense of direction Local ordinances Setbacks: side setback are usually 6 feet, rear setbacks are percentage of lot depth or green space Water drainage away from the building Orientation: Sunlight and protection from the elements depend highly on orientation

What to include in a site plan? Located utilities Planning for vehicle movement; consider local ordinances Existing trees and plantations; how would these impact building views? Recommended scales: (use of bar scale is most convenient) Architectural scale: 1/16 “ = 1 ‘ 0” Engineering scale: 1”= 20 ‘ OR 1” = 30’

A hand-drawn site (and roof) plan for the sample project A hand-drawn site (and roof) plan for the sample project. The lot size for this project is 60 by 120 feet=72,000 square feet (18,288 by 36,576 mm = 668.9 m 2). The percentage of green space (uncovered ground that will absorb rainfall) is 55 percent, with the proposed building on the lot (local ordinance is 50 percent minimum). A. Street right-of-way width (R.O.W.) is up to local jurisdiction; very frequently it is 66 feet (20,117 mm); therefore, the centerline of the street is 33 feet (10,058 mm) from the property line. B. Street width (curb to curb) is a local jurisdictional matter dependent on whether or not it is a through street and whether or not there is parking on one side or two sides, or no parking. C. Public sidewalk, generally located within the public right-of-way. The width is up to local jurisdiction, but is frequently 4 to 6 feet (1219 to 1829 mm). D. "Boulevard“ strip, generally landscaped with grass or other ground cover and maintained by the property owner, even though it is within the public right-of-way (R.O.W.) . Municipality often maintains trees. E. A 6-foot (1829-mm) utility easement (in this case for communication utilities). F. Front setback. It is frequently permissible to set the residence farther back (more than the minimum) on the lots-but never closer to the street without a variance. This type of variance is generally difficult to obtain (neighbors tend to fight these). G. Side yard setbacks. Minimum setback is very often 6 feet (1819 mm).Different jurisdictions will have different rules regarding exactly what is measured to determine setback (e.g., from the building face or the edge of any overhanging roof). H. Two paved tracks with ground cover in between to fractionally reduce storm runoff. I. Existing wood frame garage with concrete block foundations and a brick paver floor; to be removed just prior to construction of a new garage building. It is important to remove all existing below-grade construction (including footings and foundation walls) and to compact granular backfill. J. "Future“ garage/office/potting shed in this case is intended to be within three years. The buildings will require water, sewer, electrical service, and communication lines; these should be stubbed in during Phase 1. K. Setback from the alley is often zero; there is a risk of buildings placed at that setback to be struck and damaged by vehicle traffic. Strategically placed bollards can ameliorate that risk. L. Alley-in this case, a public right-of-way measuring 20 feet (6096 mm), of which roughly 18 feet (5486 mm) is paved. In this case, the storm drainage is down the center of the alley; this is the opposite of most streets, which are crowned, with the storm water moving to the gutter at the curb on both sides of the street. M. The alley serves as an easement for overhead power lines (denoted P.P., for power pole, on the diagram). N. A knock-out panel will be framed for a future second garage door opening (for possible future owner).

A sample residential site plan

Ways to represent prevailing wind direction and sun path on site plan

Ways to represent prevailing wind direction and sun path on site plan